Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/31/1995
From: Cruse C, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9506200031
Download: ML20085G020 (11)


Text

______ -.

CHARLES II. CRUSE Baltimore Gaa and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant 1650 Calven Cliffs Parkway Calvert Cliifs Nuclear Power Plant Lusby, Maryland 20657 4105&42200 Ext.4101 Local 410 260-4101 Baltimore June 15,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 A~ITENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 May 1995 Operatina Data Reoorts The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

Very truly yours, fu.C Q CHC/HOO/bjd Attachments cc: D. A. Brune, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R. I. McLean, DNR L. B. Marsh, NRC J. H. Walter, PSC D. G. Mcdonald, Jr., NRC P. Lewis, INPO T. T. Martin, NRC K. N. Larson, ANI ,

P. R. Wilson, NRC n

9506200031 950531 PDR ADOCK;05000317 R PDR i . f)? ElhSf? $0& _ __ _ ____1-l m

i

\

v l

'e***************************************************************************

UNIT 1 OPERATING DATA REPORT ee*************o************************************************************-

Docket No. 50-317-June 15,'1995 Prepared by. Herman O. Olsen Telephone:(410)260-6734 OPERATING STATUS.

1. UNIT NAME Calvert Cliffs Unit 1 2.: REPORTING PERIOD MAY 1995
3. LICENSED. THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING'(GROSS MWe) 918' 5.~ DESIGN ELECTRICAL RATING (NET.MWo) 845 '
6. MAXIMUM DEPENDABLE CAP'Y (GROSS-MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe)J 835
8. CHANGE IN CAPACITY. RATINGS NONE

-N/A

9. POWER LEVEL TO WHICH RESTRICTED
10. REASONS FOR RESTRICTIONS N/A f

Year- Cumulative This month- to-Date to Date

11. HOURS IN REPORTING PERIOD 744 -3,623 175,884
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 126,503.7
13. REACTOR RESERVE SHUTDOWN HOURS -0.0 0.0 3,019.4

! .14. HOURS GENERATOR ON LINE 744.0 3,623.0 123,859.5

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATEDP(HWH) 1,991,392 9,742,265 314,910,158 17.. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 654,139 3,247,789 104,618,405
18. NET ELECTRICAL ENERGY GENERATED (MWH) 627,654 3,119,662 99,613,930
19. UNIT SERVICE FACTOR 100'0 . 100.0 70.4
20. UNIT AVAILABILITY FACTOR 100.0 100.0- 70.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.0 103.1 68.6
22. UNIT CAPACITY FACTOR (USING DER NET) 99.8 101.9 67.0
23. UNIT < FORCED OUTAGE RATE 0.0 0.0 8.6
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A ,

25. IF SHUTDOWN AT~END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A l

l l

r

, . - ~ - - m, .. .,

4 AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************

Docket No. 50-J17 Calvert Cliffs Unit No. i l June 15, 1995 i Prepared by Herman O. Olsen Telephone: (410) 260-C734 MAY 1995

                              • j Average Daily Power Level Average Daily. Power Level Day (MWe-Net) Day (MWe-Net) 1 863 17 -811 2 863 18 811~

j 3 863 19 817- ,

l 4 864 20 844 I 5 865 21 843 6 863 22 842 7 863- 23 844 I

l 8 863 l' 4 - 842 9 863 25 839 10 863 26 840 i 11 862 27 839

?

i 12 862 28 840 13 842 29 841 14 812 30 836 l

l 15 809 l

l 16 807 l

I

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317- .

