Interim Deficiency Rept DER 84-37 Re Unauthorized/ Unqualified Duct Sealant.Originally Reported on 840517.Due to Extensive Evaluation & Investigation Required,Info Now Expected to Be Finalized by 841102
ML20093B381
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/19/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30565-TDS, DER-84-37, NUDOCS 8410100043
Download: ML20093B381 (2)


Text

g p.

33 n

,, (

AECE!VED

.~

tmc-Arizona Public Service Company E24 SEP 24 N 4: 05 September 19,AfS8Wiy14F ANPP-30565-TDS/TRB U. S. Nuclear Regulatory Commission Region V

-Creekside Oaks Office Park h

1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of. Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-37 A 50.55(e) Potentially Reportable Deficiency Relating To Unauthorized / Unqualified Duct Sealant.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P! Narbut and T. Bradish on May 17, 1984 (B):ANPP-19714, dated June 12,1984 (Interim Report)

(C) ANPP-30350, dated August 29, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Ref erence ( A), an Interim Repor*. was transmitted by Ref erence (B), and a Time Extension 'was requested by Reference (C). -At that time, it was estimated that a Final Report would be' available by September 20, 1984.-

Due to the' extensive investigation and evaluation required, it' is now expected that ' this information will be finalized by November 2,1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

I Very truly yours, EfCW/

yv E. E. Van B runt, Jr.

O APS Vice President

{

hO O

e PDR Nuclear Production S

ANPP Project Director EEVB/TRs/nj cc:- See Page Two I

f[-g

^;

+.

4 - 'Ngq V

Mr.. T. W. Bishop -

- DER 84-37 Page Two ec:

Richard DeYoung,' Director Office of Inspection and Enforcement

-U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers ~

L. A. Souza.

D. E. Fowler T. D. Shriver C. N. Russo J.' Vorees

- J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L..Fatterson R. W. Welcher H.'D.

Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339

.