Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079R096 + (ML20079R096)
- ML20079R098 + (ML20079R098)
- ML20079R099 + (ML20079R099)
- ML20079R105 + (ML20079R105)
- ML20079R107 + (ML20079R107)
- ML20079R108 + (ML20079R108)
- ML20079R110 + (ML20079R110)
- 05000255/LER-1983-036-03, /03L-0:on 830515,during Normal Power Operation, Safety Injection Tank (SIT) D Level Reached Tech Spec Limit. Caused by Minor Leakage Past Loop Check Valve & SIT Check Valve or Fill & Drain Valve.Leak Monitored + (ML20079R111)
- 05000389/LER-1983-009-03, /03L-0:on 830514,while in Mode 3,hot Standby, Personnel Airlock Was in Use & Outer Equalizing Valve Did Not Shut.Airlock Declared Inoperable.Caused by Broken Equalizing Valve.Broken Piece Repaired + (ML20079R113)
- ML20079R115 + (ML20079R115)
- ML20079R118 + (ML20079R118)
- ML20079R121 + (ML20079R121)
- NRC-83-0033, Forwards Addl Info Re Environ Qualification of safety- Related Electrical Equipment,In Response to NRC . FSAR Will Be Updated in Next Rev to Include Questions & Responses + (ML20079R123)
- ML20079R126 + (ML20079R126)
- ML20079R129 + (ML20079R129)
- ML20079R130 + (ML20079R130)
- ML20079R133 + (ML20079R133)
- ML20079R134 + (ML20079R134)
- ML20079R140 + (ML20079R140)
- ML20079R142 + (ML20079R142)
- ML20079R149 + (ML20079R149)
- ML20079R159 + (ML20079R159)
- ML20079R163 + (ML20079R163)
- ML20079R164 + (ML20079R164)
- ML20079R165 + (ML20079R165)
- ML20079R169 + (ML20079R169)
- ML20079R175 + (ML20079R175)
- 05000272/LER-1983-067-03, /03L-0:on 831220,minor Leak Developed on Diesel Cooling Water Expansion Tank.Caused by Bushing Wear Allowing Radial Shaft Movement.Leak Repaired,Pump Tested & Declared Operable + (ML20079R176)
- ML20079R177 + (ML20079R177)
- ML20079R182 + (ML20079R182)
- ML20079R195 + (ML20079R195)
- ML20079R196 + (ML20079R196)
- ML20079R203 + (ML20079R203)
- ML20079R206 + (ML20079R206)
- ML20079R208 + (ML20079R208)
- A840071, Final Deficiency Rept Re Agastat Relay Bases Not Tightened to Metal Channels in Power Generation Control Complex Per GE Instructions.Initially Reported on 830811.All Bases Will Be Inspected & Replaced as Needed by 840601 + (ML20079R209)
- ML20079R212 + (ML20079R212)
- ML20079R214 + (ML20079R214)
- ML20079R217 + (ML20079R217)
- ML20079R222 + (ML20079R222)
- ML20079R225 + (ML20079R225)
- ML20079R227 + (ML20079R227)
- ML20079R232 + (ML20079R232)
- 05000317/LER-1983-069-03, /03L-0:on 831221,during Test of Reactor Trip Circuit Breaker (Tcb) Undervoltage (UV) Devices,Response Time of Tcb 2 & 6 UV Trip Devices Found Too Slow.Caused by Setpoint Drift.Uv Devices Replaced + (ML20079R233)
- ML20079R237 + (ML20079R237)
- ML20079R239 + (ML20079R239)
- ML20079R242 + (ML20079R242)
- ML20079R245 + (ML20079R245)
- ML20079R249 + (ML20079R249)
- ML20079R251 + (ML20079R251)
- ML20079R254 + (ML20079R254)