Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-15-880, Interim Deficiency Rept DR-119.Util Will Provide Interim or Final Status Rept by 831018 + (ML20077R233)
- ML20077R237 + (ML20077R237)
- NRC-94-4363, Advises That W Has Reviewed Listed Matls for Proprietary Info.Matls Contain No Such Info + (ML20077R238)
- ML20077R241 + (ML20077R241)
- 05000373/LER-1983-097-03, /03L-0:on 830810,while Performing Surveillance Procedure LIS-RT-03,reactor Water Cleanup Area Temp Module 1E31-N600F Found Inoperable.Caused by Failed Transistor. Module Replaced + (ML20077R242)
- 05000265/LER-1991-007-07, :on 910713,reactor Water Low Level Scram Occurred.Caused by Leaking Feedwater Regulating Valve Creating High Level Conditions.Maint Procedure for Repacking of Valves to Be Revised + (ML20077R246)
- L-83-481, Responds to 830815 Notice of Violation in IE Insp Repts 50-250/83-15 & 50-251/83-15 & Forwards Payment for Proposed Civil Penalty.Nuclear Turbine Operator Logsheets Revised to Upgrade Instructions + (ML20077R256)
- ML20077R266 + (ML20077R266)
- ML20077R270 + (ML20077R270)
- U-602391, Monthly Operating Rept for Dec 1994 for Clinton Power Station,Unit 1 + (ML20077R273)
- 3F0195-04, Monthly Operating Rept for Dec 1994 for Crystal River Unit 3 + (ML20077R276)
- 05000353/LER-1991-013-02, :on 910717,condition Prohibiting Tech Specs Where Surveillance Requirement Not Met & Primary Containment Integrity Not Verified.Caused by Personnel Error.Procedures Revised + (ML20077R279)
- 05000298/LER-1994-012, :on 940708,TS Noncompliance for HPCI Sys Noted Re Setpoint Discrepancy Associated W/Low Steam Line Isolation Pressure Switches.Requested TS Change to NRC Establishing Operability Limit for HPCI + (ML20077R280)
- 05000333/LER-1991-009-01, :on 891207,piping Configuration & Support Detail Deviations Noted During Insp of Pipe Supports.Caused by Original Design Error.Pipe Support Modified by Removing One Degree of Restraint on Piping + (ML20077R281)
- 05000333/LER-1991-011, :on on 910617,walkdown of Panel Anchorage & Adjacent Panels Revealed Number of Anchorage Points Not Plug Welded to Existing Embedded Floor Steel.Caused by Original Const Error.Mod to Anchor Panels Initiated + (ML20077R283)
- ML20077R303 + (ML20077R303)
- 05000361/LER-1983-067-01, Routine 6-month Surveillance of Fire Detection Supervisory Circuits Conducted Feb 1983 Did Not Demonstrate Operability of Fire Panel 3L-198.Caused by Inoperable Instrument + (ML20077R304)
- ML20077R305 + (ML20077R305)
- ML20077R310 + (ML20077R310)
- ML20077R312 + (ML20077R312)
- ML20077R316 + (ML20077R316)
- ML20077R323 + (ML20077R323)
- ML20077R325 + (ML20077R325)
- NG-94-0028, Monthly Operating Rept for Dec 1994 for Duane Arnold Energy Ctr + (ML20077R330)
- ML20077R331 + (ML20077R331)
- ML20077R332 + (ML20077R332)
- ML20077R334 + (ML20077R334)
- ML20077R335 + (ML20077R335)
- ML20077R344 + (ML20077R344)
- ML20077R350 + (ML20077R350)
- ML20077R353 + (ML20077R353)
- ML20077R357 + (ML20077R357)
- ML20077R358 + (ML20077R358)
- BSEP-95-0001, Monthly Operating Repts for Dec 1994 for Brunswick Steam Electric Plant + (ML20077R359)
- HL-4767, Monthly Operating Repts for Dec 1994 for Ei Hatch Nuclear Plant + (ML20077R360)
- NRC-95-0012, Monthly Operating Rept for Dec 1994 for Fermi 2 + (ML20077R362)
- ML20077R363 + (ML20077R363)
- ML20077R366 + (ML20077R366)
- ML20077R370 + (ML20077R370)
- ML20077R376 + (ML20077R376)
- ML20077R377 + (ML20077R377)
- ML20077R378 + (ML20077R378)
- PY-CEI-NRR-1900, Monthly Operating Rept for Dec 1994 for PNPP Unit 1 + (ML20077R379)
- ML20077R380 + (ML20077R380)
- ML20077R381 + (ML20077R381)
- ML20077R383 + (ML20077R383)
- ML20077R407 + (ML20077R407)
- ML20077R408 + (ML20077R408)
- ML20077R413 + (ML20077R413)
- ML20077R419 + (ML20077R419)
- ML20077R479 + (ML20077R479)