En tonnessee vww Autroaf ecu owe so< 2000 9xystowsy Tennessee 373/9 January li, 1995 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C.
20555 Gentlemen In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - DECEMBER 1994 MONTHLY OPERATING REPORT Enclosed is the December 1994 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.
f If you have any questions concerning this matter, please call J.
W. Proffitt at (615) 843-6653.
Sincerely, sk.
R. H. Shell Manager SQN Site Licensing Enclosure cc:
See page 2 1000S9 9501200145 941231 PER ADOCK 05000327
,hg '
R PDR
(
9 U.S. Nuclear Regulatory Commission Page 2 January 11, 1995 l
1 cc (Enclosure):
INPO Records Center Institute of Nuclear Power Operations 700 calleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Joseph Santucci, Manager Advanced Reactor Department Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr.
F.
Yost, Director Research Services Utility Data Institute 1200 G Street, NW, Suite 250 Washington, D.C.
20005
i TENNESSEE VALLEY AUTHORITY F
SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO THE NUCLEAR REGULATORY COIMISSION DECEMBER 1994 I
UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 i
l l
UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 i
OPERATIONAL
SUMMARY
DECEMBER 1994 j
+
UNIT 1 8
Unit 1 generated 680,250 megawatthours (MWh) (gross) electrical power during December with a capacity factor of 79.44 percent.
Unit 1 began the month of December in Mode 3 after experiencing a turbine trip / reactor trip on November 29 at 0713 EST.
The Unit I reactor was taken critical on December 5 at 1602 EST and was tied online on December 6 at 1105 EST.
Unit i reached 100 percent reactor power on December 9 at 2050 EST and continued to operate at near 100 percent through the end of December.
UNIT 2 l
Unit 2 generated 873,432 megawatthours (MWh) (gross) electrical power during December with a capacity factor of 102.44 percent.
There were no outages or power reductions of greater than 20 percent during the month of December.
S AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-327 UNIT No.
One DATE:
01-03-95 COMPLETED BY:
T.
J. Hollomon TELEPHONE:
f6151 843-7528 MONTH:
_ DECEMBER 1994 1
l 1
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL Rh1 (MWe-Net)
Rh1 (MWe-Net) l 1
-33 17 1151 2
-30 18 1148 3
-30 19 1147 4
-30 20 1147 5
-33 21 1143 6
P9 22 1151 7
298 23 1152 8
653 24 1155 9
1027 25 1154 10 1144 26 1156 11 1144 27 1153 12 1147 28 1153 13 1149 29 1155 i
14 1150 30 1153 15 1149 31 1156 16 1150 l
. l
b
{
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-328 UNIT No.
Two DATE:
01-03-95 COMPLETED BY:
T.
J. Ho11omon TELEPdONE:
f615) 843-7528 MONTH:
DECEMBER 1994 i
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL Q&X fMWe-Net)
Eh1 (MWe-Net) 1 1151 17 1143 2
1106 18 1143 3
1146 19 1131 4
1118 20 1130 5
1124 21 1139 6
1131 22 1133 7
1132 23 1141 8
1135 24 1140 J
9 1140 25 1143 10
-1138 26 1140 11 1138 27 1139 12 1141 28 1140 13 1143 29 1139 14 1137 30 1142 15 1141 31 1143 16 1145
I i
OPERATING DATA REPORT DOCKET NO.
50-327 DATE 01/03/95 COMPLETED BY T. J. Holl omon TELEPHONE (615) 843-752E-~
OPERATING STATUS l Notes l
1.
Unit Name:
Seavov6h_ Unit One l
l 2.
Reporting Period: __kecember 1994 l
l 3.
Licensed Thermal Power (MWt): 3411.0 l
l 4.
Nameplate Rating (Gross Mde): 1220.6 l
l 5.
Design Electrical Rating (Net MWe): 1148.0 l
l 6.
Maximum Dependable Capacity (Gross MWe): 1151.0 l
l 7.
