ML20084R074

From kanterella
Jump to navigation Jump to search
Submits Results of Hydraulic Shock Suppressor Insps Performed During Month of Apr.Twenty-eight Bergen Paterson Suppressors Rebuilt & Installed.O Ring Seals Replaced w/ethylene-propylene.Grinnell Shock Suppressors Operable
ML20084R074
Person / Time
Site: Quad Cities, 05000000
Issue date: 05/09/1974
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084R054 List:
References
NJK-74-61, NUDOCS 8306140785
Download: ML20084R074 (1)


Text

- - -

~. m h

Commhalth Edisen O

~

C Ound CiticsGeneratingStation y

p.

6i F,g Post Othce Dox 21G Li/N.

SMg Cordova lilinois 61242 s'C

%I Telephono 309/654-2241 O

{r-V-

f l'

NJK-74-61 k$7,y D

u

'll%. 3

!!ay 9,1974 g

(

tr Ny 1:r. J. P. O' Leary, Director Dircctorate of Licensing U. S. Atomic Energy Conmission Washington, D. C. 20545

SUBJECT:

Inspection of shock suppressors at Quad-Cities Nuclear Power Station Unit 1, DKT 50-254, DPR-29

Dear fir. O' Leary:

The purpose of this letter is to report the results of the hydraulic shock supprcssor inspcetions that were preformed during the month of April 1974 on Quad-Citics Unit 1.

Four Parker-Hannafin, twenty-nine Bergen-Patterson and fourteen-Grinnell shock suppressors were inspected.

The inspection revealed that all the Parker-Hannafin shock suppressors were cperable and their integrity intact. Twenty-cight of the Bergen-Patterson shock suppressors were rebuilt and installed during the present refueline outace. The "O", ring seals were replaccd with cthylenc-propylene scals.

Inspection of these shock suppressors revealed that'they were all operable and sufficient oil levels were observcd. Bergen-Patterson SN F-51035 will be installed and inspected as soon as rcplacccent parts arrive.

The Grinnell shock suppressors were all found to be operable. However, two of these had minor oil leakage around fittings.

These fittings will be tightened to correct this minor leakage.

Grinnell snubber serial numbered 4695 on Unit 2 was also inspected at this time. This shock suppressor was not found to be leaking, and the oil reservoir was full. 1:enthly checks will continue to be made on this suppressor until confidence in its integrity can be obtaincd.

Very truly yours, COLLET.filiLi i EDIS0" CORPANY EUCLMR POUER STATICU

{UAD IT D N c~cNct o -

N.. 'Ka ivianakis F

S on Superintcndent i

NJK/lp

'(

,[ ?