Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091D287 + (ML20091D287)
- ML20091D291 + (ML20091D291)
- B14079, Discusses Region I Augmented Insp Team Insp Rept 50-336/91-81,concerning Failure of Moisture Separator Reheater Drain Line Elbow at Millstone Unit 2 on 911106 + (ML20091D292)
- ML20091D293 + (ML20091D293)
- ML20091D299 + (ML20091D299)
- ML20091D310 + (ML20091D310)
- ML20091D319 + (ML20091D319)
- 05000282/LER-1992-004-01, :on 920306,discovered Failure to Perform Full Flow Test of turbine-driven Auxiliary Feedwater Pumps.Caused by Personnel Error.Comprehensive Review of Testing Requirements Being Conducted + (ML20091D362)
- ML20091D364 + (ML20091D364)
- ML20091D368 + (ML20091D368)
- 05000412/LER-1992-002-01, :on 920305,alarm Received Indicating 480-volt Emergency Bus in Trouble.Caused by Ground on Bus Due to Internal Motor Fault.Fan Control Switch Placed in Lockout & Fan Motor Shipped to Vendor for Rewinding + (ML20091D369)
- 05000334/LER-1992-004, :on 920306,results of Formal Calculation Indicated Possibility of Degraded Diesel Generator Ventilation Sys.Caused by Design Deficiency During Original Plant Const.Fan Start Circuits Modified + (ML20091D372)
- ML20091D373 + (ML20091D373)
- ML20091D375 + (ML20091D375)
- ML20091D379 + (ML20091D379)
- BVY-92-055, Advises That Util Performed Rv Head Insp During Outage to Address Concerns Raised in GE SIL 539 & Discovered Possible Cracking in Cladding of RPV Head.No Evidence That Structural Integrity of RPV or Vessel Head Compromised.Evaluation Encl + (ML20091D380)
- 05000354/LER-1992-004-01, :on 920308,during Design Change Implementation, Channel B ECCS Actuation Led to Engineered Safety Sys Actuation.Caused by Design Deficiency & Personnel Errors. Design Change Tested & Personnel Counselled + (ML20091D383)
- ML20091D386 + (ML20091D386)
- ML20091D387 + (ML20091D387)
- 05000370/LER-1992-002-06, :on 920305,train B Experienced Inadvertent Esfa.Caused by Defective Procedure & Inappropriate Actions. Personnel Counselled & Governing Procedure to Be Revised + (ML20091D392)
- ML20091D398 + (ML20091D398)
- NRC-84-0087, Forwards Amplification of Revised Response to Reactor Sys Branch Question 6 Re Pressurizer Level.Amplification of Response to Question 15 Will Be Forwarded Under Separate Cover + (ML20091D409)
- W3P84-1492, Forwards Response to 840518 Request for Addl Info Re Reactor Sys Branch Questions on Tech Specs,Including Reactor Protective Instrumentation Setpoints & RCS Process Variable Limiting Conditions for Operation + (ML20091D411)
- ML20091D413 + (ML20091D413)
- ML20091D416 + (ML20091D416)
- ML20091D424 + (ML20091D424)
- ML20091D426 + (ML20091D426)
- PY-CEI-NRR-1467, Provides Update on Action Plan Re Suppression Pool Stainless Steel Cladding Sensitization Issue Outlined in 801006 Deviation Analysis Rept.Electrochemical Monitoring of Heat Affected Zones of Pool Welds Completed + (ML20091D433)
- ML20091D437 + (ML20091D437)
- ML20091D439 + (ML20091D439)
- B11170, Forwards Response to Auxiliary Systems Branch Draft SER Open Items ASB-10 & ASB-11 Re Control of Heavy Loads + (ML20091D445)
- ML20091D452 + (ML20091D452)
- 05000339/LER-1992-004-01, On 920313,determined That D CRD Mechanism Cooling Fan Timer Drifted Outside Setpoint Limit.Caused by Setpoint Drift.Timer Was Reset & Tested + (ML20091D478)
- ML20091D484 + (ML20091D484)
- ML20091D491 + (ML20091D491)
- ML20091D504 + (ML20091D504)
- ML20091D518 + (ML20091D518)
- ML20091D527 + (ML20091D527)
- 05000354/LER-1991-018-01, :on 910914, F Filtration Recirculation Ventilation (FRVS) Fan Discovered Running Due to Water in Low Flow Switch Combined W/Minor Pressure Perturbation in Ventilation Sys.Design Change Approved + (ML20091D529)
- 05000321/LER-1991-018-01, :on 910917,unanticipated Actuation of ESF Occurred.Caused by Personnel Error.Technician Counseled & Conducted Functional Test Involved Instrumentation to Ensure Operability + (ML20091D533)
- ML20091D535 + (ML20091D535)
- ML20091D541 + (ML20091D541)
- ML20091D545 + (ML20091D545)
- 05000368/LER-1991-016-01, :on 910924,improperly Sealed Fire Barrier Penetration Between Floor of South EDG Room & Overhead of Corridor Outside Sample Room Discovered.Caused by Inadequate Administrative Controls.Fire Watch Posted + (ML20091D546)
- ML20091D550 + (ML20091D550)
- 05000331/LER-1991-010, :on 910917,discovered That Four Foxboro Instrument Nests,Located in Control Room,Did Not Match Seismic Test Configuration.Caused by Missing Bumpers & Guide Rails.Guide Rails & Bumpers Installed + (ML20091D551)
- ML20091D553 + (ML20091D553)
- 05000456/LER-1991-010-06, :on 910929,containment Fuel Handling Incident Area Radiation Monitor Went Into hi-hi Alarm & Interlock Actuation.Caused by Sudden Spiking of Detector.Detector Replaced & Monitor Calibr & Returned to Svc + (ML20091D555)
- 05000498/LER-1991-020, :on 910914,rod Position Deviation Monitor Incorrectly Declared Inoperable.Caused by Failure to Perform Two Rod Position Surveillances.Formal Training Classes Will Be Held for Licensed Operators + (ML20091D556)
- ML20091D557 + (ML20091D557)
- 05000370/LER-1991-009-04, :on 910916,discovered That Auxiliary Bldg Ventilation Return Isolation Valve Not Listed in Procedure from 851216-880531.Possibly Caused by Inappropriate Action. Procedure Changed to Add Valve to Checklist + (ML20091D559)