Maximum Dependable Capacity (Net MWe): 1111.0 l
l 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Givo Reasons:
9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions If Any: __
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744 8.760 118.369
- 12. Number of Hours Reactor Was Critical 632.0 6.021.2 62.050
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 612.9 5.775.8 60.604.3
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (HWH) 1.967.957 6 18.682.243.4 197.575.997
- 17. Gross Electrical Energy Generated (MWH) 680.250 6.348.230 67.050.884
- 18. Net Electrical Energy Generated (MWH) 653.803 6.099.376 64.263.413
- 19. Unit Service Factor 82.4 65.9 51.2
- 20. Unit Availability Factor 82.4 65.9 51.2
- 21. Unit Capacity Factor (Using HDC Net) 79.1 62.7 48.9
- 22. Unit Capacity Factor (Using DER Net) 76.5 60.7 47.3
- 23. Unit Forced Outage Rate 17.6 6.0 36.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: ___
l
L ' >
OPERATING DATA REPORT DOCKET NO.
50-328 DATE 01/05/95 COMPLETED 8V T. J. Hol l omon TELEPHONE (615) 843-7528 OPERATING STATUS INotes l
1.
Unit Name:
Seauovah Unit Two l
l 2.
Reporting Period: December 1994 l
l 3.
Licensed Thermal Power (Wt): 3411.0 l
l l
4.
Nameplate Rating (Gross We): 1220.6 l
l S.
Design Electrical Rating (Net We): 1148.0 l
l 6.
Maximum Dependable Capacity (Gross We): 1146.0 l
l 7.
Maximum Dependable Capacity (Net We): 1106.0 l
l 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net We):
N/A I
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744 8.760 110.329
- 12. Number of Hours Reactor Was Critical 744.0 5.597.5 64.356
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744.0 5.416.2 62.709.7
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.533.659.8 17.764.509.7 197.527.462
- 17. Gross Electrical Energy Generated (HWH) 873.432 6.079.665 67.007.609
- 18. Net Electrical Energy Generated (WH) 845.376 5.835.896 64.114.182
- 19. Unit Service Factor 100.0 61.8 56.8
- 20. Unit Availability Factor 100.0 61.8 56.8
- 21. Unit Capacity Factor (Using MDC Net) 102.7 60.2 52.5
- 22. Unit Capacity Factor (Using DER Net) 99.0 58.0 50.6 l
- 23. Unit Forced Outage Rate 0.0 2.2 35.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
a
e' DOCKET ND:
50-328 UNTT SHJTDOWNS AND POWER REDUCTf0NS UNIT NAME:
Two DATE:
01/03/95-REPORT MONTH: December 1994 COMPLETED BY:T... Ho' lamon.
TELEPHONE:(615) 343-7528 Method of Licensee Cause and Corrective Action to Duration Shutting Down Event System Compgnent No.
Date Type (Hours)
Reason Reactor Report No.
Code #
Code Prevent Recurrence l
2 3
There were no outages or power reductions of greater than 20 percent to report in December.
2 3
4 I: Forced Reason:
Method:
Exhibit G-Instructions F
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
Exhibit I-Same Source I
5 H-Other (Explain)-
DOCKET ND:
50-327' o
LMIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAPE:
One DATE: - ( 1/)3/1P5 REPORT MONTH: December 1994 COMPLETED BY:T..
'40'
' omon -...
. TELEPHONE:(615) 543-7528 Method of Licensee Cause and Corrective Action to Duration Shutting Down Event System Compgnent l
2 3
d No.
'Date Type (Hours)
Reason Reactor Report No.
Code Code Preveat Rec',rrence 5
941201 F
131.1 A
4 327/94014 JJ RJX Recovery from the November 29, 1994, turbine and reactor trip continued until December 5 at 1602 EST when the unit was tied online.
l 2
3 4
I: Forced Reason:
Method:
Exhibit G-Instructions F
I S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage
. NUREG-1022)
(
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5
G-Operational Error (Explain)
Exhibit I-Same H-Other (Explain)
.. -