Text
_-_
[
'N Commonwealth ECson g 4;
/ One First NationIl Plaza, Chicsgo, lilinois 8 l
-__ 7 Address Riply to: Post Office Box 767
/
5\\
/ Chicago, Illinois 60690 June 29, 1984 R. C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Reglatory Commission Washington, D.C.
20555
Subject:
Byron Generating Station Units 1 and 2 Independent Design Inspection NRC Inspection Report No. 50-454/83-32 Reference (a):
June 11, 1984 letter from Cordell Reed to R. C. DeYoung.
Dear Mr. DeYoung:
This is to provide a second interim report on the independent design review project which was described in reference (a).
The enclosed document provides a status report on the Bechtel review of high and moderate energy line breaks.
This report supplements the May interim report provided in reference (a).
Please address further questions regarding this matter to this office.
One signed original and fifteen copies of this letter and the enclosure are provided for NRC review.
Very truly yours, Cordell Reed Vice President
-lm cc:
J. G. Keppler w/ Encl.
Enclosure:
" Byron Station,-Independent Design Review for Commonwealth Edison Company, Interim Report,"
June 1984, Bechtel Power Corporation.
feo/
I
'8407030250 840629 PDR ADOCK 05000454
/
G PDR