Final Significant Const Deficiency Rept 55 Re Incorrect Structural Calculations for Holdup & Boric Acid Makeup Tanks.Incorrectly Designed Holdup Tank Supports Deleted. Drawings Issued to Define Revised Supports
ML20077R237
Person / Time
Site: Waterford 
Issue date: 09/06/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0301, W3I83-301, NUDOCS 8309160268
Download: ML20077R237 (2)


Text

.

LOUISIANA 242 OEtAnONOE sis a r POWER & LIGHT P O BOX 6008. NEW ORLEANS LOUISIANA 70174. (504) 366 2345

'i"u?N s*ysY[U u

September 6, 1983 W3I83-0301 Q-3-A35.07.55 3@@ jQjf!

Mr. John T. Collins Regional Administrator, Region IV

~

U. S. Nuclear Regulatory Commission s

611 Ryan Plaza Drive, Suite 1000

@ l 2 1983 Arlington, Texas 76012 3ij -

4

SUBJECT:

Waterford SES Unit No. 3

  • n Docket No. 50-382 Significant Construction Deficiency No. 55

" Hold Up and Boric Acid Make Up Tanks Incorrect Structural Calculations" Final Report

REFERENCE:

Dear Mr. Collins:

In accordance with the requirements 10CFR50.55(e), we are hereby providing two copies of the Fi'al Report of Significant Construction Deficiency No. 55,

" Hold Up and Boric Acid Make Up Tanks Incorrect Structural Calculations".

If you have any questions, please advise.

Very truly ours,

/

M n>

F. J. Drummond Manager, Engineering & Technical Services cc:

1)

Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 2)

Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8309160268 030906

[g-A]

PDR ADOCK 05000382 S

PDR l

~.-

-~

6 FINAL REPORT SIGNIFICANT CONSTRUCTION DEFICIENCY NO. 55 HOLD UP AND BORIC ACID MAKE UP TANKS INCORRECT STRUCTURAL CALCUI).TIONS INTRODUCTION l

l This report is submitted pursuant to 10CFR50.55(e).

It describes errors that have been found in Vendor Stress Reports, which include the scismic support rings and lugs of the hold up and boric acid makeup tanks. This problem is i

considered reportable under the requirements of 10CFR50.55(e). To the best of our knowledge, this problem has not been reported to the Nuclear Regulatory Commission pursuant to 10CFR21.

DESCRIPTION Combustion Engineering informed Ebasco that during the review of the Vendor Stress Reports for the four (4) hold up tanks and for both of the boric acid make-up tanks, the structural calculations were found to be in error. Upon investigation, Ebasco Engineering determined that none of the above mentioned as-built tanks would accommodate the support structure which imposed radial loads on the seismic support rings. Additionally, Ebasco concluded that the structural supports for the hold up tanks were not adequate.

l SAFETY IMPLICATIONS I

Failure of the boric acid make up tanks could reduce the ability of the Chemical and Volume Control System to charge the Reactor Coolant system following a small break LOCA. Therefore, the seismic design deficiency of the boric acid make up tanks could adversely affect the safety of the plant if left uncorrected.

Failure of the hold up tanks has the potential to release significant amounts of radioactive material. This radiological release may increase the previously calculated release for the postulated Waste System Failure documented in FSAR Subsection 15.7.3.2.

Therefore, the seismic design deficiency of the hold up tanks could adversely affect the safety of the plant if left uncorrected.

CORRECTIVE ACTION t

~

Ebasco Engineering issued DCN-AS-404 and 405 to delete the existing incorrectly designed hold-up tank supports.

Drawings LOU 1564-G-892-S04 and G-893-S11.were issued to define the revised supports for the hold-up and boric acid make-up tanks. All correctire action required by the referenced DCN's and drawings has been implemented.

This report is submitted as the Final Report.

.