Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085F982 + (ML20085F982)
- ML20085F984 + (ML20085F984)
- ML20085F988 + (ML20085F988)
- ML20085F989 + (ML20085F989)
- ML20085F990 + (ML20085F990)
- B15260, Notifies of Administrative Error Contained in Plant Unit 3 TS 3.6.1.3, Containment Air Locks, & Requests That Correction Be Made + (ML20085F991)
- ML20085F996 + (ML20085F996)
- ML20085F999 + (ML20085F999)
- ML20085G000 + (ML20085G000)
- ML20085G001 + (ML20085G001)
- ML20085G002 + (ML20085G002)
- ML20085G005 + (ML20085G005)
- BSEP-95-0257, Monthly Operating Repts for May 1995 for Brunswick Steam Electric Plant Units 1 & 2 + (ML20085G007)
- ML20085G010 + (ML20085G010)
- ML20085G011 + (ML20085G011)
- B15268, Forwards Response to NRC Re Violations Noted in Insp Repts 50-336/95-11 & 50-423/95-11 on 950320-31. Corrective Actions:Pdcr MP3-94-079 Was Revised Per Nu Design Control Manual + (ML20085G014)
- ML20085G015 + (ML20085G015)
- ML20085G017 + (ML20085G017)
- ML20085G020 + (ML20085G020)
- ML20085G024 + (ML20085G024)
- ML20085G025 + (ML20085G025)
- ML20085G031 + (ML20085G031)
- ML20085G032 + (ML20085G032)
- ML20085G034 + (ML20085G034)
- ML20085G036 + (ML20085G036)
- ML20085G040 + (ML20085G040)
- ML20085G041 + (ML20085G041)
- ST-HL-AE-5108, Monthly Operating Repts for May 1995 for South Texas Project Units 1 & 2 + (ML20085G043)
- ML20085G046 + (ML20085G046)
- ML20085G047 + (ML20085G047)
- ML20085G048 + (ML20085G048)
- ML20085G058 + (ML20085G058)
- ML20085G059 + (ML20085G059)
- ML20085G061 + (ML20085G061)
- ML20085G064 + (ML20085G064)
- ML20085G065 + (ML20085G065)
- ML20085G071 + (ML20085G071)
- ML20085G073 + (ML20085G073)
- ML20085G076 + (ML20085G076)
- 05000325/LER-1991-024, :on 910914,discovered That Piece of Unistrut Supporting Field Run Conduit Not Secured.On 910914,RHR/LPCI Inboard Injection Valve Declared Inoperable.Cause Indeterminate.Supports Corrected + (ML20085G077)
- HL-1619, Application for Amends to Licenses DPR-57 & NPF-5,changing Tech Specs to Eliminate Rod Sequence Control Sys to Make Unit 1 Specs Consistent W/Unit 2 Specs & to Correct Typos & Clarify Bases + (ML20085G079)
- ML20085G083 + (ML20085G083)
- ML20085G085 + (ML20085G085)
- HL-4870, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/95-09 & 50-366/95-09.Corrective Actions: Made Appropriate Personnel Aware of Requirement to Notify NRC Region II of Impending Exercise Dates + (ML20085G089)
- ML20085G090 + (ML20085G090)
- ML20085G091 + (ML20085G091)
- HL-4864, Trip of Reactor Protection Sys Bus Power Supply Results in Actuations of ESFs + (ML20085G093)
- ML20085G096 + (ML20085G096)
- ML20085G097 + (ML20085G097)
- ML20085G098 + (ML20085G098)
- ML20085G101 + (ML20085G101)