Instrument Surveillance - NRC Data Collection Program - Units 1 & 2,May 1983 - May 1984
ML20092N532
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/26/1984
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20092N530 List:
References
PROC-840626, NUDOCS 8407030249
Download: ML20092N532 (232)


Text

,~',.

( UARTERLY EILLANCE DATA (

y j) ,

~_-

)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340A (PB-455A)

FUNCTIONAL UNIT

SET POINT *t 5 2385 psig (.4425V)

ALLOWABLE VALUE *t , 5 2395 psig (.447V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .4420V .4420V 08-19-83 .4422V .4422V 11-17-83 .4422V .4422V '

02-20-84 .4425V .4425V

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 8407030249 840626 PDR ADOCK 05000327 P PDR

p,. ~. ,

pm

( ) OUARTERLY EILLANCE DATA f N ./Y'

\ ,) a SEQUOYAH NUCLEAR PLANO CHANNEL PS-68-334A'(PB-456A)

, FJNCTIONAL UNIT

SET POINT *t 5 2385 psig (.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V)

SET POINT SET POINT DATE AS FOUND t g AS LEFT t 07-29-83 .4434V .4434V 10-26-83 .4433V .4433V 02-02-84 .4436V .4436V 04-25-84 .4428V .4428V V

4 NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,/) z l

\ ') UARTERLY EILLANCE DATA (  !

C/

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-323A (PB-457A)

FUNCTIONAL UNIT

SET POINT *t 5 2385 psig (.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V)

SET FOINT SET POINT DATE AS FOUND t AS LEFT t 07-01-83 .4427V .4427V 10-03-83 .4427V .4427V 01-03-84 .4418V .4418V 4

04-09-84 .4420V .4420V W

Q NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,s ,

- s, I I

\ ) UARTERLY EILLANCE DATA (

s. J

)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-322A (PB-458A)

FUNCTIONAL UNIT

SET POINT *t 5 2385 psig (.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V) ,

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-02-83 .4429V .4429V 09-02-83 .4431V .4431V 12-05-83 .4426V .4426V 03-07-84 .4430V .4430V 4 .

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units d

[

[

'q)' UARTERLY EILLANCE DATA  ! )

\~J .

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340E-(PB-453C)

FUNCTIONAL UNIT

SET POINT *t > 1970 psig (.2350V)

ALLOWABLE VALUE *t > 1960 psig (.230V) l SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .2354V .2354V 08-19-83 .2354V .2354V 11-17-83 .2358V .2358V 02-20-84 .2357V .2357V

~

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,~ ,,-.

i ) QUARIERLY EILLANCE DATA l 's L.) \, /

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-334B (PB-456C)

FUNCTIONAL UNIT

SET POINT *t 2 1970 psig (.2350V)

ALLOWABLE VALUE *t 1 1960 psig (.230V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .2355V .23557 10-26-83 .2362V .2362V 02-02-84 .2358V .2358V 04-25-84 .2358V .2358V 's t

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

/

,s /an

/ ) UARTERLY EILLANCE DATA (

(g N_;!

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-323B-(PB-457C)

FUNCTIONAL UNIT

SET POINT *t > 1970 psig (.2350V)

ALLOWABLE VALUE *t > 1960 psig ( 230V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-01-83 .2340V .2340V 10-03-83 .2343V .2343V 01-03-84 .2352V .2352V 04-09-84 .2351V .2351V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4
t Units should be consistent, either voltage or engineering units

(-

{ ) UARTERLY ILLANCE DATA i

,~

I wJ G SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-322D (PB-458C)

FUNCTIONAL UNIT

SET POINT *t 2 1970 psig (.2350V)

ALLOWABLE VALUE *t 2 1960 psig (.230V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-02-83 .2349V .2349V 09-02-83 .2349V .2349V 12-05-83 .2342V .2342V 03-07-84 .2349V .2349V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

1

(\ ) UARTERLY EILLANCE DATA j

/ (

Na SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340B/D (PS-455B/D)

FUNCTICNAL UNIT

  • Pressurizer Pressure - Manual Block of Safety Injection P-11 SET POINT *t 5 1970 psig.(.2350V)

ALLOWABLE VALUE *t 5 1980 psig (.240V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .2355V .2355V 08-19-83 .2353V .2353V 11-17-83 .2356V .2356V 02-20-84 .2354V .2354V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,-s

( ) QUARTERLY EILLANCE DATA '

) (L_j)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-334E/D (PS-456B/D)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Manual Block of Safety Injection P-11 SET POINT *t 5 1970 psig (.2350V)

ALLOWABLE VALUE *t - 5 1980 psig (.240V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .2350V .2350V 10-26-83 .2350V .2350V 02-02-84 .2355V .2355V 04-25-84 .2351V .2351V NOTE:

  • As defined i- echnical specification tables 2.2-1 and 3.3-4 t Units should 3 consistent, either voltage or engineering units

( l UARTERLY EILLANCE DATA [ I

\ )

m_ \ _)

s SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-323E/D (PS-457B/D)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Manual block of Safety Injected P-11 SET POINT *t 5 1970 psig (.2350V)

ALLOWABLE VALUE *t i 1980 psig (.240V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-01-83 .2348V .2348V 10-03-83 .2346V .2346V 01-03-84 .2347V .2347V 04-09-84 .2349V .2349V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

e

[ ) UARTERLY EILLANCE DATA l }

Q,,)  %,_.//

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340D/B (PB-455D/B)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Low (Safety Injection)

SET POINT *t > 187C psig (.1850V)

ALLOWABLE VALUE *t > 1860 psig (.180V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .1858V .1858V 08-19-83 .1855V .1855V 11-17-83 .1857V .1857V 02-20-84 .1857V .1857V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

j#FD.

( ARTER EILL MAN ('

' w ./] v

)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-334D/E (PB-456D/B)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Low (Safety Injection)

SET POINT *t > 1870 psig (.1850V)

ALLOWABLE VALUE *t < 1860 psig (.180V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .1849V .1849V 10-26-83 .1850V .1850V 02-02-84 .1850V .1850V 04-25-84 .1851V .1851V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,_ '~ *

( .

UARTERLY EILLANCE DATA [ j

\ . _ ,)

N. /'_.

SEQUOYAH NUCLEAR PLAMT CHANNEL PS-68-323D/E (PB-457D/B)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Low (Safety Injection)

SET POINT *t 2 1870 psig (.1850V)

ALLOWABLE VALUE *t 3 1860 psig (.180V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-01-83 .1847V .1847V 10-03-83 .1846V .1846V 01-03-84 .1847V .1847V 04-04-84 .1850V .1850V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,7 --_-.

( ) UARTERLY EILLANCE DATA j a ( - .

SEQUOYAH NUCLEAR PLANT CHANNEL LS-68-339A/B (LB-459A/B)

FUNCTIONAL UNIT

SET POINT *t 5 92% (5 4680V)

ALLOWABLE VALUE *t 5 93% (5 4720V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .4679V .4679V 08-19-83 .4679V .4679V 11-17-83 .4673V .4673V O2-21-84 .4678V .4678V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) UARTERLY EILLANCE DATA SEQUOYAH NUCLEAR PLANT (d

N l

CHANNEL LS-68-335A/B (LB-460A/B)

FUNCTIONAL UNIT

  • Pressurizer Water Level - High Reactor Trip SET POINT *t 5 92% (5 4680V)

ALLOWABLE VALUE *t j 93% (5 4720V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .4685V .4685V 10-26-83 .4683V .4683V 02-03-83 .4683V .4683V C4-25-84 .4684V .4684V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) UARTERLY ILLANCE DATA l w.- -

SEQUOYAH NUCLEAR PLANT CHANNEL LS-68-320A/B (LB-461A/B)

FUNCTIONAL UNIT

  • Pressurizer Water Level - High Reactor Trip SET POINT *t 5 921 (5 4680V)

ALLOWABLE VALUE *t _ J 93% (5 4720V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-01-83 .4681V .4681V 10-03-83 .4681V .4681V 01-03-83 .4682V .4682V 04-09-84 .4681V .4681V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( -n '

( ') UARTERLY EILLANCE DATA (

\

~

/ C/

SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-6A (FB-414A)

FUNCTIONAL UNIT

  • Lo_ss of Flow SET POINT *t > 90% (>.3678V)

ALLOWABLE VALUE *t > 89% (>.3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83' .3677V .3677V 08-19-83 .3677V .3677V 11-21-83 .3678V .3678V 02-21-84 .3678V .3678V 4

J NOTE: ~

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

-m (v QUARTERLY EILLANCE DATA  !

)

SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-6B (FB-415A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 3 90% (2 3678%)

ALLOWABLE VALUE *t  ? 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t_ AS LEFT t 07-29-83 .3678V .3678V 10-26-83 .3683V .3683V 02-02-84 .3682V .3682V 04-25-84 .3680V .3680V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

. ~ --

[ \ UARTERLY EILLANCE DATA

[~\)

(

) j SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-6D (FB-416A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t  ? 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-01-83 .3675V .3675V 10-03-83 .3675V .3675V 01-03-84 .3673V .3673V 04-09-84 .3676V .3676V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,, ' ~ '

/ ') UARTERLY EILLANCE DATA ( i

'\ ,/ 'v' SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-29A (FB-424A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 1 90% (1 3678V)

ALLOWABLE VALUE *t 2 89% (1 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .3674V .3674V 08-19-83 .3675V .3675V 11-21-83 .3678V .3678V 02-21-84 .3677V .3677V l

l NOTE:

  • As defined in technical specification-tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units I

p

( ) UARTERLY EILLANCE DATA ( )

L) 'wJ SEQUOYAI' NUCLEAR PLANT CHANNEL FS-68-29B (FB-425A) ,

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .3675V .3675V 10-26-83 .3676V .3676V 02-02-84 .3674V .3674V 04-25-84 .3776V .3776V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( } UARTERLY ILLANCE DATA t j

SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-29D (FB-426A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t  ? 90% (2 3678V)

ALLOWABLE VALUE *t  ? 89% (?.3618V)

SET POINT EET POINT DATE AS FOUND t AS LEFT t 07-01-83 .3673V .3673V 10-03-83 .3673V .3673V 01-03-84 .3682V .3682V 04-09-84 .3682V .3682V NOTE:

  • As defined ir 3chnical specification tables 2.2-1 and 3.3 '

t Units should 1a consistent, either voltage or engine.ering u;its

) UARTERLY ILLANCE DATA SEQUOYAH NUCLEAR PLA!&

CILMINEL FS-68-48A (FB-434A)

FUNCTIONAL UNIT

  • Loss of Flow SET POI!C *t  ? 901 (3 3678V)

ALLOWABLE VALUE *t  ? 891 (?.3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t-05-23-83 .3676V .3676V 08-19-83 .3676V .3676V 11-21-83 .3671V .3671V C2-21-84 .3676V .3676V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

llllI  ! i l

g T

NT I

OT VVVV PF 3447 E 7777 TL 6666 E 3333 SS A

s t

i A 4n T u A 3. g D r h 3n E A i C L dr N P ne A ae L R n L A 1i g

I E T L 2. ne C 2 U r N so H e l e Y A bg L Y a a

x. O tt t U Tt l 1 Q N no R E IO ov A S O? VVV7 i U PU 3447 tr TF O 7777 6666 ae E 3333 ch it SS fi A ie

)

c, e

. V pt 8

1 sne 6 lt w 3 as o

l 3 ci F ) ( is

) 7 n n A f o

8 *. h o 5

3 7

6 9

8 cc e

4 s 3

- s  ? te B o 3 b F L ( n

(

id 3

3

  • 7 9

t

  • du l

4

- T  ? E eo 3 I U nh 6 I i s

- L f S C t A es F

  • V dt

)

- L i

- A N  ?.

" E sn L

I L AU C I E 3344 E I O A 88$8

  • T I

C T F v - - - -  :

2 O r E 9625 t 2

T T 22C2 2 J - - - -

E C E r A 7024 G C F S A D 01 CC N

,, ,- m (s- ) UARTERLY EILLANCE DATA SEQUOYAH NUCLEAR PLANT

(-)

c?, EL FS-68-48D (FB-43sA)-

ICTIONAL UNIT

  • Los of Flow- -

SET POINT *t > 90% (>.3678V)

' .,y -'

r ,
  1. ,LLOWABLE)VALUE;*tp[.

A p 89% (>.3618V) ,

/ , f lj

  • li,~ ,

/

,)- ,

a .

f, SET POINT SET POINT DATE '

  • AS FOUND t AS LEFT t i

07-01-F3 .3679V .3679V 10-03-83 -

.3679V .a679V 01-03-84 .3680V .3680V 04-09-84 .3685V. .3685V t \ s ,

i s ~

/ ,

, s i

b g  : ,/

v r

1

/

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

A

,~~ ,~

(  ; UARTERLY EILLANCE DATA- ( 4

\, \ '

,/

~_-

SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-71A (FB-444A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT T 05-23-83 .3681V .3681V 08-19-83 .3681V .3681V 11-21-83 .3683V , .3683V 02-21-84 .3686V .3686V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units s

i

,m , , .

(%_J'} UARTERLY EILLANCE DATA ( )

'O SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-71B (FB-445A)

FUNCTIONAL UNIT

  • Loss of Flow 4

SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .3672V .3672V 10-26-83 .3671V .3671V 02-02-84 .3671V .3671V 04-25-84 .3677V .3677V i

NOTE:

  • As defined in technical specificacion tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

x l ) UARTERLY EILLANCE DATA '

%) )

SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-71D (FB-446A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 2 90% (2/3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET POINT SET POIN'r DATE AS FOUND t AS LEFT t 07-01-83 .3676V .3676V 10-03-83 .3C!?V .3676V 01-03-84 . 36cW .3684V 04-09-84 .3677V .3677V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

(-

(,

g j)

UARTERLY EILLANCE DATA (,

v J

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-42A/B (LB-517A/B)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t $ 76% (.404V)

SET' POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .3999V .3999V 09-02-83 .4002V .4002V 12-05-83 .4002V .4002V 03-07-84 .4003V .4003V i

i i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 4

i

A'

( l

UARTERLY EILLANCE DATA  ! j

%.J SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-39A/B (LB-518A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .3998V .3998V

, 09-19-83 .3997V .3997V 12-20-83 .3993V .3993V 04-11-84 .3996V .3996V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i  ? Units should - consistent, either voltage or engineering units

,m ,~a

/ UARTERLY EILLANCE DATA l )

Y._,l\ \ ..]

