Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000266/1983020 + (ML20087F865)
- ML20087F868 + (ML20087F868)
- ML20087F871 + (ML20087F871)
- ML20087F877 + (ML20087F877)
- ML20087F883 + (ML20087F883)
- ML20087F890 + (ML20087F890)
- ML20087F892 + (ML20087F892)
- ML20087F893 + (ML20087F893)
- ML20087F901 + (ML20087F901)
- 05000416/LER-1995-008-01, :on 950712,inadvertent Reactor Scram Occurred Due to Turbine Trip on Loss of Condenser Vacuum.Replaced Failed Ethylene Propylene Expansion Joint W/Neoprene Expansion Joint + (ML20087F909)
- ML20087F913 + (ML20087F913)
- ML20087F914 + (ML20087F914)
- ML20087F916 + (ML20087F916)
- ML20087F922 + (ML20087F922)
- ML20087F933 + (ML20087F933)
- ML20087F934 + (ML20087F934)
- ML20087F946 + (ML20087F946)
- ST-HL-AE-4856, Suppls to Account for New Circumstances & Facts That Have Occurred or Come to Light Re Revocation of Individual Access + (ML20087F947)
- ML20087F952 + (ML20087F952)
- ML20087F959 + (ML20087F959)
- ML20087F961 + (ML20087F961)
- 0CAN089504, Forwards Proposed Rev to Industrial Security Plan Re Alternative Compensatory Measures.Encl Withheld + (ML20087F963)
- ML20087F975 + (ML20087F975)
- ML20087F977 + (ML20087F977)
- ML20087F978 + (ML20087F978)
- ML20087F991 + (ML20087F991)
- AECM-84-0140, Special Rept 84-014/0:on 840204,listed Fire Doors Blocked Open to Support Planned Maint Activities.Fire Watches Established Per Tech Spec 3.7.7 Until Doors Restored + (ML20087F995)
- BECO-95-114, Discusses 950627 & 28 Single Unit BWR Licensing Managers Meeting Re Improved STS Implementation + (ML20087F999)
- ML20087G001 + (ML20087G001)
- ML20087G002 + (ML20087G002)
- 05000313/LER-1995-009, :on 950715,automatic Reactor Trip Initiated by RPS on High RCS Pressure Resulting in Automatic Closure of Main Turbine Governor & Intercept Valves Due to Failure of Main Generator Output Circuit Breaker + (ML20087G007)
- ML20087G010 + (ML20087G010)
- 0CAN089505, Submits 90 Day Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (ML20087G017)
- ML20087G021 + (ML20087G021)
- ML20087G033 + (ML20087G033)
- ML20087G037 + (ML20087G037)
- 05000423/LER-1995-014-01, :on 950713,TDAFWP Did Not Start within One Minute as Required by TS While Performing Surveillance Test on Tdafwp Due to Governor Valve Position.Revised Procedures + (ML20087G048)
- ML20087G052 + (ML20087G052)
- ML20087G058 + (ML20087G058)
- ML20087G061 + (ML20087G061)
- ML20087G062 + (ML20087G062)
- ML20087G074 + (ML20087G074)
- 05000269/LER-1995-003, :on 950131,operability Evaluation Revealed That Three Units Operating Outside Design Basis Due to Step in Abnormal Procedure (AP) (Loss of LPI) to Split LPI Flow.Ap (Loss of LPI) Revised + (ML20087G075)
- ML20087G077 + (ML20087G077)
- ML20087G081 + (ML20087G081)
- ML20087G091 + (ML20087G091)
- ML20087G097 + (ML20087G097)
- AECM-84-0158, Special Rept 84-012/0:on 840201,special Fire Door Insp Revealed 147 Doors in Auxiliary & Control Bldgs Not in Compliance W/Spec Requirements.Updated Rept Expected by 840531 + (ML20087G101)
- ML20087G102 + (ML20087G102)
- ML20087G103 + (ML20087G103)
- ML20087G110 + (ML20087G110)