TS 3.3-5 6.
One charging pump component cooling water pump or one charging pump service water pump may be out of service provided the pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
7.
One charging pump intermediate seal cooler or other passive component may be out of service provided the system may still operate at 100 percent capacity and repairs are completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
8.
Power may be restored to any valve referenced in Specifications 3.3. A. 8 and 3.3. A.9 ~ for the purpose of valve testing or maintenance l
provided that no more than one valve has power resto. red and provided that testing and maintenance is completed and power remov,ed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
9.
Power may be restored to any valve referenced in Specification 3.3. A.10 l
for the purpose of valve testing or maintenance provided that no more than one valve has power restored and provided that testing or maintenance is completed and power removed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
10.
The total uncollected system leakage for valves, flanges, and pumps located outside containment can exceed the limit shown in Table 4.11-1 provided immediate attentior. is directed to making repairs and system leakage is returned to within limits within 7 days.
- (
Amendment Nos. 95 and 94 Corrected April 1984 840521064PP 840430 PDR ADOCK 05000290 p
\\
TS 3.3-5
(
6.
One charging pump component cooling water pump or one charging pump service water pump may be out of service provided the pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
7.
One charging pump intermediate seal cooler or other passive component may be out of service provided the system may still operate at 100 percent capacity and repairs are completed within t
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
8.
Power may be restored to any valve referenced in Specifications 3.3. A. 8 and 3.3. A.9 for the purpose of valve testing or maintenance l
provided that no more than one valve has power resto. red and provided that testing and maintenance is completed and power remov,ed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
9.
Power may be restored to any valve referenced in 3pecification 3.3. A.10 l
for the purpose of valve testing or maintenance provided that no more than one valve has power restored and provided that testing or maintenance is completed and power removed within'4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
10.
The total uncollected system leakage for valves, flanges. and pumps located outside containment can exceed the limit shown in Table 4.11-1 provided immediate attention is directed to making repairs and syst"m leakage is returned to within limits within 7 days.
4 i
-(
Amendment Nos. 95 and 94 Corrected April