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-38A/B (LB-519A/B)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .4006V .4006V 10-26-83 .4006V .4006V 02-03-84 .4010V .4010V 04-25-84 .4004V .4004V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

T Nt I

OT VVVV PF 5542 E 0000 TL 0000 E 4444 SS A

s t

i A 4n T -u 3

A .g D T 3n N i E A dr C L ne N P ae A n L R 1i L A g I E E

L 2. ne C

  • 2 U ) r a wN H

h i

H g so e

le Y A - bg L Y h aa R O g tt E U i Tt l T Q H N no

(

R E ID ov A S l ON VVVV i U e PU 5542 tr Q v O 0000 ae e TF 0000 L 4444 ch E it r SS fi e A ie t

a ce, W pt r

o

)

V sn t 4 e

a 0 lt

) r 4 as B e ci

/ n ( is A e nn 7 G  % ho 2 ) 6 5 m V 7 cc

- a 0 e B e 4 5 te L t b

( S (

n B  % t id

/ 5 l A

  • 7
  • du 5

5 T 5 E eo

- nh 3

I U is

- N L f S U t A es L

  • V dt L i A T E sn N N L AU L O I B 3334 E I O A 8888 *t N T P W - - - - :

N C O E 6257 E A N T L T 0000

- - - - T H U E L A 6923 O C F S A D 001 0 N l li

, 'i ,r's (d

\

QUARTERLY EILLANCE DATA SEQUOYAH NUCLEAR PLANT

'( j.

CHANNEL LS-3-52A/B (LB-528A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t_ $ 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t

, 06-15-83 .4004V .4004V 09-19-83 .4003V .4003V 12-20-83 .4004V .4004V 04-11-84 .4003V .4003V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

, _s 7 ~x

/ '

UARTERLY EILLANCE DATA N,,)) ( l

x. .J '

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-51A/B (LB-529A/B)

FUNCTIONAL UNIT

SET POINT *t < 75% (.40V)

ALLOWABLE VALUE *t _< 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .4002V .4002V 08-19-83 .4003V .4003V 11-21-83 .4002V .4002V 02-22-84 .4003V .4003V 4

i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

[~'N UARTERLY EILLANCE DATA y

)

SEQUOYAH NUCLEAR PLANT fv)

CHANNEL LS-3-97A/B (LB-537A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .3993V .3993V 09-02-83 .3994V .3994V 12-05-83 *

.3995V .3995V 03-07-84 .3992V .3992V 4

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,e EILLANCE DATA (v) QUARTERLY (,.

v

)

'SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-94A/B (LB-538A/B)

FUNCTIONAL UNIT

SET POINT *t $ 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .4003V .4003V 09-19-83 .4002V .4002V 12-20-83 .3995V .3995V 04-11-84 .4002V .4002V i

1 NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

g% .< 4 UARTERLY EILLANCE DATA ( )

(O) NJ SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-93A/B (LB-539A/B)

FUNCTIONAL UNIT

SET POIh"' *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t

05-23-83 .4002V .4003V 08-19-83 .4002V .4002V 11-21-83 .4002V .4002V 02-22-84 .4005V .4005V NOTE

,

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units
  • m w y - - - - -

.w w - -r -

ARTER EIIJ.ANCE DATA (  !

(U) w .-

SEQUOYAH NUCLEAR PLANT E

CHANNEL LS-3-110A/B (LB-547A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V) 9 SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .4002V .4002V 09-02-83 .4000V .4000V 12-05-83 .4001V .4001V 03-07-84 .4008V .4008V F

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should he consistent, either voltage or engineering units 1

pf"%

/

( ') UARTERLY EILLANCE DATA ( )

\ ,

)  %/

SEQUOYAH NUCLEAR PLANT-CHANNEL LS-3-107A/B (LB-548A/B) t FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .4005V .4005V 09-18-83 .4005V .4005V 12-20-83 .4003V .4003V 04-11-84 .4005V .4005V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should he consistent, either voltage or engineering units 4

,. , , ~

fA l UARTERLY EILLANCE DATA I v / 'N_,,- '

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-106A/B (LB-549A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t $ 76% (.404V)

SET POINT SET POINT l DATE AS FOUND t AS LEFT t 07-29-83 .4005V .4005V 10-26-83 .4003V .4003V 02-03-84 .4005V .4005V 04-25-84 .4004V .4004V NOTE:

I

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

EILLANCE DATA  ;

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-42B/A (LB-517B/A)

FUNCTIONAL UNIT

SET POINT *t > 18% (.1720V)

ALLOWABLE VALUE'*t >17% Q.1680V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 06-06-83 .1725V .1725V 09-02-83 .1728V .1728V 12-05-83 .1727V .1727V 03-07-84 .1723V .1723V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units ;hould be consistent, either voltage or engineering units

( ) EILLANCE DATA ( )

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-39B/A (LB-518B/A)

FUNCTIONAL UNIT

SET POINT *t  ? 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1719V .1719V 09-19-83 .1720V .1720V 12-20-83 .1718V .1718V 04-11-84 .171ov .1719V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,e\

f's._,/') UARTERLY EILLANCE DATA ('v' )

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-38B/A (LB-519B/A)

FUNCTIONAL UNIT

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 1 17% (2 1680V) 4 SET POINT SET POINT DATE AS FOUND *_ AS LEFT t 07-29-83 .1719V .1719V 10-26-83 .1719V .1719V 02-03-84 .1719V .1719V

, 04-25-84 .1719V .1719V i

i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

h) j UARTERLY EILLANCE DATA -

(a, SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-55B/A (LB-527B/A)

FUNCTIONAL UNIT

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .1716V .1716v 04-02-83 .1719V .1719V 12-05-83 .1725V .1725V 03-07-S4 .1719V .1719V 4

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units'

,n /m

( ) UARTERLY EILLANCE DATA (x__  ;

\ ,e /

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-52B/A (LB-528B/A)

FUNCTIONAL UNIT

SET POINT *t 318% (.1720V)

ALLOWABLE VALUE *t 217% (1 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1720V .1720V 09-19-83 .1720V .1720V 12-20-83 .1722V .1722V 04-11-84 .1722V .1722V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

./

[x UARTERLY ILLANCE DATA I,

)

j ,

s_-

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-51B/A (LB-529B/A) l FUNCTIONAL UNIT

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (1 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .1719V .1719V 08-19-83 .1719V .1719V 11-21-83 .1719V .1719V 02-22-84 .1723V .1723V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,. ,,~ \

(J x

) RTERLY EILLANCE DATA SEQUOYAH NUCLEAR PLANT

( )

CHANNEL LS-3-97B/A (LB-537B/A)

FUNCTIONAL UNIT

SET POINT *t > 18% (.1720V)

ALLOWABLE VALUE *t t 17% (2 1680V) i SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .1719V i .1719V 09-02-83 .1725V .1725V 12-05-83 .1721V .1721V 03-07-84 .1717V .1717V t

I k

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i t Units should be consistent, either voltage or engineering units 4

a' '

[ h UARTERLY EILLANCE DATA t'  !

\ ,I 'n../

SEQUOYAH NUCLEAR PLANT CHANNEL LG-3-94B/A (LB-538B/A)

FUNCTIONAL UNIT

SET POINT *t > 18% (.1720V)

ALLOWABLE VALUE *t > 17% (>.1680V) l SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1719V .1719V 09-19-83 .1719V .1719V 12-20-83 .1718V .1718V 04-11-84 .1719V .1719V i

i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

_er=-18' s O

[ UARTERLY ILLANCE DATA ( j' Q,_,;j ' < w' SEQUOYAH NUCLEAR PLANT-CHANNEL LS-3-93B/A'(LB-539B/A)

FUNCTIONAL UNIT *- Steam Generator Water Level (Low-Low)

SET POINT *t >-18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 .1718V .1718V 08-19-83 .1718V .1718V 11-21-83 .1718V .1718V 02-22-84 .1723V .1723V i

I UOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 1.

1

, ,- - , - ,w-- - . , - v

UARTERLY EILLANCE DATA  ?

\

w] \

..,/

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-110B/A (LB-547B/A)

FUNCTIONAL UNIT

  • St.eam Generator Water Level (Low-Low)

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 j .1727V .1727V 09-02-83 .1731V .1731V l 12-05-83 .1713V .1713V 03-07-84 .1715V .1715V l >

i f

) .

i l

< NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,~ ,.

( ) UARTERLY ILLANCE DATA if )

\_ _ ' N_/

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-107B/A (LB-548B/A)

FUNCTIONAL UNIT

SET POINT *t 1 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1721V .1721V 09-19-83 .1721V .1721V 12-20-83 .1721V .1721V 04-11-84 .1721V .1721V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

(,-)

N,_/

UARTERLY ILLANCE DATA t SEQUOYAH NUCLEAR FLANT CHANNEL LS-3-106B/A (LB-549B/A)

FUNCTIONAL UNIT

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (>.1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-29-83 .1717V .1717V 10-26-83 .1718V .1718V 02-03-84 * .1718V .1718V 04-25-84 .1717V .1717V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units .

l T QUARTERLY EILLANCE DATA

['y Q ,) (

%J

)

SEQUOYAH NtJCLEAR PLANT CHANNEL LS-3-42F (LB-517C) .

FUNCTIONAL UNIT

SET POINT *t > 25% (.2V) J 4 9 ALLOWABLE <VALUE *t > 24% (.196V) -

4 , . g w

' /

/

if j ,M,3 ,

f

, D 'i '

j ,q, b{-,

. .- 1 <

q' <

> SET PCINT

~

f '

I v ,

SET FOINT , >.

I DATE AS FOUND t '

/

AS LEFT t - 4

/

06-06-83 .2005V .2005V 09-02-83 ,

.2009V .2009V ,

, 12-05-83 .2007V .2007V 03-07-84 .

.2003V .2003V

,- - i

  • \

.s s 4

i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 1

1 6

f UARTERLY EILLANCE DATA ('x_,,J) i\ }+

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-39D (LB-518C)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t 2 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1996V .1996V 09-19-83 .1994V .1994V 12-20-83 .1997V .1997V 04-11-84 .1995V .1995V

l NOTE:
  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units -

,m, g\

(  ! UARTERLY ILLANCE DATA  !

)

\_ ) 'N _.)

SEQUOYAH NUCLEAR PLANT CHANNEL. LS-3-55F (LB-527C)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t > 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .2005V .2005V 09-02-83 .2011V .2005V 12-05-83 .2007V .2007V 03-07-84 .2005V .2005V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

7-- s j ) UARTERLY EILLANCE DATA  ;

i

%- ) ~

'R -) .

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-52D (LB-528C)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t 2 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .2007V .2007V 09-19-83 .2005V .2005V 12-20-83 .2007V .2007V 04-11-84 .2007V .2007V

NOTE
  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

[ EILLANCE DATA I SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-97F (LB-537C)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t _ >_ 24% (.196V)

SET POINT SET POINT

! DATE AS FOUND t AS LEFT t 06-06-83 .2000V .2000V 09-02-83 .2005V .2005V 12-05-83 .2003V .2003V 03-07-84 .1999V .1999V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

rx ,

( } QUARTERLY EILLANCE DATA ( '

\j x y SEQUOYAH NUCLEAR PLANT S

CHANNEL LS-3-94D (LB-538C)

FUNCTIONAL UNIT

  • Steani Generator Water Level Low SET POINT *t > 25% (.2V)

ALLOWABLE VALUE *t > 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .2002V .2002V 09-19-83 .2003V .2003V 12-20-83 .1999V .1999V 04-11-84 .1998V .1998V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

i UARTERLY EILLANCE DATA j

\ ] _j SEQUOYAH NUCLEAR PLANT f

CHANNEL LS-3-110 (LB-547C)

FUNCTIONAL UNIT

  • Steam Generat r Water Level Low SET POINT *t 1 25% (.2V)

ALLOWABLE VALUE *t 1 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .1999V .1999V 09-02-83 .2000V .2000V 12-05-83 .2004V -

.2004V 03-07-84 .1999V .1999V 1

i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent; either voltage or engineering units

,,- /~.

l l UARTERLY EILLANCE DATA'  !

l'

\ / ,\ _ ,J-SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-107D (LB-548C)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t _ < 24% (.196V)

SET POINT SET POINT i

DATE AS FOUND i AS LEFT t 06-15-83 .1999V

~

.1999V 09-19-83 .1998V .1998V 12-20-83 .1998V .1998V 04-11-84 .1996V .1996V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

~

p_.

l UARTERLY EILLANCE DATA

{ 's  !

) n. ]

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-3A (FB-512B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident With Steam Line Pressure Low SET POINT *t Actual Steam Flow-Steam Flow Reference 5 (.0V)

ALLOWABLE VALUE *t Actual Steam Flow-Steam Flow Reference 1 (.0062V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 08-10-83 .0004V .0004V 11-10-83 .0003V .0003V 02-10-84 .0003V .0003V 05-17-84 .0005V .0005V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

.a

)

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-3B (FB-513B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines High Coincident With Steam Line Pressure Low SET POINT *t Actual Steam Flow - Steam Flow Reference 5 (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference 5 (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-14-83 .0003V .0003V 10-12-83 .0007V .0007V 01-12-84 .0010V .0010V 05-04-84 .0009V .0001V NOTE:

  • As defined i.. echnical specification tables 2.2-1 and 3.3-4 t Units should b, consistent, either voltage or engineering units

,, /~~

x t' i j ) UARTERLY ILLANCE DATA i  !

