Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20084Q919 + (ML20084Q919)
- ML20084Q922 + (ML20084Q922)
- ML20084Q924 + (ML20084Q924)
- ML20084Q926 + (ML20084Q926)
- ML20084Q930 + (ML20084Q930)
- ML20084Q933 + (ML20084Q933)
- ML20084Q934 + (ML20084Q934)
- ML20084Q936 + (ML20084Q936)
- ML20084Q937 + (ML20084Q937)
- ML20084Q940 + (ML20084Q940)
- ML20084Q943 + (ML20084Q943)
- ML20084Q944 + (ML20084Q944)
- ML20084Q946 + (ML20084Q946)
- ML20084Q947 + (ML20084Q947)
- ML20084Q952 + (ML20084Q952)
- ML20084Q954 + (ML20084Q954)
- ML20084Q956 + (ML20084Q956)
- ML20084Q959 + (ML20084Q959)
- ML20084Q961 + (ML20084Q961)
- ML20084Q962 + (ML20084Q962)
- ML20084Q964 + (ML20084Q964)
- ML20084Q965 + (ML20084Q965)
- ML20084Q970 + (ML20084Q970)
- ML20084Q973 + (ML20084Q973)
- ML20084Q977 + (ML20084Q977)
- ML20084Q981 + (ML20084Q981)
- ML20084Q985 + (ML20084Q985)
- ML20084Q987 + (ML20084Q987)
- ML20084R011 + (ML20084R011)
- ML20084R017 + (ML20084R017)
- ML20084R021 + (ML20084R021)
- L-84-111, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/84-10 & 50-251/84-10.Corrective Actions Withheld (Ref 10CFR73.21 & 2.790) + (ML20084R034)
- ML20084R039 + (ML20084R039)
- ML20084R046 + (ML20084R046)
- ML20084R050 + (ML20084R050)
- TXX-4123, Forwards Response to NRC Emergency Preparedness Appraisal Insp Repts 50-445/83-33 & 50-446/83-17,consisting of Schedule for Completing Deficiencies Listed in App a to + (ML20084R063)
- ML20084R066 + (ML20084R066)
- NRC-95-4472, Forwards Draft Deliverables, Assessing Impact of Thermal/ Hydraulic Uncertainty on AP600 PRA Success Criteria & App a, MAAP4 Analysis to Success Criteria of Rev 2 of AP600 PRA + (ML20084R067)
- ML20084R069 + (ML20084R069)
- ML20084R071 + (ML20084R071)
- ML20084R074 + (ML20084R074)
- ML20084R077 + (ML20084R077)
- RBG-17-814, Final Deficiency Rept DR-142 Re Bellows Assembly of Relief Valve Supplied by Crosby Valve & Gage Co.Initially Reported on 840413.Vendor Assured That All Other Valves Supplied Correct.Problem Will Not Occur in Future + (ML20084R078)
- ML20084R081 + (ML20084R081)
- RBG-17-813, Final Deficiency Rept DR-141 Re Bolts in Check Valves Supplied by Velan Engineering.Initially Reported on 840413. Bolts Replaced W/Proper 1 1/2-inch Bolts & Bolt Length for Hanger Brackets Placed on Insp Checklist + (ML20084R082)
- ML20084R084 + (ML20084R084)
- ML20084R089 + (ML20084R089)
- ML20084R090 + (ML20084R090)
- TXX-4171, Forwards Justification for Acceptability of Rigid Mounting Arrangement for Control Room Air Conditioning compressor- Motor Assembly W/Respect to Seismic Qualification,Per 830610 Submittal + (ML20084R091)
- ML20084R092 + (ML20084R092)
- ML20084R093 + (ML20084R093)