UNIT NAME' Cahert Clifs-UI DATE June 15.1995 COMPLETED BY Herman O. Olsen -

TELEPHONE. (410) 260-6734 REPORT MONTH May 1995 MEnlOD OF SIRTIING LICENSEE CAUSE & CORRECTIVE EVENT SYSTEM COMPONENT ACTION TO DURATION ' DOWN-REPORT # CODE 4 CODE 5 PREVENT RECURRENCE NO. DATE TYPEI (IIOURS) REASON 2 REACTOR 3 There were no signifk: ant power reAwianc for tiu a month. ,

t t

3 Method: 4 IEEE Standani 805-1984 1 F: Forced 2 Reason A - Equipment Failur: I - Manual S: Scheduled 2 - Manual Scram.

B - Maintenance or Test

'3 - Automatic Scram. 5 IEEE Standard 803A-1983 C - Refueling D - Regulatory Restriction 4 - Continued E - Operator Training & License Exanunation 5 - Reduced Lead F - Ariminiorative . 9 - Other G - Operational Error H - Other

L DOCKET NO. 50-317 ,

l CALVERT CLIFFS -UNIT 1 )'

l June 15,1995 i

l

SUMMARY

OF OPERATINO EXPERIENCE- )

May 1995 l

1

'Ibe unit began the month at 100% power (860 MWe).

On 05/13/95 at 1305 power was reduced to 98% due to level fluctuations in the first stage of 12 Moisture -

Separator Reheater (MSR). 'Ihe first and second stage reheaters were renoved from service, due to concerns that the fluctuations could cause tube damage due to thermal fatigue. An evaluation was performed and the MSR second stage was returned to service. The MSR first stage was returned to service at a reduced pressure after determining the pressure where the fluctuations occurred. Power was returned

. to 100% (840 MWe) at 2135 on 05/19/95.

The unit ended the month at 100% power (840 MWe).

I d

l I

l I

i

?

l

g .

oce*************************************************************************

UNIT 2 OPERATING DATA REPORT oce************************t4***********************************************

l Docket No. 50-318 June 15, 1995 l Prepared by Herman O. Olsen I Telephone:(410)260-6734 OPERATING STATUS 1.' UNIT NAME Calvert: Cliffs Unit'2

2. REPORTING PERIOD MAY 1995 3.' LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING'(GROSS MWe) 911
5. DESIGN' ELECTRICAL RATING (NET MWe) 845-
6. MAXIMUM DEPENDABLE. CAP 8Y (GROSS MWe) 870
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840
8. CHANGE IN CAPACITY RATINGS .NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date
11. HOURS IN REPORTING PERIOD 744 3,623. 159,239
12. NUMBER OF HOURS REACTOR WAS CRITICAL 351.0 .2,068.8 116,105.8 i
13. REACTOR RESERVE SHUTDOWN' HOURS 0.0 0.0 ~1,296.6
14. HOURS GENERATOR ON LINE 295.8 1,999.3 114,450.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 I 16. GROSS THERMAL ENERGY GENERATED (MWH) 650,787 5,177,935 292,574,864 l 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 209,161 1,727,415 96,742,724

! 18. NET ELECTRICAL ENERGY GENERATED (MWH) 191,897 1,642,196 rs2,463,806 [

19. UNIT SERVICE FACTOR 39.8 55.2 71.9  ;
20. UNIT AVAILABILITY FACTOR -

39.8 55.2 71.9

! 21. UNIT CAPACITY FACTOR (USING MDC NET) 30.7 54.0 70.3

! 22. UNIT CAPACITY FACTOR (USING DER NET) 30.5 53.6 68.7 l 23. UNIT FORCED OUTAGE RATE 14.3 7.9 5.9

24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A  ;

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A l

l l

1 i

i

i' '

June 6,1995 NFM 95-158 l .

Page 2 of 3 REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: March 1,1996*
3. Scheduled date for restart following refueling: April 27,1996*
4. Will refueling or resumption of operation th;ereafter require a Technical Specification change or other license amendment?

Yes.

a. License amendment to reflect the new electrical distribution system configuration.

l l b. An amendment and exemption to allow the use of four lead fuel assemblies with l advance cladding material.

l l S. Scheduled date(s) for submitting proposed licensing action and supporting information.

l a. July 1995

b. June 1995 l

l 6. Important licensing considerations associated with the refueling.

Physical modifications required to bring Calvert Cliffs in compliance with the Station Blackout rule will be completed in the 1996 Unit I refueling outage.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a)217 (b) 1458 (Note 2)

Spent fuel pools are common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710(Note 1) (b) 0

9. The projected dite of the last refueling that can be discharged to the Spent Fuel Pool assuming the

, present licensed capacity and rmintaining space for one full core off-load.

