Responds to 840123 Telcon Re Violations Noted in IE Insp Rept 50-285/83-30.Corrective Actions:Engineering Evaluation/ Assistance Request FC-84-08 Initiated on 840116 to Upgrade Decontamination Facility,Including Shower,Stall & Plumbing
ML20087F959
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/14/1984
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20087F954 List:
References
LIC-84-044, LIC-84-44, NUDOCS 8403190281
Download: ML20087F959 (2)


Text

~

Omaha Public Power District ,

1623 Harney Omaha, Nebraska 68102 i 402/536-4000 l l

February 14, 1984 ,

LIC-84-044 Mr. Richard P. Denise, Director Division of Resident, Reactor Project

& Engineering Programs U. S. Nuclear Regulatory Commission f

[]5{p))

Region IV t  ;

ppg S gag ^ l:

611 Ryan Plaza Drive, Suite 1000 h' l'

Arlington, Texas 76011

Reference:

Docket No. 50-285 -' -

l

Dear Mr. Denise:

l Inspection Report 83-30; Open Item 8330-01; Emergency Preparedness Decontamination Facility l In a telephone conversation on January 23, 1984 between Mr.

J. L. Montgomery of the Region IV staff and Mr. F. F. Franco and Mr. J. J. Fisicaro of the Omaha Public Power District, it was requested Laat the District provide a written re-sponse as to the corrective actions that would be taken to resolve the sub 3 ect open item.

The District has evaluated the adequacy of the emergency pre-paredness decontamination facility located in the General Em-ployee Training Building at the Fort Calhoun Station and has determined that the facility should be upgraded. Therefore, Engineering Evaluation / Assistance Request FC-84-08 was ini-tiated on January 16, 1984 to upgrade the decontamination 8403190281 840313 Employment with Eaual Opportunity PDR ADOCK 05000285 G *'*#**

PDR

a. . . .. . _ . - -- . .- . . - ~ . . .- _

kQ . .

Mr. Richard P. Denise LIC-84-044  !

Page Two

. facility, including.the shower, shower stall, and associated plumbing. This project has been assigned as a high priority work item and will be completed on a schedule consistent

, with that priority.  :

Sincerely, l YSM '

W. C. Jones Divisio]hManager Production Operations

- WCJ/JJF: jam 1

cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Fampshire Avenue, N.W.

Washington, D.C. 20036 Mr. E. G. Tourigny, Project. Manager Mr. L. A. Yandell, Senior Resident Inspector 4