Q 'J SEQUOYAH NUCLEAR PLANT 5

CHANNEL FS-1-10A (FB-522B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident With Steamline Pressure Low SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT D A T_E_ AS FOUND t AS LEFT t 08-10-83 .0002V .0002V 11-10-83 .0005V .0005V 02-10-84 .0010V .0010V 05-17-84 .0004V .0004V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 1

i

__ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ + w - . -

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-10B (FB-523B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines High Coincident With Steam Line Pressure Low 4 SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .0003V .0003V 10-12-83 .0002V .0002V 01-12-84 .0001V .0001'1 05-04-84 .0001V .0001V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

\

i UARTERLY ILLANCE DATA ( I

,I '

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-21A (FB-532B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines liigh Coincident With Steamline Pressure Low SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t , Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .0003V .0003V 11-14-83 .0003V .0003V 02-13-84 .0002V .0002V 05-17-84 +.0002V +.0002V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be cr%istent, either voltage or engineering units

I

) UARTERT.Y EILLANCE DATA j x ,

SEQUOYAH NUCLEAR PLANT CHANNEL FS-I-21B (FB-533B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines High Coincident With Steam Line Pressure Low SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .0008V .0008V 10-12-83 .0011V .0011V 01-12-84 .0003V .0003V 05-04-84 .0002V .0002V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units I

e

i

) UARTERLY EILLANCE DATA ,!

x - ._

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-28A (FB-542B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident -

With Steam Line Pressure Low SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .0002V .0002V 11-14-83 .0006V .0006V i

02-13-84 .0014V .0014V 05-17-84 .0002V .0002V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,ox s

[ T UARTERLY EILLANCE DATA ,! .

\, ,-

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-28B (FB-543B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines fligh Coincident With Steam Line Pressure Low SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t _ Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .0dOOV .0000V 10-12-83 .0005V .0005V 01-12-84 .0002V .0002V 05-04-84 .0008V .0008v NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,. ,m f I UARTERLY EILLANCE DATA '( l

(_.) w/

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-5A/B (PB-516A)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines IliF h Coincident With Steam Line Pressure Low SET POINT *t > 600 psig (.300V)

ALLOWABLE VALUE *t > 580 psig (.293V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .2995V .2995V 09-02-83 .3005V .3005V 12-05-83 .3005V .3005V 03-07-84 .3003V .3003V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) UARTERLY EILLANCE DATA i v )

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-12A/B (PB-526A)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines liigh Coincident. 4 w

With Steam Li.ne Pressure Low SET POINT *t 1 600 psig (.300V)

ALLOWABLE VALUE *t 1 580 psig (.293V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .3002V .3002V 09-19-83 .3000V .3000V 12-20-83 .3001V .3001V 04-11-84 .2995V .2995V UOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

J

) UARTERLY EILLANCE DATA (%/ /

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-23A/B (PB-536A)

FUNCTIONAL UNIT

  • Steam Flos in Two Steam Lines High Coincident With Steam Line Pressure Low SET POINT *t 3 600 psig (.300V)

ALLOWABLE VALUE *t 1 580 psig (.293V)

SET POINT SET POINT DATE A3 FOUND t AS LEFT t 06-15-83 .2997V .2997V 09-19-83 .2996V .2996V 12-20-83 .3001V .3001V 04-11-84 .3002V .3002V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

, s'~^"

') UARTERLY EILLANCE DATA  !

, l , ,'

~_s SEQUOYAH NUCLEAR PLANT CHANNEL PS-I-30A/B (PB-546A)

FUNCTIONAL UNIT

  • Steam Flow in Two Steam Lines High Coincident With Steam Line Pressure Low SET POINT *t 1 600 psig (.300V)

ALLOWABLE VALUE *t 2 580 psig (.293V)

SET POINT SET POINT DATE l FOUND A t AS LEFT t 06-06-83 .3001V .3001V 09-02-83 .3004V .3004V 12-05-83 .3000V .3000V 03-07-84 .3005V .3005V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

) UARTERLY EILLANCE D M y j ss SECUOYAH NUCLEAR PLAN]

9 CHANNEL FS-3-35B/A (FB-510B)

FUNCTIONAL UNIT

  • Steam Feedwater Flow Mismatch SET POINT *t $ 401 (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .1259V .1259V 11-10-83 .1256V .1256V 02-10-84 .3258V .1258V C5-17-84 .1258V .1258V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

1

( ) . LANCE DATA ' !

SEQUOYAH NUCLEAR PLANT CHAMIEL FS-3-35D/E (FB-511B)

FUNCTIONAL UNIT

  • Steam Feedwater Flow Mismatch SET POINT *t $ 401 (.1262V)

ALLOWABLE VALUE *t 5 2.51 (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-14-83 .1270V .1270V 10-12-83 .1270V .1270V 01-12-84 .1271V .1271V 05-04-84 .1266V .1266V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

) UARTERLY ILLANCE DATA I )

\ g' '4 SEQUOYAH NUCLEAR PLAh"r CHANNEL FS-3-48B/A (FB-520B)

FUNCTIONAL UNIT

  • Steam Feedwater Flow Mismatch SET POINT *t $  % (.1262V)

ALLOWABLE VALUE *t i 42.5% (.1409V)

SET POINT -

SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .1265V .1265V 11-10-83 .1265V .1265V 02-10-84 .1264V .1264V 05-17-84 .1259V .1259V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 1 Units should be connistent, either voltage or engineering units

pw-

[ } UARTERLY ILLANCE DATA ( I

\ / '

SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-48D/E (FB-521B)

FUNCTIONAL UNIT

  • Steam Feedwater Flow Mismatch SET POINT *t $ 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .1254V .1254V 10-12-83 .1258V .1258V 01-12-84 .1252V .1252V 05-04-84 .1250V .1250V i

.I NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage. or engineering units

IL

,7-~ ,m

( ) UARTERLY EILLANCE DATA ( )

N J 'w)

SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-90B/A (FB-530B)

FUNCTIONAL UNIT

  • Steam Feedwater Flow Mismatch SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .1260V .1260V 11-14-83 .1265V .1265V 02-13-84 .1261V .1261V 05-17-84 .1262V .1262V NOTE:

  • As defined in technical specification tables 2.2-I and 3.3-4 t Units should be conristent, either voltage or engineering units

i i UARTERLY EILLANCE DATA ( )

' __, /

SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-90D/E (FB-531B)

FUNCTIONAL UNIT

  • Steam Feedwater Flow Mismatch SET POINT *t i 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .1265V .1265V 10-12-83 .1266V .1266V 01-12-84 .1266V .1266V 05-04-84 .1264V .1264V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

s UARTERLY j EILLANCE DATA, )

/

SEQUOYAH NUCLEAR PLANT s

ggg FS-3-103B/A (FB-540B) ,

FUNCTIONAL UNIT

  • Steam /Feedwater Flow Mismatch ' -

SET POINT *t i 40*. (.1262V) ^

ALLowABLc VALuz *t 5 42.5% (. Iso 9y) <

SET POINT SET POINT DATE AS FOUND t ' AS LEFT t 03-10-83 .1262V .1262V 11-14-83 .1270V . .1270V C2-13-F4 .12647 .1264V 05-17-84 .1268V ,

1268V l

l j NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

I l

-~

) UARTERLY EILLANCE DATA j SEQUOYAH NUCLEAR PLANT CHA.B'EL FS-3-103D/E (FB-541B)

FUNCTIONAL UNIT

  • Stean Feedwater Flow !!isaatch SET FOINT *t $ 40% (.1262V)

ALLC'4ABLE VALUE *t i 42.51 (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .1266V .1266V 10-12-83 .1269V .1269V 01-12-84 .1269V .1269V 05-04-84 .1266V .1266V NOTE:

  • As defined in technical specification tr.bles 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units l

l l

L

,.; W 'W

( ) UARTERLY' ILLANCE DATA ( wj )

u ..-

SEQUOYAH NUCLE?.R PLANT CHANNEL PS-1-2A/D (PB-514A)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High SET POINT *t 5100 psi ( 0333ii)

ALLOWABLE VALUE *t. 5 112 psi (.037V) ,

'.L '

/

.' )

  • ' SET POINT ,

' ' SET POINT i

.i i.

DATE ' 3

.) AS FOUND g--

t ' -  ;

AS LEFT-t 08-10-83 i> '.'0334V ' /

11-1(?-83

,, . [ ,

g. '.' 03 34V #

.0333V -

.0333V 02-10-34 . .0320V .0320V .

05-17-84 - -

.0323V .0323V 1

h  ?

l ~

- / 's * '

, ) ,

r NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

L UARTERLY EILLANCE DATA i j Q,,)) 'tJ SEQUOYAH NUCLEAR PLANT 5

CHANNEL PS-1-2D/A (PB-514B)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - Iligh

~

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .0335V .0335V 11-10-83 .0342V .0342V 02-10-84 .0330V .0330V 05-17-84 .0328V .0328V NOTE:

  • As defined in technical specification tables 2.2-1 End 3.3-4 t Units should be consistent, either voltage or engineering units

,em , , ~

(w./ UARTERLY EILLANCE DATA (w/ )-

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-2B/E (PB-515A)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t _5112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-14-83 .0335V .0335V 10-12-83 .0340V .0340V 01-12-84 .0335V .0335V 05-04-84 .0336V .0336V 4

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4

, t Units should be consistent, either voltage or engineering units

,m ,x ARTERLY  !

)

(Q,<) ,

L /'

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-2E/B (PB-515B)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High

, SET POINT *t 5 100 psi (.0333V) ,

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-14-83 .0340V .0340V 10-12-83 .0336V .0336V 01-12-84 .0341V .0341V 05-04-84 .0336V .0336V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

('~ ,

UARTFRLY (w )/) EILLANCE DATA l

/

)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-5D/E (PB-516C)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 06-06-83 .0329V .0329V 09-02-83 .0325V .0325V 12-05-83 .0327V .0327V

03-07-84 .0326V .0326V i

i NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 4

m

\

,~ ,, - - .

UARTERLY EILLANCE DATA ( I'

['v) \s_

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-5E/D (PB-516D)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High SET POINT *t $ 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V) s SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-c6-83 .0328V .0328V 09-02-83 .0333V .0333V 12-05-83 .0331V .0331V 03-07-84 .0332V .0332V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units e -, - ,, . - ,

-4 .

, -- -. ,y

,n ,

(n ) UARTERLY EILLANCE DATA (x. s - )

,/

SEOUOYAH NUCLEAR PLANT CHANNEL PS-1-9A/B (PB-525A)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - liigh .

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t i 112 psi (.0377)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .0334V .0334V 10-12-83 .0337V .0337V 01-12-84 .0336V .0336V 05-04-84 .0335V .0335V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

') y~

UARTERLY EILLANCE DATA {

g

) \ ,

)

l SEQUOYAH NUCLEAR PLANT 3

CHANNEL PS-1-9B/A (PB-525B) -

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - liigh SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 07-15-83 .0333V .0333V 10-12-83 .0329V .0329V 01-12-84 .0330V .0330V 05-04-84 .0326V .0326V 4

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4
t Units should be consistent, either voltage or engineering units l

/-

(--

(%,,') UARTERLY EILLANCE DATA f'%)I SEQUOYAH NUCLEnit PLANT CHANNEL PS-1-12D/E (PB-526C)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET PC1NT SET POINT 4 DATE AS FOUND t AS LEFT t 06-15-83 .0328V .0328v 09-19-83 .0324V .0324V 12-20-83 .0334V .0334V 04-11-84 .0329V .0329V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

~

,e g UARTERLY EILLANCE DATA f y

j x x_/

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-12E/D (PB-526D)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - liigh 5 100 psi (.0333V)

SET POINT *t 5 112 psi (.037V)

ALLOWABLE VALUE *t SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .0330V .0330V 09-19-83 .0331V .0331V 12-20-83 .0330V .0330V 04-11-84 .0330V .0330V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,- y-~

( ) UARTERLY EILLANCE DATA ( }

N_/ v SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-20A/B (PB-534A)

FUNCTIONAL UNIT

  • __ Differential Pressure Between Steam Lines - High SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t i 112 psi (.037V) 1

]

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .0330V .0330V 11-14-83 .0330V .0330V 02-13-84 .0331V .0331V 05-17-84 .0338V .0338V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,. . , ~ ,

UARTERLY w/

) EILLANCE DATA (

w/

l SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-42A/B (PB-934A)

FUNCTIONAL UNIT

  • Containment Pressure - High-High SET POINT *t > 2.81 psig (.1952V)

ALLOWABLE VALUE *t < 2.97 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t. AS LEFT t 06-06-83 .1962V .1962V 09-02-83 .1960V .1960V 12-05-83 .1960B .1960V 03-07-84 .1957V .1957V d

I NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,c~ ,,

,~

(L ) ARTERLY EILLANCE DATA. (%  ;

/' ,'

SEQUOYAH NUCLEAP. PLANT CHANNEL PS-1-20B/A (PB-534B)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High SET POINT "t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

' SET POINT SET POINT DATE AS FOUND i AS LEFT t 08-10-83 .0336V .0336v 11-14-83 .0340V .0340V 02-13-84 .0338V .0338V 05-17-84 .0336V .0336V 4

1 NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

ERLY EILLANCE DATA (As') )

i

\s' SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-43A (PB-935A)

FUNCTIONAL UNIT

  • Containment Pressure - High-High SET POINT *t 5 2.81 psig (.1952V)

ALLOWAELE VALUE *t 5 2.97 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1953V .1953V 09-19-83 .1954V .1954V 12-20-83 .1954V .1954V 04-11-84 .1953V .1953V MOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,,-~

7-( ) UARTERLY ILLANCE DATA I .