March 2007 l

NOTE 1: 4710 total licensed site storage capacity.

l (1830 pool + 2880 ISFSI)

NOTE 2: 216 Spent Fuel Assemblies in the ISFSI.

Entry has changed since last reported.

t. .

l l

AVERAGE DAILY UNIT POWER LEVEL coo *********************************************************************

Docket No. 50-318 .

I Calvert Cliffs Unit No. :L June 15, 1995 Prepared by Herman 0. Olsen Telephone:-(410);260-6734 i MAY 1995 Average Daily. Power Level- Average Daily Power Level Day (MWe-Net) Day- (MWe-Net) 1 -7 17 28 I 2 -7 18 326 l

3 -7 19 705 1 4 -8 20 733 1

5 -5 21 826 6 -8 22 816-7 -8 23 '831 8 -8 24 435 9 -7 25 .-29 10 -8 26 27 11 -8 27 149' 12 -12 28 813-13 -29 29 844 14 -28 30 852 15 -29 16 -32 I

)

l 1

l

._. _.-... .~.,_ - . - . - - ~ . -- _ . - . . _ . . . . - . . - . . ~ - _ . . . . _ - . . .

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-3I8 -

UNIT NAME Calvert Cliffs-U2.

DATE June 15.1995 COMPLETED BY Herman O. Olsen TELEPHONE (410) 260-6734 REPORT MONTil May 1995 MEllIOD OF SIlUTUNG LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO 1 NO. DAll! TYPEI (IlOURS) REASON 2 REACTOR3 REPORT # CODE 4 CODES PREVENT RECURRENCE 95004 031895 S 395.9 C 4 N/A N/A N/A The unit uns shutdown for a planned Refueling Outage.

95005 051795 S 2.9 B 9 N/A JJ 12 The unit uns removed from the grid for overspeed testing of the Main Turbine.

95006 052495 F 49.4 B 2 95-005 EC BU l. The reactor was manually tripped due to a partial loss ,

ofcirculating water.

2. A fault in an MCC bus occurred when a loose electrical panel cover fell onto the energized buswork.
3. The panel was repaired. Img-term corrective actions are being evaluated.

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F- Administrative 9 - Other G - Operational Error H - Other

8 '.

June 6,1995 NFM 95-158 Page 3 of 3 REFUELING INFORMATION REOUEST

1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2
2. Scheduled date for next refueling shutdown: March 1,1997*
3. Scheduled date for restart following refueling: April 11,1997*
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No. l S. Scheduled date(s) for submitting proposed licensing action and supporting information.

None.

6. Important licensing considerations associated with the refueling.

None.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1458 (Note 2) i Spent fuel pools are common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710(Note 1) (b) 0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2: 216 Spent Fuel Assemblies in the ISFSI.

Entry has changed since last reported.

)

r ,

t ,.

j ,>

DOCKET NO. 50-318

CALVERT CLIFFS - UNIT 2 '

i i June 15,1995 1

SUMMARY

OF OPERATINO EXPERIENCE i .

i May 1995 l

4 i

The unit began the month in mode 5, cold shutdown, while completing the scheduled refueling outage.

! - The refueling outage ended on 05/17/95 when the unit was paralleled to the grid at i 151. ,

i 1

%e unit was removed from the grid at 2135 for Main Turbine overspeed testing.~ After completion of the l j ~ Mair. Turbine testing the unit was paralleled to the grid at 0029 on 05/18/95.

s .

On ON24/95 the unit was manually tripped from 97% power at 1249 due to a partial loss of circulatmg -

1

. water flow. Five of the circulating water pumps tripped when a loose metal panel fell onto energized  ;

buswork during the planning of maintenance work. He panel was repaired, electrical inspections  ;

3

. performed and the unit was paralleled on 05/26/95 at 1412.

} The unit reached 100% power (840 MWe) at i800 on 05/28/95.

De unit ended the month at 100% power (840 MWe).