Revised Application to Amend Licenses DPR-44 & DPR-56, Changing Reactor Water Level Setpoints to Maintain lo-lo & lo-lo-lo Levels,Per 840419 Application
ML20093B653
Person / Time
Site: Peach Bottom  
Issue date: 10/02/1984
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8410100173
Download: ML20093B653 (2)


Text

m:

b n

4 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET T

P.O. BOX 8699 PHILADELPHI A. PA.19101 sa tost.ohinorr (215 841 50o1 n ic 0 c" O' E U,,

October 2, 1984 Docket-Nos. 50-277 50-278

'Mr. John-F.-Stolz Operating, Re' actors Branch 44

' Division of Licensing U.S. Nuclear Regulatory Commission Washin'g ton, D.C.

20555 CE

SUBJECT:

Peach Bottom License ~ Amendment Application submitted April 19, 1984

- I De'ar.Mr.-Stolz:

This letter provides clarification of the analysis

~ provided with-our April 19, 1984, License Amendment Application regarding justification of the current reactor water level trip setpoints.

The clarification was discussed with the Peach Bottom-Project Manager and others of the NRC staff by telephone'on September 6, 1984.

It was requested that this-information be formally submitted in the format of a revision to the second paragraph on page 7~of.the April 19,11984, Application.

Accordingly, this paragraph is revised to read as'follows:

"The proposed changes to the reactor water level setpoints maintain the low-low level (level 2)'and low-low-low levels (level 1) at 490 and 378 inches above vessel zero, respectively.

The dimensional change -

asso :iated with the new fuel design is considered in the Emergency Core Cooling System (ECCS) reload evaluations Lfor, Peach Bottom 2 and 3.

The values for low-low and low-low-low setpoints used in.the ECCS analysis, 486.5 and 366.4 inches above vessel zero, respectively,-

provide' sufficient margin to compensate for instrument error and calibration accuracy.

Additionally, there is an allowance for setpoint drift between the nominal trip setpoint of the instrument and the Technical Specification setpoint value."

8410100173 841002 PDR ADOCK 05000277 P

PDR --.

g

Mr. John F.

Stolz October 2, 1984 Page 2 Should.you have any. questions regarding.'this matter, please'do not hesitate to contact us.

Very truly yours,

/

/