Q ,/ Q ,l SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-45A (PB-937A)

FUNCTIONAL UNIT

  • Containment Pressure - liigh-High SET POINT *t 5 281 psig (.1952V)

ALLOWABLE VALUE *t 5 297 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-10-83 .1953V .1953V 11-14-83 .1954V .1954V 02-10-84 .1954V .1954V 05-17-84 .1954V .1954V NOTE:

  • As defined in technical specification tables 2.2--I and 3.3-4 t Units should be consistent, either voltage or engineering units

! QUARTERLY SEQUOYAH_ NUCLEAR PLANT CHANNEL PDS-30-42B/A (PB-934B)

FUNCTIONAL UNIT

  • Containment Pressure liigh 5 1.54 psig (.1635V)

SET POINT *t ALLOWABLE VALUE *t i 1.7 psig (.1675V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .1632V .1632V 09-02-83 .1630V .1630V 12-05-83 .1634V .1634V 03-07-84 .1628V .1628V I

4 NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

)

(-) UARTERLY EILLANCE DATA

. l SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-43B'(PB-935B)

FUNCTIONAL UNIT

  • Containment Pressure liigh '

$ 1.54 psig (.1635V) s .w-SET POINT *t $ 1.7 psig (.1675V)

ALLOWABLE VALUE *t , . ,

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 .1643V .1643V 09-19-83 .1644V .1644V 12-20-83 .1643V .1643V 04-11-84 .1641V .1641V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

( i UARTERLY EILLANCE DATA  ! i N,] \~ .j SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-44A/B (PB-936A)

FUNCTIONAL UNIT

  • Containment Pressure - High-High SET POINT *t 5 281 psig (.1952V)

ALLOWABLE VALUE *t , i 297 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .1949V .1949V 10-13-83 .1949V ,1949y 01-12-84 .1946V . .1946V 05-04-84 .1947V .1947V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

- - - -, - , - - - , , - - - c ,, ..

/ \-

UARTERLY EILLANCE DATA

/

(

x,_./

l ( l N ,,'

SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-44B/A (PB-93AB)

FUNCTIONAL UNIT

  • _Containment Pressure High SET POINT *t 5 1.54 psig (.1635V)

ALLOWABLE VALUE *t 5 1.7 psig (.1675V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-15-83 .1636V .1630V 10-13-83 .1631V .1631V 01-12-84 .1648V .1648V 05-04-84 .1628V .1628V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

) QUARTERLY i

)

SEQUOYAH NUCLEAR PLANT CHANNEL N41 NC301 l FUNCTIONAL UNIT

  • Power Range Neutron Flux High Negative Trip Rate SET POINT *t $ 3%

ALLOWABLE VALUE *t 5 3.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-26-83 3% 3%

08-25-83 3% 3%

11-22-83 3% 3%

03-09-84 3% 3%

i I

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

SEQUOYAH NUCLEAR PLANT CHANNEL N41 NC303-FUNCTIONAL UNIT

  • Power Range Neutron Flux High Positive Trip Rage SET POINT *t i 5%

ALLOWABLE VALUE *t 5 5.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-26-83 5% 5%

08-25-83 5% 5%

11-22-83 5% 5%

03-04-84 5% 5%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,c~. --.

I l UARTERLY EILLANCE DATA f .

LJ %j SEQUOYAII NUCLEAR PLANT CHANNEL N41 NC305 FUNCTIONAL UNIT

  • Power Range Neutron Flux Low Setpoint SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t 5 26% ($ 2.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-26-83 2.081V 2.081V 08-25-83 2.080V 2.080V 11-22-83 2.080V 2.080V 03-09-84 2.080V 2.080V NOTE:

  • As defined it. 3chnical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

UARTERLY EILLANCE DATA )

i G'} (t ,'

SEQUOYAH NUCLEAR PLANT CHANNEL N41 NC306-FUNCTIONAL UNIT

  • Power Range Neutron Flux High Setpoint SET POINT *t 5 109% (< 9.083V)

ALLOWABLE VALUE *t i 110% ($ 9.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-26-83 9.078V 9.078V 08-25-83 9.078V 9.078V 11-22-83 9.074V 9.074V 03-09-84 9.080V 9.080V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

[ UARTERLY EILLANCE DATA f I

() Q,l SEQUOYAII NUCLEAR PLANT CHANNEL N42 NC301 FUNCTIONAL UNIT

  • Power Range Neutron Flux liigh Negative Trip Rate SET POINT *t 53%

ALLOWABLE VALUE *t 5 3.3%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 3% 3%

08-22-83 3% 3%

11-23-83 3% 3%

03-16-84 3% 3%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 1 Units should be consistent, either voltage or engineering units

n

-N t( 7

! UARTERLY EILLANCE DATA t  !

N_.)  %.j SEQUOYAH NUCLEAR PLANT CHANNEL N42 NC303 FUNCTIONAL UNIT

  • Power Range Neutron Flux High Positive Trip Rate SET POINT *t 55%

ALLOWABLE VALUE *t i 5.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 5% 5%

08-22-83 5% 5%

11-23-83 5% 5%

03-16-84 5% 5%

l NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

(v) UARTERLY ILLANCE DATA i v

l SEQUOYAH NUCLEAR PLANT CHANNEL N42 NC305 FUNCTIONAL UNIT

  • Power Range Neutron Flux Low Setpoint SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t 5 26% ($ 2.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-23-83 2.079V 2.079V 08-22-83 2.078V 2.078V 11-23-83 2.078V 2.078V 03-16-84 2.077V. 2.077V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

t

g ). . .- .-

/ i e t, j , UARTERLY EILLANCE DATA (',  ;

~~ / , , x. s

,  ;< , SEQUOYAH NUCLEAR PLANT i

- . g , . . <

E N42 NC306 ,' *

/

CHANNEL , \

FUNCTIONAL UNIT

  • Power Range Neutron , Flux High Setpoint '

g (,

< ' s-SET POINT *t.

5 109% (19.083V) ,

r, s ALLOWAB E VALUE *t $ 110% ($ 9.167V) ,

t s s

t 4 SET POINT SET, POINT DATE ' '

AS FOUND t .,V AS LEFT t 05-23-83 9.080V q  ! 9.080V 08-22-83 '

9.080V 9.080V

  • 11-231 83 9.081V 9.681V 03-16-84  ;

9.080V . 9.080V 4

i I

l l

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i t Units should be consistent, either voltage or engineering units

(; ) UARTERLY ILLANCE DATA [ l L' 'n.'~

SEQUOYAH NUCLEAR PLANT CHANNEL N43 NC301 FUNCTIONAL UNIT

  • Power Range Neutron Flux liigh Negative Trip Rate SET POINT *t 53%

ALLOWABLE VALUE *t 53%

SET POINT SET POINT DATE AS FOUND 1 AS LEFT t 05-27-83 3% 3%

08-26-83 3% 3%

11-21-83 3% 3%

03-05-84 3% 3%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should consistent, either voltage or engineering units a - - .

,e~,

3

! . UARTERLY EILLANCE DATA i )

\. ~ , 'qJ SEQUOYAH NUCLEAR PLANT CHANNEL N43 NC303 FUNCTIONAL UNIT

  • Power Range Neutron Flux High Positive Trip Rate SET POINT *t 55%

ALLOWABLE VALUE *t 5 5.5%

.- 's

[ , .

jr -

SET POINT , -

~5 SET POINT DATE AS ' FOIPJD t , ASILEFT t ,

^

05-27-83 . ,

'~

5%(l! -

5% .

08-26-83 5'l '- ,

', 5%

11-22-83 5%^ 5% 1 03-04-84 5%

5%

r I

r I ,

k NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

y ~. . ,,-.

) UARTERLY ILLANCE DATA '4

's. .) ( _ ,,)

SEQUOYAH NUCLEAR PLANT-CHANNEL N43 NC305 FUNCTIONAL UNIT

  • Power Range Neutron Flux Low Setpoint ,

SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t 5 26% ($ 2.167V)

SET POINT SET POINT j DATE AS FOUND t AS LEFT t 05-27-83 2.081V 2.081V 08-26-83 2.083V 2.083V 11-22-83 2.079V 2.079V 03-05-84 2.083V 2.083V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

~

,, ,, -3

( UARTERLY EILLANCE' DATA i w.} ~j

}

SEQUOYAH NiTCLEAR PLANT CHANNEL N43 NC306 FUNCTIONAL UNIT

  • Power Range Neutron Flux High Setpoint SET POINT *t 5 109% ($ 9.083V)

ALLOWABLE VALUE *t 5 110% (59.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-27-83 9.07'V 9.077V 08-26-83 9.082V 9.083V 11-22-83 9.081V 9.081V 03-05-84 9.086V 9.086V NOTE:

4

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

fK j ' x(

( ) UARTERLY EILLANCE DATA ( 1

'sj N. ,) -

SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC301 FUNCTIONAL UNIT

  • Power Range Neutron Flux High Negative Trip Rate 1

SET POINT *t 5 3%

ALLOWABLE VALUE *t 5 3.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 3% 3%

08-23-83 3% 3%

11-28-83 <3.5% >3 0%

<3.5% >3 0%

03-15-84 3% ' 3%

t NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

e --w -- -, - er - --v - e

0

.,,~3

,r.)

(J)

UARTERLY EILLANCE DATA (

LJ SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC303 FUNCTIONAL UNIT

  • Power Range Neutron Flux liigh Positive Trip Rate SET POINT *t 55%

ALLOWABLE VALUE *t 5 5.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 5% 5%

08-23-83 5% 5%

11-28-83 5% 5%

03-15-84 5% 5%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

gg ..,,

(v ) QU_ARTERLY ILLANCE DATA (

x_ ,/

)

SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC305-FUNCTIONAL UNIT

  • Power Range Neutron Flux Low Setpoint SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t $ 26% ($ 2.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 2.078V 2.078V i

08-23-83 2.081V 2.081V 11-28-83 2.081V 2.081V 03-15-84 2.078V 2.078V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i
x. ,

/ \ /  %'

UARTERLY 'ILLANCE DATA l R/ )

t (

q,J SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC306-FUNCTIONAL UNIT

  • Power Range Neutron Flux High Setpoint SET POINT *t i 109% ($ 9.083V)

ALLOWABLE VALUE *t 5 110% (59.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 9.074V 9.074V 08-23-83 9.081V 9.081V 11-28-83 9.078V 9.078V 03-15-84 9.073V 9.073V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

, ,y . ,.

/ \ /

, j UARTERLY EILLANCE DATA s j.

x_- -

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340A (PB-455A)

FUNCTIONAL UNIT

l b N" eb SET POINT *t i 2385 psig (.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 .4424V .4424V 09-02-83 .4425V .4425V 11-28-83 .4426V .

.4426V 02-23-84 .4429V .4429V NOTE:

  • As defined in technical sp'ecification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units t

./. .

,m

( ) UARTERLY EILLANCE DATA (x ./ )

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-334A (PB-456A) t em n FUNCTIONAL UNIT

' hl [@

SET POINT *t 5 2385 psig'(.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V)

SET POINT SET POINT DATE '

AS FOUND t AS LEFT t 06-21-83 .4432V .4432V 08-26-83 .4432V .4432V 09-21-83 .4421V .4421V 12-28-83 .4420V .4420V 03-20-84 .4423V .4423V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

/ ) /

( ) UARTERLY EILLANCE DATA q )

J _

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-323A'(PB-457A)

FUNCTIONAL UNIT

  • Pressurizer Pressure - liigh (Reactor Trip) L SET POINT *t 5 2385 psig (.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V) e SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .4425V .4425V 11-07-83 .4428V .4428V 02-03-84 .4427V .4427V 05-03-84 .4430V .4430V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3 -4 t Units should be consistent, either voltage or engineering units

i

,-t. ,

,~

)' UARTERLY EILLANCE DATA  ! )

,/ 'J SEQUOYAH-NUCLEAR PLANT CHANNEL PS-68-322A (PB-458A)

FUNCTIONAL UNIT

  • Pressurizer Pressure - liigh (Reactor Trip) L SET POINT *t 5 2385 psig (.4425V)

ALLOWABLE VALUE *t 5 2395 psig (.447V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-13-83 .4429V .4429V 11-02-83 .4430V .4430V 01-24-84 .4430V .4430V 04-26-84 .4430V .4430V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,A. .

( ) UARTERLY EILLANCE DATA ~ ,

y _,J -'

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340E (PB-455C) tl nm n FUNCTIONAL UNIT

l} *j i y M

  • f) h [,s SET POINT *t 2 1970 psig (.2350V)

ALLOWABLE VALUE *t 2 1960 psig (.230V) 4 SET POINT SET POINT DATE AS FOUND i AS LEFT t 05-24-83 .2352V .2352V 09-02-83 .2349V .2349V 11-28-83 .2351V .2351V 02-23-84 .2353V .2353V NOTE:

  • As defined in technical cpecification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

y , -

l ) UARTERLY CILLANCE DATA [ )

\. /

SEQUOYAH NUCLEAR' PLANT CHANNEL PS-68-334B^(PB-456C)

Pressurizer Pressure - Low (Reactor Trip) g mi n FUNCTIONAL UNIT

  • hh Y
4 .4 c, SET POINT *t 2 1970 psig (.2350V)

ALLOWABLE VALUE *t 2 1960 psig (.230V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 06-21-83 .2346V .2346V 08-26-83 .2352V .2352V 09-21-83 .2353V .2353V 12-28-83 .2347V .2347V 03-20-84 .2345V .2345V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

- s .

