ML20093A253

From kanterella
Jump to navigation Jump to search
Responds to Request Re Weld Joint Insp Program.Weld Overlays,W/Previous base-metal Indications Longer than 10% of Circumference,Will Be Inspected,Per Generic Ltr 84-11
ML20093A253
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/06/1984
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
FVY-84-78, GL-84-11, NUDOCS 8407100254
Download: ML20093A253 (2)


Text

i o

VERMONT YANKEE NUCLEAR POWER CORPORATION FVY 84-78 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301

,,,ty,o

, g ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 e

TELEPHONE 617-872-8100 July 6, 1984 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

References:

a License No. DPR-28 (Docket No. 50-271) b Letter, VYNPC to USNRC, FVY 84-22, dated 3/13/84 c

Letter, USNRC to All BWR Licensees, dated 4/19/84 (Generic Letter 84-11)

Ocar Sir:

Subject:

Vermont Yankee Weld Joint Inspection Program By letter dated March 13, 1984 [ Reference b)], we provided you with our

, rogram for inspection of the Recirculation System and other Reactor Coolant p

Boundary Piping Systems during our 1984 refueling outage.

During subsequent conference calls, members of your staff requested additional information regarding our plans for inspecting previously uninspected weld joints.

Spet.ifically, your staff requested that we provide, by pipe size, the number of previously uninspected weld joints which are being inspected during our 1984 refueling outage. These numbers are as follows:

Number of Welds Pipe Size Beir.g Inspected 20" 4

22" 4

24" 4

28" 5

9407100254 840606 h

PDR ADOCK 05000271 0

PDR I

"* U.S. Nuclear Regulatory Commission July 6, 1984 Pag] 2 VlillMONT YANKist NUCLliAll POW 1?ll COlll'OllATION For each of the pipe sizes, the quantity of welds represents at least a 20 percent sample by pipe size of the total uninspected weld population (minimum of 4 welds), consistent with the criteria of Generic Letter 84-11.

If necessary, the sample will be expanded to include an equivalent quantity of previously uninspected welds in each pipe size found to contain Intergranular Stress Corrosion Cracking.

We also want to inform you that we now intend to inspect all weld overlays which had previous base-metal indications longer than 107,of the circumference, consistent with the requirements of Reference c).

This will expand our overlay inspection program from 12 to 17, and will include the remaining sweepolet-to-riser welds.

In addition, your staff has requested confirmation that we are planning to replace the Reactor Recirculation and Residual Heat Removal System stainless j

steel piping in 1985. This is to reaffirm our intent to accomplish this replace-ment beginning in September 1985.

If you need any further information, please contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION

.=^