Forwards Final Exercise Rept for 940920,plume Exposure Pathway Exercise of Offsite Radiological Emergency Response Plans
ML20093B278
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/25/1995
From: Hepler O
Federal Emergency Management Agency
To: Crutchfield D
NRC (Affiliation Not Assigned)
Shared Package
ML20093B248 List:
References
NUDOCS 9510110314
Download: ML20093B278 (1)


Text

..

SEP LU " tra - 10 w41 fM/ Div.vr s cAn. mscrv 1.

i Federal Emergency Management Agency k

Washington, D.C. 20472 I

AUG 2 5 l995 1

i Mr. Dennis M. Crutchfield, Director j

Division of Reactor Program Management

~

Office of Nuclear Reactor Regulation j

U.S. Nuclear Regulatory Commission I

Washington, D.C. 20555

Dear Mr. Crutchfield:

f Enclosed is a copy of the final exercise report for the September 20,1994, plume exposure pathway exercise of the offsite radiological emergency response plans site-specific to the Enrico Fermi H Nuclear Power Stadon. The State of Michigan partially participated and l

l Monroe and Wayne Counties fully participated in this exercise. The Detroit Edison Ce=p=ay also participated. He final exercise report was prepared by the Federal

[

j Emergency Management Agency (FEMA) Region V staff. A copy of this report will be provided to the State of Michigan by the FEMA Region V staff.

4 4

i nere were no Deficiencies identified during the September 20,1994, exercise. There were, i

however,18 Areas Requiring Corrective Action identifled. FEMA Region V staff will monitor the status of corrective actions.

Based on the results of the September 20,1994, exercise, the offsite radiological emergency response plans and preparedness for the State of Michigan and the affected local jurisdictions, site-specific to the Enrico Fermi H Nuclear Power Station, can be implemented and are adequate to provide reasonable assurance that appropriate measures can be taken offsite to piotect the health and safety of the public in the event of a radiological emergency

~

at the site. Therefore, the Title 44 CFR, Part 350, approval of the oChico.adiological j

emergency response plans and preparedness for the State of Michigan site-specific to the i

Enrico Fermi H Nuclear Power Station, granted on March 9,1987, will remain in effect.

If you should have any questions, please contact Dr. Anne Marie T. SuPrise, Chief, State and local Regulatory Evaluation and Assessment Branch, at (202) 646-4065.

l Sincerely, b

l bA n,,g i

O. Me Hepler, HI Director PDft kDON Oh0 bob 4t Exercises Division F

PDR Preparedness, Training. and 4

Exercises Directorate r.

l Enclosurc

_.