Responds to Violation Noted in Insp Repts 50-272/84-28 & 50-311/84-27.Corrective actions:check-off Sheet for Safeguards Equipment Cabinet Lineup Completed.No Discrepancies Found
ML20093B602
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/27/1984
From: Liden E
Public Service Enterprise Group
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8410100147
Download: ML20093B602 (3)


Text

_ _ _ _ _ _ _ _

%iO PSEG

' Public Service Eiectric and Gas Company P.O. Box 236 - Hancocks Bridge, New Jersey 08038 Nuclear Department

-September 27, 1984 U.

S.. Nuclear Regulatory Commission segion 1 631' Park' Avenue King of-Prussia, PA 19406 Attention:

Mr.. Richard W.

Starostecki, Director Division of Project and Resident Programs

Dear Mr. Starostecki:

NRC COMBINED INSPECTION 50-272/84-28 AND 50-311/84-27

-SALEM GENERATING STATION UNITS NO. 1 AND 2 DOCKET NOS. 50-272 AND 30-311 The referenced inspection conducted on July 7, 1984 to August 13, 1984, identified one violation of a Technical-Specification involving two examples of failure to follow system alignment procedures.

The following is PSE&G's response to the Notice of Violation:

' ITEM OF VIOLATION Unit 2 Technical Specification 6.8.1 and Regulatory Guide

.l.33, Revision 2, require that. procedures for startup, operation and shutdown of emergency core cooling systems and general procedures for cold shutdown to hot standby be implemented, i.

Operating Procedure (OP) II-4.3.1, Safety Injection System - Normal Operation, requires that Check-off Sheet'1, Safeguards Equipment Cabinet Lineup, be completed.

ii. Integrated Operating Procedure (IOP-2) dated August 6, 1984, Cold shutdown to Hot Standby requires as a

. prerequisite, verification that the Safety Injection System be aligned for operation in accordance with its

\\

0 operating procedure.

8410100147 840927 aI 8

The Energy Peopk)

PDR ADOCK 05000272 G

PDR 95 2168 68CM)1 f 82 i--

r_.

'4 Mr.-R. W.

Starostecki 9/27/84 Contrary to the-Above:

On Augustfl0, 1984, the required procedures were not implemented, in that-there was no completed OP II-4.3.1 Check-off Sheet 1 on file, and an operator signed off the verification of the Safety Injection System required by IOP 2 without identifying and correcting this discrepancy.

1.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS

' ACHIEVED:

--The check-of f sheet for the Safeguards Equipment Cabinet Lineup has been completed.

No discrepancies were found.

2.

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS:

A review of the Integrated Operating Procedures has been performed.

No other discrepancies of this type were identified.

A change has been made to the prerequisite Esection of'IOP-2, which added an operator signoff specifically for the Safeguards Equipment Cabinet Lineup Check-Off. Sheet.

This violation was the result of a procedure inadequacy and the steps taken to correct the

. procedure-will prevent further violation of this type.

'3.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED:

LWe are now in full compliance.

If you have any questions, please feel free to contact us.

Sincerely, E.

A.

Liden Manager - Nuclear Licensing and Regulation g.

C Mr. Donald C.

Fischer Licensing Project Manager Mr. James Linville Senior Resident Inspector

NUCLEAR DEPARTMENT Z. I N WL RESPONSE ACTION FORM - REGULATORY AGENCY Data h k A. Document Identification: b5 MSIf SLg-w[ W-2,7 V *Mnsas: %fuerkhl{w % em a.W d 29fk d

f n n u 4.. m Document Date:

Title:

Date Received C[

Date Response Due i Applicable to:

Salem 1 Entered in RTS d

Date N

( Licensing Besponse Coordinator)

B. Action Requested:

b

~

To:

(Department Manager)

Your department is assigned primary respcnsibility for providing a cmplete respcmse to the docunent described above. Your Response Coordinator should coordinate pre-paration of the response with other other departrents as necessary, ccmpile the regg/ged myterial and transnit the response to the Licensing Response Coordinator

( L (9t/

Please ccmplete Section C of this form and return with your

/

respcnse.

.CC: D MN (Department. Manager)

By copy of this form, your department is assigned responsibility for providing supporting material necessary for the preparation of a respcmse to the above docu-ment. Your Response Coordinator should prepare and forward the required material, listed below, to the Fesponse Coordinator.

Provide response material for:

G-0C.O ~'f* U E.A.Liden, Manager -

JCufW nuclear licensing and Regulation by:

C. Verification of Completed Action Requested Action has been completed.

(Departmental Ebspcnse Coordinator) date Approved:

(Departnant Manager) date D.

Response Disposition Closed out in DIS Bemarks:

Cmmitnants entered in CIS l

Data sutznitted to angulatory Agency Filed (Licensing Pasponse Coordinator.