Forwards Application for Amend to License DPR-66,revising Tech Specs Re Surveillance Requirements & Bases to Incorporate Exemption from 10-yr Svc Period Re Type a Containment Integrated Leakage Rate Test Frequency
ML20092N558
Person / Time
Site: Beaver Valley
Issue date: 06/25/1984
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20092N559 List:
References
NUDOCS 8407030276
Download: ML20092N558 (1)


Text

_ _ - _ _ _.

b /mm

'Af M

Telephone (412) 393-6000 Nue' ear Division P. O. Box 4 Shippingport, PA 15077-0004 June 25, 1984 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Change Request No. 101 to Operating License and Request for Exemption to 10CFR50 Appendix J.III.D.l(a)

Gentlemen:

En::losed are:

1.

Three (3) originals and thirty-seven (37) copies of an Application for Amendment to our Operating License No. DPR-66 to revise surveillance requirement 4.6.1.2a and bases to incorporate an exemption to 10CFR50 Appendix J.III.D.l(a) to establish a 40 10-month Type A Containment Integrated Leakage Rate Test frequency without reference to the 10-year service period.

Surveillance Requirement 4.6.1.2a presently requires containment Type A tests to be. conducted at 40 10-month intervals and the third test of each set to be conducted during.the shutdown for the 10-year inservice inspection. By letter dated May 21, 1984 the NRC granted an extension of the 10-year inservice inspection period.

This will enable scheduling the 10-year inservice inspection for late 1987.

The second Type A test was completed in May 1982, therefore, it is not possible to perform the third Type A test at the shutdown for the 10-year inservice inspection and also comply with the 40 i 10-month interval requirement.

2.

Forty (40) copies of documents designated Attachments A and B which setforth the chefoge in technical specifications, the request for exemption to 10 CFR 50 Appendix J.III.D.l(a) and its safety evaluation.

A license amendment application fee of $150.00 will be submitted under separate cover in accordance with 10CFR170.

Ver tr y yours,

. J. Carey Vice President, Nuclear i

i 8407030276 840 25 DR ADOCK 05000334 p