Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087N460 + (ML20087N460)
- ML20087N462 + (ML20087N462)
- AECM-84-0208, Forwards Payment for 840329 Proposed License Amend. Remittance Inadvertently Omitted from 840329 Submittal + (ML20087N467)
- ML20087N471 + (ML20087N471)
- 3F0384-12, Requests Permanent Withdrawal from Consideration of 790321 Tech Spec Change Request 37 Re HPI Cycles & Credit for Unused Portion of Licensing Fee + (ML20087N473)
- ML20087N486 + (ML20087N486)
- ML20087N489 + (ML20087N489)
- 0CAN018420, Advises That Based on 840113 Meeting,Position Reevaluated on Reactor & Senior Reactor Operator Exams Conducted on 830920.No Action Requested on .Waivers Requested for Candidates Affected by Sections 4 & 7 of Exam + (ML20087N490)
- 05000293/LER-1980-041-03, Isolation Valves 5065-17 & 5065-22 Declared Inoperable.Caused by Valve Limits Being Out of Adjustment.Valve Items Adjusted & Exercised to Provide Correct Operation + (ML20087N491)
- AECM-84-0180, Rev 1 to Procedure 14-S-01-4, Training & Administrative Section Procedure + (ML20087N496)
- ML20087N499 + (ML20087N499)
- B11027, Forwards Response to Encl 4,Item 1 of NRC Re safety-related Structures,Sys & Components Controlled by QA Program & Draft SER Open Item Re Q-list + (ML20087N500)
- 1CAN118311, Requests That 20-day Appeal Period Begin from Date Ltrs of Denial Signed & Mailed & Not from Date on Denial Ltr,Per 831123 Telcon Re Ltrs of Denial Issued to Reactor & Senior Reactor Operator Candidates + (ML20087N501)
- RBG-17-339, Forwards Supplemental Responses to Draft SER Open Items Identified by Radiological Assessment Branch & Addressed in Util 831122 & s.Summary Listing of Each Item Encl. Responses Will Be Provided in Future FSAR Amend + (ML20087N506)
- 2CAN038401, Application to Amend License NPF-6,deleting Tech Spec Section 4.8.1.1.2.c.7 Re Diesel Generator Surveillance Requirements + (ML20087N508)
- ML20087N511 + (ML20087N511)
- ML20087N512 + (ML20087N512)
- ML20087N516 + (ML20087N516)
- ML20087N518 + (ML20087N518)
- ML20087N521 + (ML20087N521)
- ML20087N522 + (ML20087N522)
- ML20087N523 + (ML20087N523)
- ML20087N527 + (ML20087N527)
- B11088, Summarizes Structural & Geotechnical Engineering Branch 840227-0302 Structural Design Audit of Facility Per Draft Ser.Audit Agenda,List of Attendees & Status of Items Developed During Audit Encl + (ML20087N529)
- ML20087N530 + (ML20087N530)
- ML20087N531 + (ML20087N531)
- ML20087N536 + (ML20087N536)
- ML20087N555 + (ML20087N555)
- ML20087N565 + (ML20087N565)
- ML20087N569 + (ML20087N569)
- ML20087N574 + (ML20087N574)
- ML20087N577 + (ML20087N577)
- ML20087N580 + (ML20087N580)
- ML20087N582 + (ML20087N582)
- 05000397/LER-1984-018, :on 840306,while Performing Surveillance Procedure Testing,Control Room Emergency Filtration Fan Initiated.Caused by Procedural Error.Sys Restored to Previous State + (ML20087N583)
- ML20087N584 + (ML20087N584)
- ML20087N585 + (ML20087N585)
- SNRC-1031, Advises of Relocation to Plant Site of All Nuclear Resources,Including Ofc of Vice President,Nuclear,Nuclear Engineering Dept & Nuclear Operation Support Dept,Effective 840402 + (ML20087N586)
- ML20087N587 + (ML20087N587)
- ML20087N588 + (ML20087N588)
- ML20087N589 + (ML20087N589)
- ML20087N590 + (ML20087N590)
- ML20087N594 + (ML20087N594)
- ML20087N595 + (ML20087N595)
- ML20087N598 + (ML20087N598)
- ML20087N599 + (ML20087N599)
- ML20087N600 + (ML20087N600)
- ML20087N602 + (ML20087N602)
- ML20087N603 + (ML20087N603)
- 05000397/LER-1984-019, :on 840308,when Missing Alarm Light Replaced, Current Surge/Voltage Spike Caused Momentary Hi Chlorine Alarm & Started Control Room Emergency Filtration Sys.Alarm Reset & H&V Returned to Normal + (ML20087N604)
- ML20087N605 + (ML20087N605)