Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092N487 + (ML20092N487)
- 05000374/LER-1984-009, :on 840308,isolation Signal Generated,Causing RHR Loop a to Isolate.Caused by Personnel Leaving 2E12-F008 Valve Breaker in Off Position & Spare Riley Alarm & Trip Module Failure + (ML20092N489)
- ML20092N491 + (ML20092N491)
- ML20092N493 + (ML20092N493)
- ML20092N495 + (ML20092N495)
- ML20092N497 + (ML20092N497)
- ML20092N498 + (ML20092N498)
- ML20092N501 + (ML20092N501)
- ML20092N502 + (ML20092N502)
- ML20092N504 + (ML20092N504)
- ML20092N505 + (ML20092N505)
- ML20092N506 + (ML20092N506)
- ML20092N507 + (ML20092N507)
- 05000272/LER-1984-012-01, :on 840527 & 30,radiography Results Revealed That Disk Became Detached from Stem of Valves 11SJ16,21SJ16 & 22SJ16.Caused by Weld Matl Missing from Disk Hole Allowing Disk to Unthread from Disk Nut + (ML20092N510)
- 05000397/LER-1984-058, :on 840607,control Room Emergency Filtration Unit Inadvertently Initiated Due to Technician Performing Maint on Associated Radiation Monitoring Sample Rack.Caused by Voltage Transient.Alarms Reset + (ML20092N511)
- ML20092N513 + (ML20092N513)
- ML20092N517 + (ML20092N517)
- ML20092N520 + (ML20092N520)
- ML20092N523 + (ML20092N523)
- ML20092N524 + (ML20092N524)
- 05000302/LER-1984-001-01, Updated LER 84-001-01:on 840113,end Cap on Reactor Bldg Side of Spare Penetration 3531 Mistakenly Cut Off.Caused by Personnel Failure to Follow Applicable Engineering Procedures.Personnel Retrained + (ML20092N526)
- 05000317/LER-1984-006, :on 840531,axial Power Distribution Pretrip Alarm Occurred on Channel a of Reactor Protection Sys.Caused by Disconnected Signal Lead from Upper Detector.Procedure Changes & Review of Event Will Be Accomplished + (ML20092N527)
- ML20092N529 + (ML20092N529)
- ML20092N531 + (ML20092N531)
- ML20092N532 + (ML20092N532)
- ML20092N533 + (ML20092N533)
- ML20092N535 + (ML20092N535)
- ML20092N536 + (ML20092N536)
- ML20092N538 + (ML20092N538)
- 05000255/LER-1984-006-01, :on 840612,US Ecology Notified That Ack of Receipt of Radioactive Shipment 84-035-S Not Received. Shipment Trace Initiated on 840612.Receipt & Burial of Shipment Confirmed on 840613 + (ML20092N540)
- 05000397/LER-1984-057, :on 840605 & 12,false High Chlorine Signal from Ventilation Chlorine Detector,On Sample Rack WOA-SR-15, Started Control Room Emergency Filtration Sys.Caused by Depletion of Paper Tape.Tape Replaced + (ML20092N542)
- TXX-4210, Forwards Evaluation of Paint & Insulation Debris Effects on Containment Emergency Sump Performance, Per Discussion at 840607 Meeting.Analyses Indicate That Protective Coating Inside Containment Need Not Be safety-related + (ML20092N543)
- ML20092N547 + (ML20092N547)
- ML20092N548 + (ML20092N548)
- ML20092N549 + (ML20092N549)
- ML20092N553 + (ML20092N553)
- ML20092N554 + (ML20092N554)
- 05000362/LER-1984-023-01, :on 840601 & 11,during Turbine Overspeed Protection Test,Reactor Trip Occurred Involving RCS Specific Activity.Caused by Iodine Spiking.Primary Coolant Activity Will Be Monitored & Evaluated + (ML20092N555)
- 3F0684-16, Provides Schedule to Complete Emergency Dose Assessment Sys Project,Per NUREG-0737,Suppl 1,Items 1.C.1,1.D.1,1.D.2, III.A.1.2 & III.A.2.2.Project Should Be Completed by 841231 + (ML20092N556)
- ML20092N558 + (ML20092N558)
- ML20092N562 + (ML20092N562)
- 05000334/LER-1984-004, :on 840524,generator Trip Initiated Turbine Trip & Subsequent Reactor Trip.Caused by Random end-of-life Transistor Failure in Generator Exciter Voltage Regulator. Transistor Replaced + (ML20092N563)
- ML20092N566 + (ML20092N566)
- ML20092N569 + (ML20092N569)
- ML20092N573 + (ML20092N573)
- ML20092N574 + (ML20092N574)
- ML20092N576 + (ML20092N576)
- ML20092N577 + (ML20092N577)
- ML20092N579 + (ML20092N579)
- ML20092N586 + (ML20092N586)
- ML20092N587 + (ML20092N587)