Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093A247 + (ML20093A247)
- ML20093A248 + (ML20093A248)
- 05000362/LER-1984-021-01, :on 840602,safety Relief Valve 3PSV-0245 on Nuclear Sample Sys Actuated.Caused by Setpoint on Valve Set Unnecessarily Low.Setpoint Raised & Valve Returned to Svc on 840606 + (ML20093A250)
- ML20093A251 + (ML20093A251)
- ML20093A252 + (ML20093A252)
- ML20093A253 + (ML20093A253)
- ML20093A257 + (ML20093A257)
- TXX-4205, Forwards Revised Schedules for Installation of Accident Monitoring Instrumentation for Reactor Vessel Water Level. Installation Scheduled Prior to End of First Refueling Outage.Amend 50 to FSAR Will Reflect Changes + (ML20093A261)
- AECM-84-0345, Forwards Phase 1B Program,Div I Diesel Generator Disassembly,Reinsp & Verification of Div II Diesel Generator As-Mfg Similarity, Per 840522 Order.Preoperational Testing Will Be Completed by 840707 + (ML20093A266)
- ML20093A268 + (ML20093A268)
- ML20093A269 + (ML20093A269)
- ML20093A273 + (ML20093A273)
- ML20093A275 + (ML20093A275)
- 05000272/LER-1984-014-01, :on 840605,vital Bus 1A Deenergized When Bus Infeed Breaker Failed to Close.Caused by Lack of Adequate Procedural or Administrative Controls.Insp & Tests Performed on Diesel 1A + (ML20093A276)
- ML20093A277 + (ML20093A277)
- ML20093A278 + (ML20093A278)
- 05000346/LER-1984-008, :on 840605,shift Supervisor Notified of Documentation Problem W/Seismic Qualification of Transformer Installed in Two Motor Control Ctrs.Caused by Breakdown in Westinghouse Qa.Also Reported Per Part 21 + (ML20093A282)
- ML20093A283 + (ML20093A283)
- ML20093A287 + (ML20093A287)
- ML20093A290 + (ML20093A290)
- ML20093A294 + (ML20093A294)
- ML20093A295 + (ML20093A295)
- ML20093A301 + (ML20093A301)
- ML20093A316 + (ML20093A316)
- ML20093A318 + (ML20093A318)
- ML20093A320 + (ML20093A320)
- A02399, Discusses Position Re Actuation Logic for Reactor Protection Sys & ESF Actuation Sys.Operation in 2 of 3 Logic Configuration W/One Channel in Bypass Justified.More Restrictive Tech Specs Unnecessary + (ML20093A326)
- ML20093A328 + (ML20093A328)
- ML20093A336 + (ML20093A336)
- ML20093A344 + (ML20093A344)
- ML20093A357 + (ML20093A357)
- ML20093A366 + (ML20093A366)
- ML20093A368 + (ML20093A368)
- ML20093A370 + (ML20093A370)
- ML20093A372 + (ML20093A372)
- ML20093A375 + (ML20093A375)
- ML20093A377 + (ML20093A377)
- RBG-18125, Interim Deficiency Rept DR-200 Re Foreign Substance in Reactor Pressure Vessel.Interim or Final Status Rept Will Be Provided by 840913 + (ML20093A379)
- 05000374/LER-1984-026-01, :on 840609,Div I Leak Detection Isolation Signal Received Causing Isolation Valve 2G33-F004 to Close & Reactor Water Cleanup Pumps to Trip.Cause Unknown.Isolation Logic Reset & Cleanup Sys Restarted + (ML20093A381)
- ML20093A382 + (ML20093A382)
- 05000263/LER-1984-022, :on 840605,reactor Bldg Ventilation Isolation & Standby Gas Treatment Initiation Occurred.Caused by Blown Fuse in Reactor Bldg Spent Fuel Pool Radiation Monitor Channel B.Fuse Replaced + (ML20093A383)
- ML20093A384 + (ML20093A384)
- ML20093A386 + (ML20093A386)
- ML20093A387 + (ML20093A387)
- ML20093A389 + (ML20093A389)
- ML20093A391 + (ML20093A391)
- ML20093A394 + (ML20093A394)
- ML20093A395 + (ML20093A395)
- 05000483/LER-1984-001, :on 840612,hourly Fire Watch Patrols for Four Rooms in Control Bldg Missed.Caused by Door Locks Being Changed to Coincide W/Receipt of OL & New Keys Not Issued Promptly.Appropriate Keys Issued + (ML20093A397)
- NRC-84-0101, Forwards Nonproprietary Equipment Qualification Data Packages,Per May 1984 Request for Addl Info Re Justification for Interim Operation (Jio) & Proprietary Jio Re Seismic Qualification.Jio Withheld (Ref 10CFR2.790) + (ML20093A398)
- ML20093A399 + (ML20093A399)