) UARTERLY EILLANCE DATA ( ,

SEQUOYAH NUCLEAR PLANT l

1 l

CHANNEL PS-68-323B (PB-457C)

E "

FUNCTIONAL UNIT

y t r ill Ns {~s SET POINT *t 2 1970 psig (.2350V)

ALLOWABLE VALUE *t 2 1960 psig (.230V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .2353V .2353V 11-07-83 .2353V .2353V 02-03-84 .2353V .2353V 05-03-84 .2352V .2352V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage er engineering units

1 A .

UARTERLY EILLANCE DATA  !,

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-322D . (PB.-458C)

O L.

FUNCTIONAL UNIT

, Nbb de'Et(mf,?*N.

SET POINT *t 2 1970 psig (.2350V)

ALLOWABLE VALUE *t 2 1960 psig (.230V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-13-83 .2357V .2357V 11-02-83 .2357V .2357V 01-24-84 .2349V .2349V 04-26-84 .2353V .2353V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

ys s

(

..,/

) QUARTERLY ILLANCE DATA  !

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340B/D (PS-455B/D)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Manual Block of ll  !

b'J p.

[

g [jn'a j y

.s

//

Ssfety Injection P-11 E N S' SET POINT *t 5 1970 psig (.2350V)

ALLOWABLE VALUE *t 5 1980 psig (.240V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 .2346V .2346V 09-02-83 .2354V .2354V 11-28-83 .2353V .2353V 02-23-84 .2356V .2356V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

-( LLANCE DATA j

) i SEQUOVAH NUCLEAR PLANT.

CHANNEL PS-68-334E/D,(PS-456B/D)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Manual Block of ,k t v. h,.

Smfety Injection P-11 'a d !N,. 6 SET POINT *t 5 1970 psig (.2350V)

ALLOWABLE VALUE *t $ 1980 psig (.240V)

SET POINI SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .2355V .2355V 08-26-83 .2354V .2354V 09-21-83 .2354V .2354V 12-28-83 .2352V .2352V 03-20-84 .2349V .2349V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units i

n

,J ,. e l UARTERLY EILLANCE DATA

}

x_.) -J SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-323E/D (PS-457B/D) na o FUNCTIONAL UNIT

  • Pressurizer Pressure - Manual Block af 4 Q L !j N .P .E8 p

. t.

J 1 r

Safety Injection P-11 c.:m SET POINT *t 5 1970 psig (.2350V)

ALLOWABLE VALUE *t 5 1980 psig (.240V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .2353V .2353V 11-07-83 .2354V .2354V 02-03-84 .2358V .2358V 05-03-84 .2353V .2353V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

r w,/

'} UARTERLY EILLANCE DATA (\ /

)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-340D/B (PE-455D/B) q m FUNCTIONAL UNIT

  • Pressurizer Pressure - Low (Safety Injection) .I *d ll

' Il Nlhgn1 Cn SET POINT *t 2 1870 psig (.1850V)

ALLOWABLE VALUE *t 1 1860 psig (.180V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 05-24-83 .1851V ' .1851V 09-02-83 .1852V .1852V 11-28-83 .1850V .1850V 02-23-84 .1857V .1857V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4

? Units should be consistent, either voltage or engineering units

f 7

  • . s UARTERLY EILLANCE DATA  !

SEQUOYAH NUCLEAR PLANT CHANNEL _pS-68-334D/E (PB-456D/B) l cm o FUNCTIONAL Uh!T

  • Pressurizer Pressure - Low (Safety Injection) .h y L Il i k'I ih4 (E a

SET POINT *t > 1870 psig (.1850V)

ALLOWABLE VALUE *t > 1860 psig (.180V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .1849V .1849V 08-26-83 .1851V .1851V 09-21-83 .1857V .1857V 12-28-83 .1848V .1848V 03-20-84 .1849V .1849V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

l UARTERLY EILLANCE DATA l SEQUOYAH NUCLEAR PLANT CHANNEL PS-68-323D/E (PB-457D/B)

FUNCTIONAL UNIT

  • Pressurizer Pressure - Low (Safety Injection) .

SET POINT *t 1 1870 psig (.1850V)

ALLOWABLE VALUE *t 3 1800 psig (.180V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-c8-83 .1850V .1850V 11-07-83 .1851V .1851V 02-03-84 .1845V .1845V C5-03-84 .1846V .1846V l

l NOTE:

l

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

l UARTERLY 'EILLANCE DATA SEQUOYAH NUCLEAR PLANT CHANNEL LS-68-339A/B (LB-459A/B)

FUNCTIONAL UNIT

SET POINT *t 5 92% (5 4680V) _

ALLOWABLE VALUE *t I 93I (1 4720V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 .4683v .4683v 09-02-83 .4684V .4684V 11-20-83 .4656V .4656V 02-23-84 4685V .4685V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

UARTERLY EILLANCE DATA ,

SEQUOYAH NUCLEAR PLANT CHANNEL LS-68-335A/B (LB-460A/B) 0 FUNCTIONAL UNIT

  • Pressurizer Water Level - High Reactor Trip j "i N II.p'h: =lj em

.J .

[

SET POINT *t 5 92% (5 4680V)

ALLOWABLE VALUE *t 5 93% (5 4720V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .4686V .4686V 08-26-83 .4686V .4686V 10-01-83 .4683V 4683V 12-28-83 .4680V .4680V 03-20-84 .4686V .4686V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

m

-s ,

f UARTERLY EILLANCE DATA >

SEQUOYAH NUCLEAR PLANT CHANNEL LS-68-320A/B (LB-461A/B)

FUNCTIONAL UNIT

h/-

U N, ei SET POINT *t 5 92% (5 4680V)

ALLOWABLE VALUE *t 5 93% (5 4720V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .4683v .4683V 11-07-83 .4683V .4683V 02-03-84 .4684V .4684V 05-03-84 .4677V .4677V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,A ,

[ ] UARTERLY EILLANCE DATA (,, l

, l 'u SEQUOYAH NUCLEAR PLANT 9

CHANNEL FS-68-6A (FB-414A)

FUNCTIONAL UNIT

  • Loss of Flow

) .

SET POINT *t > 90% (>.3678V)

ALLOWABiE VALUE *t > 89% (>.3618V)

SET POINT SET POINT DATE AS FOUND 1 AS LEFT t 05-24-83 .3676V .3676V 09-02-83 .3674V .3674V 11-29-83 .3680V .3680V 02-23-84 .3678V .3678V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units
r. q 7--.x .-

[ ) UARTERLY EILLANCE DATA ( i

.__,J L' SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-6B (FB-415A)

Loss of Flow FUNCTIONAL UNIT

  • SET POINT *t 2 90% (1 3678V)

ALLOWABLE VALUE *t . 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .3675V .3675V 08-25-83 .3680V .3680V 10-01-83 .3679V .3679V 12-28-83 .3670V .3770V 03-20-84 .3674V .3674V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

1

^

s a UARTERLY EILLANCE DATA -

,' J SEQUOYAH NUCLEAR PLANT '

A

t t , ,

CHANNEL FS-68-6D (FB-416A) -

t FUNCTIONAL UNIT

  • Loss of Flow E

, 0. "[j Oj

'. t l

r.' g fy ,

L3 .5 h r$

s' SET POINT *t > 90% (>.3678V) ,.

, s.

ALLOWABLE VALUE *t > 89% (>.3618V) ,

I 1

(

SET Fr.' INT SET FOINT DATE AS FOt;bD t AS LEFT t

  • 1 C3-C8-83 .3672V .3672V >

g' 11-07-83 .3676V .3676V C2-03-84 .3676V .3676V 05-03-84 .3677V .3677V

, 4 NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

UARTERLY EILLANCE DATA SEQUOYAH NUCLEAR PLANT CHAmiEL FS-68-29A (FB-424A)

FUNCTIONAL UNIT

  • Loss of Flev 3 "!}

a O..e n1 p U$ En SET POINT *t  ? 901 (?.3678V)

ALLOWABLE VALUE *t  ? 891 (?.3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t C5-24-83 .3670V .3670V 09-03-83 .3679V .3679V 11-29-83 .3681V .3681V C2-23-84 .3674V .3674V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 .

t Units should be consistent, either voltage or engineering units l

l i

m , ,s

( UARTERLY q_/ '

,i EILLANCE DATA

(<s)'

.' SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-29B (FB-425A)

' FUNCTIONAL UNIT

  • Loss of Flow y p,

.7

/;

G il -

!+ --

SET POINT *t 2 90% (2 3678V) i 2 89% (>.3618V) j

. ALLOWABLE VALUE *t 4 1 ,

s h J .. ,_

~

- Sh:T y IOINT SET POINT ,

- DATE
  • AS~.FOUND t AS LEFT f ' '

e , , <

06-21-83 '

.3677V  ; .3677V ', ,

08-25-83

.3684V ,-' ; .3684V .

01 .3687V .3672V 12-28-83 '

.3663V .3670V.

03-20-84 '

.3670V t

. .,6 70V ,

+

1

/ .

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should ha consistent, either voltage or engineering units

/-~ .

i

! l UARTERLY EILLANCE DATA ( J

\ ,,/  %../

SEQUOYAH NUCLEAR PLANT CHANNEL FS-69-39D (FB-426A)

FUNCTIONAL UNIT

  • L ss of Flow n .]. .

N N,. b,.

SET POINT *t 2 90% (2 3678V)

ALLOWABLE t'ALUE *t 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .3679V .3679V 11-01-83 .3670V .3670V 02-03-84 .3668V .3668V 05-03-84 .3669V .3669V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,'~ .

( ) QUARTERLY EILLANCE DATA ( l

__- us SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-48A (FB-4,34A)

FUNCTIONAL UNIT

  • Loss of Flow SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET 1-OINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 .3679V .3679V 09-02-83 .3676V .3676V 11-20-83 .3671V .3671V 02-23-84 .3657V .3674V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units
a. . _ _--

i 7s. ,-

( ) UARTERLY EILLANCE DATA f )

\'  %,j SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-48B (FB-435A)

FUNCTIONAL UNIT

  • Loss of Flow k L hl h

ij N,.

f.

f, I

SET POINT *t  ? 90% (1 3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .3672V .3672V 08-25-83 .3677V .3677V 10-01-83 .3674V .3674V 12-28-83 .3675V .3675V 03-20-84 .3673V .3673V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

/3 , ,.

(/)

w UARTERLY EILLANCE DATA SEQUOYAH NUCLEAR PLANT

( ;)

m CHANNEL FS-68-48D (FB-436A) t: :m o FUNCTIONAL UNIT

  • Loss of Flow [ , [j L ')

l 3 p

!l fl [k

--.\

SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t , > 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .3680V .3680V 11-07-83 .3673V .3673V 02-03-84 .3669V .3669V 05-03-84 .3673V .3673V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 1 Units should be consistent, either voltage or engineering units

, s. . . ,--

( ) UARTERLY EILLANCE DATA i j

'q,/ R ,

SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-71A (FB-444A) 1 = Lq.

Loss of Flow {j FUNCTIONAL UNIT * - q i

L e.

l ,

El

  1. j,

.sJ' .1 em SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t 2 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT '

05-24-83 .3676V .3676V 09-02-83 .3677V .3677V 11-29-83 .3675V .3675V 02-22-84 .3675V .3675V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units L

p-~ . ~.

j UARTERLY EILLANCE DATA l N_/ 'v SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-71B (FB-4,45A)

FUNCTIONAL UNIT

  • Loss of Flow

~

SET POINT *t t 90% (1 3678V)

ALLOWABLE VALUE *t 1 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .3683V .3683V 08-25-83 .3679V .3679V 10-01-83 .3678V .3678V 12-28-83 .3675V .3675V 03-20-84 .3677V .3677V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

' ./

.SEQUOYAH NUCLEAR PLANT CHANNEL FS-68-71D (FB-446A) na Lq FUNCTIONAL UNIT

  • Loss of Flow i [I4 y JUN /.'

eb SET POINT *t 2 90% (2 3678V)

ALLOWABLE VALUE *t > 89% (2 3618V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-08-83 .3680V .3680V 11-07-83 .3680V .3680V 02-03-84 .3670V .3670V 05-03-84 .3670V .3670V

~

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

/~ , , . , - . ,

( ') UARTERLY EILLANCE DATA t

)

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-42 A/B ,(LB-517A/B)

FUNCTIONAL UNIT

SET POINT *t i 75% (.40V)

ALLOWABLE VALUE *t 576% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-12-83 .3997V .3997V 11-02-83 .4000y .4000V 01-24-84 .3996V .3996V 04-26-84 .3996V .3996V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

1 7s,

( ) UARTERLY EILLANCE DATA ( l LJ

  • n; SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-39A/B (LB-518A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .4010V .4010V 10-04-83 .4000V .4000V 01-06-84 .3999V .' 399V 04-09-84 .4000V .4000V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

,r' SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-38A/B'(LB-519A/B) 1: nm FUNCTIONAL UNIT

r p

> 75% (.40V) U N,. [m SET POINT *t < 76% (.404V)

ALLOWABLE VALUE *t SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .4000V .4000V 08-25-83 .4000V .4000V 10-03-83 .4001V .4001V 12-28-83 .3991V .3991V 03-20-84 .3995V .3995V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) UARTERLY EILLANCE DATA [ '

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-55A/B (LB-527A/B)

FUNCTIONAL UNIT

L b b> &

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 08-12-83 .4001V .4001V 11-02-83 .3998V .3998V 01-24-84 .3994V .3994V 04-26-84 .4000V .4000V 1

I NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

(y ,;) UARTERLY EILLANCE DATA ( 4

~...

SEQUOYAH NUCLEAR PLANT CIIANNEL LS-3-52A/B (LB-528A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V) .

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .4006V .4006V 10-04-33 .3999V .3999V 01-06-84 .4003V .4003V 04-04-84 .3999V .3999V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,a .

( ) UARTERLY ILLANCE DATA [ '

xs N _.

