Monthly Operating Rept for Dec 1994 for PNPP Unit 1
ML20077R379
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/31/1994
From: Neuman G, Stratman R
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1900, NUDOCS 9501200195
Download: ML20077R379 (6)


Text

T

.(

cememon ENERGY PERRY NUCLEAR POWER PLANT Mail Address:

Robert A.Stratman 10 CENTER ROAD RRY, OHIO 44081 PERRY, OHIO 44081 (216) 259-3737 January 13, 1995 PY-CEI/NRR-1900L United States Nuclear Regulatory Commission Document Control Desk Vashington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Gentlemen:

Attached is the December 1994 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Very truly yours, i// s fhdf7?A' v

GMN:sc Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III Director, Office of Resource Management 100093 9501200195 941231 PDR ADOCK 05000440 R

PDR Operating Companies M

l Cleveland Electnc illuminating

~

i Toledo E 0: son

[ j

v 1

i..

f 4

CLEVELAND ELECTRIC ILLUMINATII*G COMPANY PERRY NUCLEAR POWER PLANT December 1, 1994 - December 31, 1994 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER : 50-440 LICENSE NUMBER: NPF-58 i

I e

e

I A

e Table of Contents Average Daily Unit Power Level...................

1 2

Operating Data Report.

Unit Shutdowns and Power Reductions.

3 9

4 AVERAGE DAILY UNIT POWER LEVEL

(

DOCKET NO. 50-440 I

UNIT PERRY ONE l

DATE 1/13/95 l

CONTALT G.M.NEUMAN TELEPHONE (216)280-5815 l

l M00C11 DECEMBER 1994 DAY AVEIL*.CE DAILY POWER IREL DAY AVERAGE DAILY POWER IR EL (MVe-Net)

(MWe-Net) 1 1192 17 895 2

1137 18 941 3

1185 19 919 4

1160 20 903 5

1183 21 887 6

1188 27 886 7

1191 23 959 8

1194 24 966 9

1192 25 966 10 900 26 971 11 899 27 910 12 920 28 906 13 902 29 904

~

14 885 30 989 15 884 31 986 i

16 883 l

l i

i l

l l

f f

1P c

O OPERATING DATA REPORT UNIT:

PERRY ONE DATE:

1/13/95 OPERATING STATUS 1.

Docket:

50-440 2.

Reporting Period: DECEMBER 1994 3.

Utility

Contact:

G.M.NEUMAN 4.

Licensed Thermal Power (MVt):

3579 5.

Nameplate Rating (Gross MVe):

1250 6.

Design Electrical Rating (net MVe):

1191 7.

Maximum Dependable Capacity (Gross MVe):

1225 8.

Maximum Dependable Capacity (Net Hve):

1166 9.

If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

NONE

10. Power Level to Vhich Restricted, IF any (Net MVe): 100%
11. Reasons for Restrictions, IF Any: OPERATING LICENSE This Month Yr-to-Date Cumulative
12. Hours In Reporting Period 744.0 8,760.0 62,412.0
13. Hours Reactor was Critical 744.0 4,399.0 41,930.4
14. Reactor reserve Shutdown Hours 0

0.0 0.0

15. Hours Generator On-Line 744.0 4,152.4 40,288.0
16. Unit Reserve Shutdown Hours 0

0.0 0.0

17. Gross thermal Energy (MVH) 2,285,870 14,115,156*

136,995,906

18. Gross Electrical Energy (MVH) 777,982 4,824,754 47,049,746
19. Net Electrical Energy (MVH) 742,331 4,591,898 44,684,827
20. Unit Service Factor 100.0%

47.4%

64.6%

21. Unit Availability Factor 100.0%

47.4%

64.6%

22. Unit Capacity Factor (using MDC Net) 85.6%

45.0%

62.0%

23. Unit Capacity Factor (Using DER Net) 83.8%

44.0%

60.1%

24. Unit Forced Outage Rate 0.0%

1.3%

11.4%

25. Forced Outage Hours 0

56.2 5,195.0

26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NONE

27. If Shutdown at end of Report Period, Estimated Date of Startup:

N/A OThe year-to-date MVH reflects a slight change due to an adjustment to September's monthly MVH.(line #17)

a

[ NIT SHITEDOWNS AND POVER REDUCTIONS REPORT MONTH DECEMBER 1994 DOGEr No. 50-440 UNIT NAME PERRY ONE DATE 1/13/95 CONTACT G.M.NEUMAN TELEPHONE (216)280-5815 NO.

DATE TYPE DURATION REASON ' METHOD LER SYSTEM COMP.

CAUSE & CORRECTIVE ACTION TO PREVENT 1

HOURS 2

3 8

4 5

RECURRENCE 94-06 12/10 S

0 B

5 DEEP SHALLOW ROD EXCHANGE AND SCRAM TIME TESTING.

12/11 F

0 F

5 94-23 ADDITIONAL UNPIAMED SCRAM TIME TEST-ING AND REPIACEMENT OF SCRAM l

SOLENOID PIIHF VALVES

SUMMARY

PERRY UNIT ONE REMAINED ON LINE THROUGH THE MONTH OF-DECEMBER 1994.

1.

F: FORCED 2.

REASON:

3.

METHOD 4.

EXHIBIT G-INSTRUCTIONS S: SCHEDULED A-EQUIPMENT FAILURE (EX?IAIN) 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-ENUAL SCRAM ENIRY SHEETS FOR LICENSEE C-REFUELING 3-Alfr0MATIC SCRAM EVENT REPORT (LER) FIIE D-REGULATORY RESTRICTION 4-CONTINUED (NUREG 1022)

E-OPERATOR TRAINING &

5-REDUCED IDAD LICENSE EXAMINATION 9-CrrHER 5.

EXHIBIT 1-SAME SOURCE F-ADMINSTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H-0THER (EXPIAIN)

-