Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1995-035, :on 950906,TS SR for AC Sys Was Misinterpreted Due to Personnel Error.Revised Plant Procedure + (ML20093B051)
- ML20093B062 + (ML20093B062)
- ML20093B065 + (ML20093B065)
- ML20093B069 + (ML20093B069)
- HNP-95-088, Forwards Rev 9 to Security Plan for Shnpp,Per 10CFR50.54(p)(2).Encl Withheld + (ML20093B070)
- ML20093B073 + (ML20093B073)
- ML20093B081 + (ML20093B081)
- ML20093B083 + (ML20093B083)
- ML20093B086 + (ML20093B086)
- ML20093B088 + (ML20093B088)
- ML20093B095 + (ML20093B095)
- U-602502, Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker + (ML20093B096)
- RC-95-0254, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-395/95-11.Corrective Actions:Conducted Emergency Plan Drills on Each Operating Shift as Part of Licensed Operator Requalification Training + (ML20093B098)
- 05000333/LER-1995-013-01, :on 950905,discovered Loss Feedwater Flow Transient Due to Personnel Error.Revised Abnormal Operating Procedure AOP-1 + (ML20093B099)
- ML20093B105 + (ML20093B105)
- PMNS20200309, Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and Nuclear Energy Institute /Industry Representatives Discuss the Proposed Draft (Revision 1) to Temporary Instruction 2515/194 + (ML20093B109)
- ML20093B112 + (ML20093B112)
- 05000313/LER-1995-010-01, :on 950904,failed to Establish Alternate Radioactive Gaseous Effluent Sampling within One H Due to Lack of Guidance Re Prioritization for Restoration of Sampling Capability.Inspected Equipment + (ML20093B117)
- ML20093B148 + (ML20093B148)
- ML20093B156 + (ML20093B156)
- NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS + (ML20093B185)
- ML20093B193 + (ML20093B193)
- ML20093B207 + (ML20093B207)
- ML20093B218 + (ML20093B218)
- ML20093B220 + (ML20093B220)
- ML20093B222 + (ML20093B222)
- ML20093B224 + (ML20093B224)
- RBG-18939, Interim Deficiency Rept DR-238 Re Installation of Snubbers PSA 35 & 100 Supplied by Pacific Scientific & Associated Clamps PT 6220-50 & 120 Supplied by Bergen Paterson.Next Rept Will Be Provided by 841205 + (ML20093B228)
- ML20093B232 + (ML20093B232)
- ML20093B235 + (ML20093B235)
- ML20093B241 + (ML20093B241)
- ML20093B243 + (ML20093B243)
- ML20093B244 + (ML20093B244)
- ML20093B250 + (ML20093B250)
- ML20093B251 + (ML20093B251)
- ML20093B254 + (ML20093B254)
- TXX-4312, Deficiency Rept SDAR-147 Re Conax Penetration Connector That Came Off During Removal of Protective Endcap.Initially Reported on 840824.Evaluation Still in Progress.Next Rept Will Be Submitted by 841109 + (ML20093B261)
- ML20093B263 + (ML20093B263)
- RBG-18941, Interim Deficiency Rept DR-212 Re Battery Cell Spacer Matl Supplied by Gould Co.Next Rept Will Be Provided by 841121 + (ML20093B268)
- LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER + (ML20093B271)
- ML20093B278 + (ML20093B278)
- ML20093B283 + (ML20093B283)
- ML20093B318 + (ML20093B318)
- Press Release-20-020, NRC to Discuss Temporary Work-Hour Limit Exemption Guidance for Nations Nuclear Power Plants + (ML20093B324)
- Press Release-20-021, NRC Approves License Transfer of Crystal River 3 Nuclear Power Plant + (ML20093B325)
- Press Release-II-20-006, NRC Schedules Virtual Meeting to Discuss Performance of Framatome Facility + (ML20093B326)
- ML20093B334 + (ML20093B334)
- ML20093B354 + (ML20093B354)
- ML20093B381 + (ML20093B381)
- ML20093B439 + (ML20093B439)
- ML20093B441 + (ML20093B441)