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-51A/B (LB-529A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 .4003V .4003V 09-02-83 .3994V .4004V 11-29-83 .4005V .4005V 02-22-84 .4006V .4006V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) UARTERLY 'EILLANCE DATA ( l v_/ w_ -

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-97A/B (LB-537A/B)

FUNCTIONAL UNIT

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-12-83 .4000V .4000V 11-02-83 .4002V .4002V 01-24-84 .3996V .3996V 04-26-84 .3997V .3997V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

y .

UARTERLY EILLANCE DATA I

('v) '

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-94A/B (LB-538A/B)

FUNCTIONAL UNIT

L SET POINT *t $ 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .3997V .3997V 10-04-83 .4007V .4007V 01-06-84 .4003V .4003V 04-09-84 .4002V .4002V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

f-

\ s i,

%._.J

) UARTERLY EILLANCE DATA ( )

~_/

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-93A/B'(LB-539A/B)

FUNCTIONAL UNIT

N b 0>- p; t%

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-83 .4002V .4002V 09-02-83 .3994V .3994V 11-29-83 .4008V .4008V 02-23-84 .4007V .4007V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 l t Units should be consistent, either voltage or engineering units

f3 ,,

(% ./') UARTERLY EILLANCE DATA f  ;

N ,

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-110A/B.(LB-547A/B)

FUNCTIONAL UNIT

  • Steam Generator Water Level (Iligh-Iligh) 5 9 h W[j kJ 3 F; y h hh (m SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t i 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-12-83 .3997V .3997V 11-02-83 .3996V .3996V 01-24-84 .3996V .3996V 04-26-84 .3996V .3996V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

"x. , ~

i

) UARTERLY EILLANCE DATA g ,

e' SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-107A/B.(LB-548A/B)

FUNCTIONAL UNIT

r, .e ' 8 e u .@s L, SET POINT *t 5 75% (.40V) __

ALLOWABLE VALUE *t 5 76% (.404V)

, SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .4013V .4013V 10-04-83 .3997V .3997V 01-06-84 .3996V .3996V 04-09-84 .3993V .3993V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,/ \ .

l UARTERLY EILLANCE DATA

~,

) -

SEQUOYAH NUCLEAR PLANT CHANNEL' LS-3-106A/B .(LB- 549A/B) ,

FUNCTIONAL UNIT

  • Steara Generator Water Level (Ifigh-High)

SET POINT *t 5 75% (.40V)

ALLOWABLE VALUE *t 5 76% (.404V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .4004V .4004V 08-25-83 .4001V .4001V 10-03-83 .4004V .4004V 12-28-83 .4002V .4002V 03-20-84 .3999V .3999V NOTE:

  • As defined i- technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( u_J ) UARTERLY EILLANCE DATA _(  ;

N .J SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-42B/A (LB-517B/A) qnn FUNCTIONAL UNIT

$g '$j $

.4 a en SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V) r SET FOINT 52T POINT DATE AS FOUND t AS LEFT 7 08-12-83 .1719V .1719V 11-02-83 .1719V .1719V 01-24-84 .1720V .1720V 04-26-84 .1719V .3719y NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

1 7- .

(v ) UARTERLY ILLANCE DATA ( -_ l SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-39B/A-(LB-518B/A)

FUNCTIONAL UNIT

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t > 17% (1 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .1715V .1715V 10-04-83 .1716V .1716V 01-06-84 .1717V .1717V 04-09-84 .1718V .1718V NOTE:

  • As defined in technical spec ification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) UARTERLY EILLANCE DATA ( )

_J L' SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-38B/A-(LB-519B/A) 9 9W O FUNCTIONAL UNIT

( I?

f) h r$

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (>.1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .1714V .1714V 08-25-83 .1726V .1726V 10-03-83 .1717V .1717V 12-28-83 .1706V .1706V 03-20-84 .1711V .1711V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

s , .,

?

{

g

\

) UARTERLY EILLANCE DATA  !

\__/ \ ,_- - l SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-55B/A (LB-527B/A) tl 3cm o FUNCTIONAL UNIT

,1 c lj L [i ll t

SET POINT *t 1 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t__

08-12-83 .1719V .1719V 11-02-83 .1720V .1720V 01-24-84 .1720V .1720V 04-26-84 .1720V .1720V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or' engineering units

LLANCE DATA ( l SEQUOYA!I NUCLEAR PLANT CHANNEL LS-3-52B/A (LB-528B/A) t em Lq FUNCTIONAL UNIT

lJ h $3 SET POINT *t 1 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .1714V .1714V 10-04-83 .1713V .1713V 01-06-84 .1714V .1714V 04-09-84 ,1711y ,3733y NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 s consistent, either voltage or engineering units t Units should

1]

, ^x . /,_.s

! t-

-( l UARTERLY EILLANCE DATA l' 4 Nv ,, ,

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-51B/A-(LB-529B/A) rg na n FUNCTIONAL UNIT

SET POINT *t 1 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (1 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 4

05-24-83 .1720V .1720V 09-02-83 .1716V .1717V 11-29-83 .1719V .1719V 02-22-84 .1719y ,1719y NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units l

g ,

-m

/ '

( -lj UARTERLY ILLANCE DATA 'is s_ s_-

}

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-97B/A'(LB-537B/A) h FUNCTIONAL UNIT

  • i u '1;i f

m SET POINT *t > 18% (.1720V)

\

4 ALLOWABLE VALUE *t > 17% (>.1680V) 4 SET POINT SET POINT DATE, AS FOUND t AS LEFT t ,

08-12-83 .1722V .1722V 11-02-83 .1720V .1720V 01-24-84 .1722V .1722V 04-26-84 .1724V .1724V h

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

t -,

i s ) UARTERLY EILLANCE DATA i SEQUOYAH NUCLEAR PLANT CIIANNEL LS-3-94B/A (LB-538B/A) tin m FUNCTIONAL UNIT

SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 1 17% (>.1680V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 07-07-83 .1712V .1712V

  • 10-04-83 .1709V ,1719y 01-06-84 .1717y ,1717y 04-09-84 .1716V .1716V NOTE:
  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,,.2% ~

',q

_; j UARTERLY ILLANCE DATA j n _,j (

w/

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-93B/A (LB-539B/A)

FUNCTIONAL UNIT

  • Steam Generator Water Level (Low-Low) bb$ (N S5T POINT,.*t > 18% (.1720V) ..

ALLOWABLE VALUE *t > 17% (>.1680V) 4

., SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-24-C3 e j .1719V .1719V 09-02-83, i

.1721V .1721V 11-29-83 ' .1723V .1723V 02-23-84 -

,'1722V

. .1722V i a ' ;

/ - . .

/ .

h NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4

? Units should be consistent, either voltage or engineering units

,a h. .

/.

I\_j ) UARTERLY EILLANCE' DATA I u/

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-110B/A (LB-547B/A) nm .

FUNCTIONAL UNIT

  • ll jy P* /,?

^

U El r$3 SET POINT *t 2 18% (.1720V)

ALLOWABLE VALUE *t 2 17% (3 1680V) s SET POINT SET POINT DATE AS FOUND i AS LEFT t 08-12-83 .1714V .1714V 11-02-83 .1713V .1713V 01-24-84 .1714V .1714V 04-26-84 .1714V .1714V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i

t Units should be consistent, either voltage cr engineering units

,+- .

( UARTERLY EILLANCE DATA.

~-

[

'n _. ' \ ,j SEQUOYAH NUCLEAR PLANT, CHANNEL LS-3-107B/A : (LB.-548B/A) t rf tm m FUNCTIONAL UNIT

k y[j M (J h [3 SET POINT *t 1 18% (.1720V)

ALLOWABLE VALUE *t 1 17% (1 1680V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 07-07-83 .1720V .1720V 10-04-83 .1719V .1719V 01-06-84 .1715V .1715V 04-09-84 .1718V .1718V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

7% .

I

( ) UARTERL EILLANCE DATA 4 a '

~_ )

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-106B/A.(LB-549B/A)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t 2 17% (2 1680V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-21-83 .1714V .1714V 08-25-83 .1724V .1724V 10-03-83 .1713V .1713V 12-28-83 .1712V .1712V 03-20-84 .1712V .1712V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

/~~ , ,;

! / UARTERLY- EILLANCE DATA i j 8_/ L ,i SEQUOYAH NUCLEAR PLANT C,HANNEL LS-3-42V (LB-517C)

. nn. m FUNCTIONAL UNIT

N,. [s SET POINT *t 1 25% (.2V)

ALLOWABLE VALUE *t 1 24% (.196V)

SET POINT SET POINT DATE' AS FOUND i AS LEFT t 08-12-83 .1996V .1996V 11-02-83 .1998V .1998V 01-24-84 .1999V .1999V 04-26-84 .1998V .1998V 1

NOTE:

  • As defined in echnical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

, / ' s, &

f \

j s

I UARTERLY EILLANCE DATA  ;

\ s ,

J SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-39D (LB-518C)

rn a FUNCTIONAL UNIT

SET POINT *t > 25% (.2V)

ALLOWABLE VALUE *t > 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .1993V .1993V 10-03-83 .1994V .1994V 01-06-84 .1995V .1995V 04-09-84 .1994V .1994V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

~

)o

(

T Nt .

I _

OT VVVV PF 5543 E 0000 TL 0000 2222 E

SS A

s t

i 4n A - u T

A 3. g D T 3n N i E A dr C L ne N P ae A n L R 1i L A g I E n E L 2. e C 2 U r N so .

e H le Y A bg L Y aa R O tt E U w Tt l T Q o N no R L A

E S

ID ON i ov l VVVV U e PU 5543 tr v O 0000 ae e TF 0000 ch L E 2222 it r SS fi e A ie t

a ce, W pt r ) sn o V e t 6 lt a 9 as r 1 ci e .

is .

n (

e nn

) G  % ho C

m )

4 2

cc

  • 2 7

a V e 5 e 2 1 te

- t b B. S ( n L id

(  % t l

  • 5
  • du F 2 5 eo 5 T 1 E t t h

- I U is 3

- N L f S U t A es L

  • V dt

)

L i A T E sn

- a L N

O N

I L

B AU 3344 E I O A 8888 *t N T P W - - - -  :

N C O E 2246 E A N T L T 1 022

- - - - T H U E L A 81 1 4 O C F S A D 01 00 N

> i,

, - ~ ,

I j UARTERLY EILLANCE DATA r

)

'w] <

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-52D (LB-528C)

FUNCTIONAL UNIT

ALLOWABLE VALUE *t 1 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .2005V .2005V 10-04-83 .2005V .2005V 01-06-84 .2007V .2007V 04-09-84 .2002V .2002V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

1

, \. , . .

) QUARTERLY EILLANCE DATA I \

j I

/

SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-97F (LB-537C)

FUNCTIONAL UNIT

~

SET POINT *t > 25% (.2V)

ALLOWABLE VALUE *t > 24% (.196V)

SET POINT SET. POINT DATE AS FOUND t AS LEFT t 08-12-83 .2002V .2002V 11-02-83 .2005V .2005V 01-24-84 .2008V .2008V 04-26-84 .2005V .2005V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

-m.

_r' SEQUOYAH NUCLEAR PIANT CHANNEL LS-3-94D (LB-538C) r: '

em Lq FUNCTIONAL UNIT

Q h

e. A il N dm SET POINT *t  ? 25% (.2V)

ALLOWABLE VALUE *t 2 24% (.196V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 07-07-83 .1998V .1998V 10-04-83 .2002V .2002V 01-06-84 .2003V .2003V I

04-04-84 .2001V .2001V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

r

'N . p.-

( UARTERLY EILLANCE DATA i SEQUOYAH NUCLEAR PLANT CHANNEL LS-3-110 (LB-547C) .

FUNCTIONAL UNIT

ALLOWABLE VALUE *t > 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-13-83 .1998V ,1998v 11-02-83 .1995V .1995V 01-24-84 .1937V .2001V 04-26-84 .2001V .2001V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,x ,

I J UARTERLY EILLANCE DATA  !  !

'O ~,

SEQUOYAH NUCLEAR PLAlff CHANNEL LS-3-107D (LB-5.48C)

FUNCTIONAL UNIT

L; p; :m

[j pyj k

SET POINT *t 1 25% (.2V)

ALLOWABLE VALUE *t 2 24% (.196V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .1997V .1997V 10-04-83 .1999V .1999V 01-06-84 .1996V .1996V 04-09-84 .1996V .1996V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

) UARTERLY EILLANCE DATA i )

N/ \ ,/

SEQUOYAH NUCLEAR PLANT CHANNEL FS-I-3A (FB-512B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High 3

[

ll L9.

y Coincident with Steam Line Pressure' low

~

b SET POINT *t Acutal Steam Flow-Steam Flow Reference $ (.0V)

ALLOWABLE VALUE *t Actual Steam Flesw - Steam Flow Reference 5 (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .0003V .0003V 09-06-83 .0006V .0001V 12-09-83 .0003V .0003V 03-08-84 .0002V .0002V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( . UARTERLY EILLANCE DATA i .

_J '. I SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-3B (FB-513B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident L9.

.3 With Steamline Pressure Low N!Oy 0

N S'3 SET POINT *t Actual Steam Flow - Steam Flow Rcference < (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference < (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-22-83 .0004V .0004v 10-18-83 .0009V .0009V 01-17-84 .0005V .0005V 04-16-84 .0010V .0010V NOTE:

  • As dafined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

I'

, x .

) UARTERLY EILLANCE DATA ( )

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-5A/B (PB-5.16A) gm n FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines Ifigh Coincident h 03 With Steamline Pressure Low N y I>Q~I n

'I

  1. p h'3 l

SET POINT *t 1 600 psig (.300V)

ALLOWABLE VALUE *t  ? 580 psig (.293V)

SET PCINT SET POINT DATE AS FOUND t AS LEFT t 05-16-83 .2997V .2997V 08-13-83 .2997V .2997v 11-03-83 .3001V .3001V 01-24-84 .3026V .2990V 04-26-84 .2995V .2995V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or enginccring units

I I

T Nt I

OT VVVV PF 41 42 E 0090 TL 0000 E 0000 SS A

s t

i A 4 n T - u A 3. g D T )

V 3n N 2 i E A 6 dr C L 0 ne N P 0 ae A ( n L R 1i L A t < g I E n n E L e ) e 2. e C d V c 2

U 'i 0 n e e r N n ( r so i e e H o < f le Y A C e bg L Y e R R O h c aa g n w tt E U i e o Tt l T Q H r l N no R E e F I D ov A s f S e e m ON VVVV i U n R a PU 4142 tr i e O 0000 ae l w o

t S

TF 0000 ch m

a l E 0000 it e F - SS fi t A ie S m w c ,

a o e ,

o e l pt w t F T S sn .

m e n - a lt i e as w t w o S ci _

o l is l

F F l a

nn

)

u ho B

2 m w

o m

a t cc 2 a L e c e 5 e t A te

- t e S b B

F S r u

n

( s l

a t id s u l A

  • e t
  • du 0 r c eo 1 T P A E nh

- I U is _

1 N e L f U n t A es S i F l

  • V dt

\

) /

L m i

_ A a e

T E sn

._ N t N L AU

, L O S I B 3333 l\

E I O A 8888 *t N T h P W - - - -  :

N C t O E 6698 E A N i W T L T 0000

- - - - T H U E L A 6923 O C F S A D 001 0 N l i

~1

} UARTERLY EILLANCE DATA I,

,, / ~

SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-10B (FB-523B) na Lq FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident ' (j fy

. t. p 2 0 With Steamline Pressure Low ' '8 l~a SET POINT *t Actual Steam Flow - Steam Flow Reference 5 (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference 5 (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .0006V .0006V 10-18-83 .0000V .0000V 01-17-84 .0009V .0009V 04-16-84 .0010V .0010V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

(

~ ,

p

[ ) UARTERLY EILLANCE DATA-l l xd-s SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-12A/B (PB-526A)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident With Steamline Pressure Low U '

SET POINT *t 2 600 psig (.300V)

ALLOWABLE VALUE *t 2 580 psig (.293V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-16-83 .2994V .2994V 07-07-83 .2994V .2994V 10-04-83 .3003V .3003V 01-09-84 .2996V .2996V 04-09-84 .2993V .2993V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

1

/ * ,

UARTERLY EILLANCE DATA I

_.J SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-21A (FB-532B)

Steam Flow in Two Steamlines Iligh Coincident q gni LqI FUNCTIONAL UNIT

  • H .J b' t.Q p With Steamline Pressure Low D S'

._4 SET POINT *t Actual Steam Flow - Steam Flow Reference 5 (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference 5 (.0062V)

SET POINT , SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .0002V .0002V 09-06-83 .0003V .0003V 12-09-83 .0002V .0002V 03-08-84 .0003V .0003V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

~1 7--

) UARTERLY ILLANCE DATA SEQUOYAH NUCLEAR PLANT CHANNEL FS-1-21B (FB-533B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident b h'

With Steamline Pressure Low hl N1 PP dd

  1. p 69 c SET POINT *t Actual Steam Flow - Steam Flow Reference $ (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference $ (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .0005V .0005V 10-18-83 .0007V .0007V 01-17-84 .0006V .0006V 04-16-84 .0004V .0004V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

9 j UARTERLY EILLANCE DATA x

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-23A/B (PB-536A)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident ' Dy N U **t"I} g H i r With Steamline Pressure Low r "3 SET POINT *t 3 600 psig (.300V)

ALLOWABLE VALUE *t 2 580 psig (.293V)

SET POINT SET POINT DATE AS FOUND T AS LEFT t 05-16-83 .2992V .2992V 10-04-83 .2998V .2998V 01-09-84 .2993V .2993V 04-09-84 .2992V .2992V NOTE:

  • As defined in technical soecification tables 2.2-1 and 3.3-4 t Units should be consisten't, either voltage or engineering units

1 l UARTERLY ILLANCE DATA l SEQUOYAH NUCLEAR PLANT NMIEL FS-1-28A (FB-542B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident R v Q" g

43 y

With dteamline Pressure Low "

SET POINT *t Actual Steam Flow - Steam Flow Reference < (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference $ (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .0003V .0003V 09-06-83 .0002V .0003V 12-09-83 .0001V .000lV 03-08-84 .0004V .0004V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

~

) QUARTERLY ILLANCE DATA SEQUOYAH NUCLEAR PLANT s

CHANNEL FS-1-28B (FB-543B)

FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident 9y a

With Steam Line Pressure Low N<W 0

'8 r

b' SET POINT *t Actual Steam Flow - Steam Flow Reference 5 (.0V)

ALLOWABLE VALUE *t Actual Steam Flow - Steam Flow Reference 1 (.0062V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .0006V .0006V 10-14-83 .0006V .0006V 01-17-84 .0006V .0006V 04-16-84 .0010V .0010V NOTE:

  • As defined ir technical specification tables 2.2-1 and 3.3-4 i Units should w consistent, either voltage or engineering units

t .

UARTERLY 1

\ ] 'EILLANCE DATA ( ,

' ~ '

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-30A/B (PB-546A) m r FUNCTIONAL UNIT

  • Steam Flow in Two Steamlines High Coincident 9 r'l 8 "h I.l

, j,J With Steamline Pressure Low O' SET POINT *t 2 600 psig (.300V)

ALLOWABLE VALUE *t  ? 580 psig (.293V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-16-83 .3002V .3002V 08-13-83 .3007V .3007V 1 83 .2988V .2988V 01-24-84 .3002V .2996V 04-26-84 .2991V .2991V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( ) OUARTERLY EILLANCE DATA l c' ~_J SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-35B/A (FB-5108)

FUNCTIONAL UNIT

SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .1262V .1262V 09-06-83 .1260V .1260V 12-09-83 .1260V .1260V 03-08-84 .1260V .1260V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

f .

I I UARTERLY EILLANCE DATA )

-]

,1 SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-35D/E (FB-511B) ..

r nm o FUNCTIONAL UNIT

  • Steau/Feedwater Flow Mismatch ( iy L Ij r y; L $b N>. r$~s SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t $ 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-22-83 .1266V .1266V 10-18-83 .1263V .1263V 01-17-84 .1263V .1263V 04-16-84 .1264V .1264V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

l UARTERLY ILLANCE DATA l SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-48B/A' (FB-520B) t m n FUNCTIONAL UNIT

  • Steam Feedwater Flow tfismatch [ y Lj i /7 di/ U !"l [,

SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

L f

SET POINT SET POINT DATE AS FOJND t AS LEFT t 06-06-83 .1262V .1264V 09-06-83 .1262V .1262V 12-09-83 .1265V .1265V 03-08-83 .1265V .1265V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

i UARTERLY EILLANCE DATA

-l -

SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-48D/E'(FB-521B)

Steam /Feedwater Flow Mismatch np FUNCTIONAL UNIT * . "Q

.. p bI f$n SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .1265V .1265V 10-18-83 .1265V .1265V 01-17-84 .1266V .1266V 04-16-84 .1265V .1265V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

g l

m. i

(, j UARTERLY EILLANCE DATA ,

(

~- -.

SEQUOYAH NUCLEAR PLANT FS-3-90B/A (FB-530B)

CHANNEL FUNCTIONAL UNIT

  • Steam /Feedwater Flow Mismat.ch -

SET POINT *t 5 40% (.1262V) --

,e '

ALLOWABLE VALUE'*t 5 42.5% (.1409V) f

, i l'

^

SET POINT '

SET POINT - '

DATE AS_.FOUND t AS_,LEFT t

, .i 06-06-83 ' .1260V ,' , .1260V e 09-06-83 e .1263V i

.1263V 12-09-83 *

.1263V .1263V 03-08-83 ,

.1264V - .1264V /

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should La consistent, either voltage or engineering units

.=---

-3,

/ i (,

( ) UARTERLY EILLANCE DATA (

SEQUOYAH NUCLEAR PLANT CHANNUL FS-3-90D/E-(FB-531B) nm -

FUNCTIONAL UNIT

  • Steam /Feedwater Flow Mismatch 8 (I b.

A )y ers Me O SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .1263V .1263V 10-18-83 .1267V .1267V 01-17-84 .1265V .1265V 04-16-84 .1265V .1265V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,/'_ y UARTERLY

\' / EILLANCE DATA i I

- \, ,)

SEQUOYAH NUCLEAR PLANT

?

CHANNEL FS-3-103B/A .(FB- 540B)

FUNCTIONAL UNIT

  • Steam /Feedwater Flow Mismatch ;5 a

fJ L]

b $.. (N,,

~-

SET POINT *t 5 40% (.1262V)

ALLOWABLE VALUE *t , 5 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .1259V .1259V 09-06-83 .1312V .1262V 12-09-83 .1262V .1262V 03-08-84 .1265V .1265V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units I

,~. .

( ) UARTERLY EILLANCE DATA (

'.,_/ ,

SEQUOYAH NUCLEAR PLANT CHANNEL FS-3-103D/E (FB-541B) 3 O FUNCTIONAL UNIT

  • Steam /Feedwater Flow ttismatch ,y".

r a3 g

N* eb SET POINT *t 5 40% (.1262V)

ALLGWABLE VALUE *t $ 42.5% (.1409V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .1266V .1266V 10-19-83 .1262V .1262V 01-17-84 .1262V .1262V 04-16-84 .1263V .1263V 4

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

,7 .

'N / UARTERLY EILLANCE DATA ( )

'mj w../

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-2A/D (P.B-514A)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High a SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t i 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .0334V .0334V 09-06-83 .0339V .0333V 12-09-83 .0333V .0333V 03-08-84 .0333V .0333V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

- rr

r

/

7- 1 (v ) UARTERLY EILLANCE DATA I, x._,/

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-2D/A (PB-514B)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - liigh SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t .

06-06-83 .0330V .0330V 09-06-83 .0325V .0333V 12-09-83 .0335V .0335V 03-08-84 .0332V .0332V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,~ , ..~.

! '8 /

i s l UARTERLY EILLANCE DATA  !

N~_ / v SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-2B/E (PB-5,15A) rl rc FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - IIigh '

r ;l )q

(jnm .j

(

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-22-83 .0332V .0332V 10-18-83 .0328V .0328V 01-17-84 .0332V .0332V 04-16-84 .0337V .0337V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

'l 7- - ,

p-(x-./ ) UARTERLY EILLANCE DATA (

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-2E/B (PB-515B) r gcm Lq FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - liigh '

,. L [1v.

n p.7 h) N b5 SET POINT *t $100 psi (.0333V)

ALLOWABLE VALUE *t i 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-22-83 .0333V .0333V 10-18-83 .0339V .0339V 01-17-84 .0335V .0335V 04-16-84 .0331V .0331V-NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

7x, ,- s

( ) UARTERLY EILLANCE DATA (\ ,. / l y_,/ '

-SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-5D/E (PB-516C) rt = 9 FUNCTIONAL UNIT

  • Differential Pressure Between Steamlines - IIigh ,4 {l L,

,n t'i t- /y h! $

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LT;FT t 05-16-83 .0326V .0326V 08-13-83 .0335V .0335V 11-03-83 .0333V .0333V 01-24-84 .0325V .0325V 04-26-84 .0325V .0325V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

, J. .

UARTERLY EILLANCE DATA  !

( .. -

} x-J SEQUOYAH NUCLEAR PLANT CHANNEa PS-1-SE/D (PB-516D)

FUNCTIONAL UNIT

  • Differential Pressure Between Steamlines - High [

SET POINT *t i 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-16-83 .0335v .0335V 08-13-83 .0333V .0333V 11-03-83 .0330V .0330V 01-24-84 .0332V .0332V 04-26-84 .0329V .0329V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering anits

,A -

! UARTERLY EILLANCE DATA N_ _,Y' \v' SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-9A/B (PB-525A)

FUNCTIONAL UNIT

  • Differential Pressure Between Steamlines - Iligh } .

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t $ 112 psi'(.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .0336V .0336V 10-18-83 .0339V .0339V 01-17-84 .0338V .0338V 04-16-84 .0336V .0336V i

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

[ l UARTERLY EILLANCE DATA ( i

'wJ

~

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-9B/A (PB-525B)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High )

SET POINT *t i 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 08-23-83 .0329V .0329V 10-18-83 .0331V .0331V 01-17-84 .0332V .0332V 04-16-84 .0329V .0329V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units t

=. - _- ~ - . - , ,

,x . -

[ ') UARTERLY EILLANCE DATA ( j q ,,/ w-SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-12D/E (PB-526C) q tm o FUNCTIONAL UNIT

  • Differential Prer .ure Between Steamlines - IIigh H ,

If " Ij l //

N" r$

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t _< 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-16-83 .0331V .0331V 07-07-83 .0334V .0334V 10-04-83 .0337V .0337V 01-09-84 .0332V .0332V 04-09-84 .0335V .0335V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

(y) QUARTERLY EILLANCE DATA NJ .

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-12E/D (PB-526D) _

FUNCTIONAL UNIT

  • Differential Pressure Between Steamlines - High SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t $ 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 05-16-83 .0334V .0334V 07-07-83 .0333V .0333V 10-04-83 .0332V .0332V 01-09-84 .0334V .0334V 04-09-84 .0330V .0330V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

- , ~

t,  ! UARTERLY ILLANCE DATA ( l N_,,J ' . ..)

SEQUOYAH NUCLEAR PLANT CHANNEL PS-1-20A/B (PB-534A)

Differential Pressure Between Steam Lines - liigh r; am h [j L9.y.

FUNCTIONAL UNIT

  • q ,

l 0R E

^

kl h b SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .0332V .0332V 09-06-83 .0330V .0330V 12-09-83 .0327V .0327V 03-08-84 .0329V .0329V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,5 ,

[ 'l UARTERLY EILLANCE DATA i Q,) w.l SEQUOYAH NUCLEAR PLANT CHANNEL P;-1-20B/A'(PB-534B)

FUNCTIONAL UNIT

  • Differential Pressure Between Steam Lines - High [

SET POINT *t 5 100 psi (.0333V)

ALLOWABLE VALUE *t 5 112 psi (.037V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-06-83 .0340V .0340V 09-06-83 .0336V .0336V 12-09-83 .0339V .0339V 03-09-84 .0337V .0337V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

( UARTERLY EILLANCE DATA  ! l

'N_/') _

SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-42B/A. (PB-934B)

FUNCTIONAL UNIT

  • Containment Pressure High b Lg t 13 [j y Jtatm 3

.b N, [m f,

SET POINT *t 5 1.54 psig (.1635V)

ALLOWABLE VALUE *t 5 1.7 psig (.1675V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-13-83 .1638V .1638V 11-03-83 .1641V .1637V 01-25-84 .1634V .1634V i 04-26-84 .1640V .1640V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,,\

i pUARTERLY BILLANCE DATA  !

,) '

SEQUOYAH NUCLEAR PLIET CHANNEL PDS-30-43B (PB-935B)

FUNCTIONAL UNIT

  • Co6tainment Pressure liigh f, h L9j

'p j,.

l fl N,. &

SET POINT *t 5 1.54 psig (.1635V)

ALLOWABLE VALUE *t 5 1.7 psig (.1675V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .1641V .1641V 10-04-83 .1639V .1639V 01-06-84 .1640V .1640V 04-09-84 .1640V .1640V l

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

( ) UARTERLY EILLANCE DATA ( )

'._ /

s \_/

_SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-44B/A (PB-936B)

FUNCTIONAL UNIT

  • Containment Pressure High II SET POINT *t 5 1.54 psig (.1635V)

ALLOWABLE VALUE *t 5 1.7 psig (.1675V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .1637V .1637V 10-19-S3 .1637V .1637V 01-17-84 .1642V .1642V 04-16-84 .1641V .1641V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

,x, ,

/ i UARTERLY EILLANCE DATA  !

\y l 8 -

,/ .-

SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-42A/B (PB-934A)

FUNCTIONAL UNIT

  • Containment Pressure - Ifigh-Iligh De a (j

^

Ljj l et r. p hl N [m SET POINT *t 5 2.81 psig (.1952V)

ALLOWABLE VALUE *t 5 2.97 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-13-83 .1958V .1958V 11-03-83 .1961V .1961V 01-29-84 .1942V .1954V 04-26-84 .1960V .1960V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be censistent, either voltage or engineering units

j .

7---

j UARTERLY EILLANCE DATA ( <

s_- V SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-43A (PB-935A) ,

r :m Lq FUNCTIONAL UNIT

  • Containment Pressure - Ifigh-liigh n [j y l I?

U N" [-s SET POINT *t 5 2.81 psig (.1952V)

ALLOWABLE VALUE *t 5 2.97 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 07-07-83 .1960V .1960V 10-04-83 .1962V .1962V 01-06-84 .1958V .1958V 04-09-84 .1960V .1960V s

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

SEQUOYAH NUCLEAR PLANT CHANNEL PDS-30-44A/B (PB-936A) n FUNCTIONAL UNIT

  • Containment Pressure - liigh-liigh ql t bnny L j' I hy M

$1 ft Gs SET POINT *t 5 2.81 psig (.1952V)

ALLOWABLE VALUE *t 5 2S7 psig (.1992V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 08-23-83 .1955V .1955V 10-19-83 .1957V .1957V 01-17-84 .1955V .1955V 04-16-84 .1956V .1956V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units shouldsbe consiste;. either voltage or engineering units

[ UARTERLY EILLANCE DATA (w-

  • SEQUOYAH NUCLEAR PLANT .

CHANNEL PDS-30-45A (PB-937A)'

FUNCTIONAL UNIT

  • Containment Pressure - liigh-liigh ,

SET POINT *t 5 2.81 psig (.1952V)

ALLOWABLE VALUE *t 5 397 psig (.1992V)

SET POINT SET POINT DATE AS FOUND i AS LEFT t 06-6-83 .1954V .1954V 09-6-83 .1955V .1952V 12-9-83 .1955V .1955V 03-8-84 .1952V .1952V f

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

-3 ,

(x ,e

) UARTERLY EILLANCE DATA (

SEQUOYAH NUCLEAR PLANT CHANNEL N41 NC301 rl nm o FUNCTIOtIAL UNIT

  • Power Range Neutron Flux - High Negative Trip Rate ,

, - [j L9, 1 /?

OD U .N 03 SET POINT *t 5 3%

ALLOWABLE VALUE *t 5 3.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 3% 3%

09-06-83 3% 3%

12-05-83 3% 3%

03-05-84 3% 3%

~

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or etgineering units I

l

,-~~. .,

e s i

's j QUARTERLY EILLANCE DATA

/

i,  !

s ,_/ s ,/

SEQUOYAH NUCLEAR PLANT CHANNEL N41 NC-303 FUNCTIONAL UNIT

  • Poser Range Neutron Flux High Positive Trip Rate ,

SET POINT *t 55%

ALLOWABLE VALUE *t 5 5.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t .

06-15-83 5% 5%

09-06-83

~

5% 5%

12-05-83 5% 5%

03-05-84 5% 5%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,, y , ,---

I ] UARTERLY EILLANCE DATA I ).

C/ ,-

SEQUOYAH NUCLEAR PLANT CHANNEL N41 NC305 FUNCTIONAL UNIT

  • Power Range Neutron Flux - Low Setpoint '

SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t 5 26% ($ 2.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 2.082V 2.082V 09-06-83 2.083V 2.083V 12-05-83 2.084V 2.084V 03-05-84 2.082V 2.082V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

J .

!s l .. , UARTERLY EILLANCE DATA t j

\_,.

/ , .

' ( '

4....

7-SEQUOYAH NUCLEAR PLANT

\

CHANNEL N41 NC-306 r n::s e FUNCTIONAL UNIT

  • Poser Range Neutron Flux - High Setpoint '

r  ! i fj " I) n

g dh f, L

SET POINT *t. $ 10')% ($ 9.083V)

ALLOWABLE,VALUE *t 5 110% ($ 9.167V) -

t

_~ _ .

e'

~ '

SET POINT _

SET POINT DATE AS FOUND t _

AS LEFT t 06-15-63 9.087V 9.087V 09-06-83 _ 9.096V 9.096V 12-05-83 9.092V 9.092V 03-05-84 9.090V 9.090V N

T NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

,~

, / --

(  ; QUARTERLY EILLANCE DATA .(

'\ ~j SEQUOYAH NUCLEAR PLANT CHANNEL N42 ~NC-301 -

ll ' !5 tra Lg FUNCTIONAL UNIT

  • Poker Range Neutron Flux High Negative Trip Rate il h (j

. ,d

! e W.:'1 SET POINT *t 5 3%

ALLOWABLE VALUE *t < 3.3%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-14-83 3% 3%

09-08-83 3% 3%

12-15-83 3% 3%

03-06-84 3% 3%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

.q .

,/-~.8,

/ UARTERLY EILLANCE DATA

) ( )

x. -

SEQUOYAH NUCLEAR PLANT CHANNEL N42 NC-303 na a FUNCTIONAL, UNIT.* Poser Range Neutron Flux High Positive Trip Rate. .- ', '

[j aj fY ~ (f.,~s

> ts SET POINT *t 5 5% ~

4 ALLOWABLE VALUE *t -$ 5.5%.

s SET POINT SET POINT DATE AS-FOUND t

, AS LEFT t 06-14-83 5% ,

, 5% '

09-08-83 5% 5%

12-15-83 5%

5%

03-06-84 5% 5%

E.

N NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units

a

,, ! . ,'y

( ) UARTERLY EILLANCE DATA i Q_,) 'w J SEQUOYAH NUCLEAR PLANT CHANNEL N42 NC-305 FUNCTIONAL UNIT

  • Power Range Neutron Flux Low Setpoint g ,h [f t*

D SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t 5 26% ($ 2.167V)

~

SET POINT. SET POINT DATE AS FOUND t AS LEFT t 06-14-83 2.073V 2.073V 09-08-83 2.075V 2.075V 12-15-83 2.077V 2.077V 03-06-84 2.076V 2.076V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

,.a , - - -

I ') UARTERLY EILLANCE DATA f

_ ,1 N. /'j '

SEQUOYAH NUCLEAR PLANT CHANNEL N42 NC-306 FUNCTIONAL UNIT * ' Power Range Neutron Flux - High Setpoint SET POINT *t 5 109% ($ 9.083V)

ALLOWABLE VALUE *t 5 110% ($ 9.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-14-83 9.087V 9.087V 09-08-83 9.085V 9.085V 12-15-83 9.086V 9.086V 03-06-84 9.085V 9.085V 1

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units
t. ,

, ,2-l' ) UARTERLY EILLANCE DATA  ; I

\. ,) -j SEQUOYAH NUCLEAR PLANT CHANNEL N43 NC-301 FUNCTIONAL UNIT

  • Power Range Neutron Flux High negative Trip Rate } .

SET POINT *t 53%

ALLOWABLE VALUE *t 5 3.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 3% 3%

09-07-83 3% 3%

12-05-83 3% 3%

03-05-84 3% 3%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units e -

s fk. ( ,7"%

l UARTERLY EILLANCE DATA (</

,/

) ,

)

SEQUOYAH NUCLEAR PLANT CHANNEL N43 NC-303 9 23 Power Range Neutron Flux High Positive Trip Rate L7 FUNCTIONAL UNIT

  • K

.. []

J f,

$$ $ (h SET POINT *t 5 5%

ALLOWABLE VALUE *t 5 5.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 5%. 5%

09-07-83 5% 5%

12-05-83 5% 5%

03-05-84 5% 5%

4 NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units i

='sy

[_,.a ) UARTERLY EILLANCE DATA N .,/ s_.-

SEQUOYAH NUCLEAR PLANT CHANNEL N43 NC-305 Il

m p,a FUNCTIONAL UNIT
  • Power Range Neutron Flux Low Setpoint t, ,

.Q

/>'

! 9

^

h [n SET POINT *t 5 25% ($ 2.083V)

ALLOWABLE VALUE *t 5 26% ($ 2.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-15-83 2.019V 2.019V 09-07-83 2.080V 2.080V 12-05-83 2.082V 2.082V 03-05-84 2.080V 2.080V t

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units 4

k

-- - w

/-

1 ') UARTERLY EILLANCE DATA ( )

L ,/ -

SEQUOYAH NUCLEAR PLANT CHANNEL _ N43 NC-306 l

crn n FUNCTIONAL UNIT

  • Power Range Neutron Flux liigh Setpoint L j' 1b [I 1

ef p b

SET POINT *t i 109% ($ 9.083V)

ALLOWABLE VALUE *t 5 110% ($ 9.167V)

SET PCINT SET POINT DATE AS FOUND t

_ AS LEFT t 00-15-83 9.076V 9.076V 09-01-83 9.078V 9.078V 12-05-83 9.078V 9.078V 03-05-84 9.081V 9.081V NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units ,

s.

7

.; ) UARTERLY EILLANCE DATA i  ;

' ,._ ,) \, -)

SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC-301 nm Lq FUNCTIONAL UNIT

  • Power Range Neutron Flux High Negative Trip Rate ll .g 1 p U ft [m SET POINT *t 53%

ALLOWABLE VALUE *t 5 3.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-10-83 3% 3%

09-09-83 3% 3%

12-14-83 3% 3%

03-06-84 3% 3%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should ba consistent, either voltage or engineering units

)_. ,

,-s

)) UARTERLY EILLANCE DATA (  !

NJ' SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC-303 FUNCTIONAL UNIT

  • Power Range Neutron Flux Ifigh Positive Trip Rate SET POINT *t 55%

ALLOWABLE VALUE *t 5 5.5%

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-10-83 5% 5%

09-09-83 5% 5%

12-14-83 5% 5%

03-06-84 5% 5%

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units
g. q _,

(  ; UARTERLY EILLANCE DATA ( l

,/ -

SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC-305 ms FUNCTIONAL UNIT

  • Power Range Neutron Flux Low Setpoint e I} p/d y //

h ($-s SET POINT *t < 25% (< 2.083V)

ALLOWABLE VALUE *t < 26% (< 2.167V)

SET POINT SET POINT DATE AS FOUND t AS LEFT t 06-10-83 2.082V 2.082V 09-09-83 2.084V 2.084V 12-14-83 2.079V 2.079V 03-06-84 2.084V 2.084V NOTE:

  • As defined in technical speci fication tables 2.2-1 and 3.3-4 i Units should be consistent, either voltage or engineering units

7 - ~s l' UARTERLY EILLANCE DATA (

,I )

J SEQUOYAH NUCLEAR PLANT CHANNEL N44 NC-306 FUNCTIONAL UNIT

  • Power Range Neutron Flux High Setpoint SET POINT *t $ 109% ($ 9.083V)

ALLOWABLE VALUE *t 5 110% ($ 9.167V)

SET POINT SET POINT DATE AS FOUND 1 AS LEFT t 06-10-83 4.585V 4.585V (see note below) 09-09-83 9.079V 9.079V 12-14-83 9.078V 9.078V 03-06-84 9.084V 9.084V NOTE: liigh Level Trip changed to 55% (4.667V) power due to plant conditions. The mt. g'n of safety is increased due to the lower trip setpoint, and setpoint is still within technicai :pecification limits.

NOTE:

  • As defined in technical specification tables 2.2-1 and 3.3-4 t Units should be consistent, either voltage or engineering units