i.
Gerald R. Rainey Vice President Peach Bottom Atomic Power Strtion e
A v
PECO ENERGY-gg g,--
Delta. PA 17314-9739 -
717 456 7014 -
January 13,1995 -
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen Enclosed are twelve copies d the montNy operating report for Peach Bottom Units 2 and 3 for the month of December 1994 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revisior t Sincerely, Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station GRR/
/G kh$d enclosures cc:
R.A. Burricelli, Public Service Electric & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector RC. Schwemm, Atlantic Electric A.F. Kirby, lil, Delmarva Power & Ught INPO Records Center 100084 con 95-14002
- 9501200149 941231
(
PDR-ADOCK 05000277 I
i
PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
DECEMBER 1994 UNIT 2 Unit 2 began the month of December at the rerated 100% nominal power and operated at that level for the entire month of December.
l l
Unit 2 total Net Generation for 1r&4 was 7.451.151 MW.
UNIT 3 i
Unit 3 began the month of December at nominal 100% power. The Unit operated at that power level unti the December 17th when power was reduced to perform a rod pattem adjustment. The unit was l
retumed to 100% nominal power on the same day and operated at that level unta December 26th l
when power.was reduced to perform a rod pattem adjustment. The unit was retumed to 100%
nominal power later the same day and operated at that level for the remainder of December.
Unit 3 total Net Generation for 1994 was 8.867.849 MW.
l 1
i
Docket No. 50-277
' 3 MontNy Operating Report for December 1994 i
UNIT 2 REFUELING INFORMATION 1.
Name of faclity-Peach Bottom Unit 2 l
4-2.
Scheduled date for next refueling shutdown:
i Reload 11 scheduled for September 20,1996.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 2,1996.
)
4 Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
i N/A j
If answer is yes, what, in general, wHI these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 1
l 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or 3
supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage poc4:
(a) Core - 764 Fuel Assemblies -
(b) Fuel Pool - 2420 Fuel Assemblies,59 Fuel Rods t
i 4
Docket No. 50-277 Attachment to Monthly Operating Report for December 1994
)
~
Page 2 UNIT 2 REFUELING INFORMATION (ContinuM) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed
.torage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming) the present capacity:
September 2002 without full core offload capability.
September 1998 with full core offload capability.
i l
1
Docket No. 50-278 l
Attachment to Monthly Operating Report for December 1994 t
I s
UNIT 3 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for September 11,1995 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 13,1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other.
license amendment?
No i
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A i
l 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
l N/A 1
j 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies,6 Fuel Rods i
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
i The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
1
l Dock:t No. 50-278 Attachment to Monthly Operating 1
Report for December 1994 j
Page 2 a
i UNIT 3 REFUELING INFORMATION (Continued) i 4
l 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the j
present capacity-1 j
September 2003 without full core offload capability.
September 1997 with full core offload capabilty.
]
i i
l j
4 1
\\
{
l 1
J I
l i
i 3
i d
i I
i
)
1 t
1 1
l
)
2 1
-+
. ~.
\\
l AVERAGE DA!LY UNIT PonER LEVEL i
DOCKET No. 50 - 277 1
]
UNIT PEACH BOTTOM UNIT 2 j
DATE JANUARY 9, 1995 l
COMPANY PECO ENERGY COMPANY I
W. J. JEFFREY PERFORMANCE AND RfL!AB!LiTY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 MONTH DECEMBER 1994 DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
~(MWE-NET)
(MWE NET) i 1
1126 17 1126 2
1125 18 1130 i
3 1130 19 1126 j
4 1130 20 1130 5
1126 21 1130 4
6 1134 22 1130 l
r 7
1130 23 1126 8
1122 24 1134 e
9 1134 25 1126 i
10 1130 26 1134 i
11 1130 27 1126 l
12 1130 28 1130 l
13 1130 29 1130 14 1134 30 1122 l
15 1126 31 1130 l
16 1130 l
l l
l l
I l
. _. ~ _ -
I' i
l
+
4 e
i AVERAGE DAILY UNIT POWER LEVEL i
DOCKET No. 50 - 278 UNIT PEACM BOTTOM UNIT 3 P
4 DATE JANUARY 9, 1995
,s COMPANY PECO ENERGY COMPANY
't i
W. J. JEFFREY h
PERFORMANCE AND RELIABILITY SITE ENGINEERING l
PEACH BOTTOM ATONIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 l
i MONTH DECEMBER 1994
.i
]
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWE-NET)
(MWE-NET) l 1
1063 17 933 i
~
1 2
1063 18 1069 3
1068 19 1064 i
3 4
1068 20 1064 5
1068 21 1069 g
6 1068 22 1068 i
7 1072 23 1064 8
1060 24 1064
)
9 1072 25 1068 10 1068 26 1060 11 1063 27 1060 12 1067 25 1069 13 1066 29 1064 14 1062 30 1064 15 1067 31 1060 16 1063 i
~
CPERATING DATA REPORT DOCKET NO. 50 277 DATEJANUARY9y995 COMPLETED BY PECO ENERGY COMPANY l,
W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 OPERATING $TATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES: THERE WERE NO LOAD DROPS l
- 2. REPORTING PERIOD: DECEMBER, 1994 THIS MONTH.
l
- 3. LICENSED THERMAL POWER (MWT):
3458
- 4. NAMEPLATE RATING (GROSS MWE):
1221 L
- 5. DESIGN ELECTRICAL RATING (NET MWE):
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159 l
T. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
Ob l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THRCUGH 7) SINCE LAST REPORT, GIVE REASONS:
THE NEW RERATED VALUE FOR ITEM #5 HAS NOT YET BEEN DETERMINED.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8,760 179,640
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,851.0 113,963.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 744.0 7,783.0 110,003.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,572,063 23,831,390 328,320,Ea3
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 861,000 7,727,900 107,879,390
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 840,017 7,451,654 103,442,456 PAGE 1 0F 2 1
1 l
r
~
I i.
i i
t OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 277 l!.
t DATE JANUARY 9,1995 THIS MONTN YR-TO-DATE CUMULATIVE
- 19. UNIT SERY!CE FACTOR 100.0 88.8 61.2 t
- 20. UNIT AVAILABILITY FACTOR 100.0 88.8 41.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.3 77.8 52.7
- 22. UNIT CAPACITY FACTOR (U$ LNG DER NET) l 106.0 79.9 54.1
- 23. UNIT FORCED OUTAGE RATE
' O. 0 1.5 13.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TTPE, DATE, AND DURATION
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A e
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 I
\\
l PAGE 2 0F 2 l
l l
OPERATING DATA REPORT
{
DOCKET NO. 50 278 -
DATE JANUARY 9, 1995 COMPLETED BY PECO ENERGY COMPANY
......~......................
W. J. JEFFREY PERFORMANCE AND RELIA 81LITY
$1TE ENGINEERING PEACH SCTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNif 3 NOTES: THERE WERE TWO LOAD DROPS
- 2. REPORTING PERIOD: DECEMBER, 1994 GREATER THAN 20% THIS
- 3. LICENSED THERMAL POWER (MWT):
3293 MONTH FOR ROD PATTERN
- 4. NAMEPLATE RATING (GROSS MWE):
1152 ADJUSTMENTS.
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098 l
- 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE): 1035
- 8. IF CHANGES CCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:
l l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
i l
- 10. REASONS FOR RESTRICTIONS, IF ANY:
4
\\
l i
i l
THIS MONTH YR TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8,760 175,536
- 12. NUMBER OF NOURS REACTOR WAS CRITICAL 744.0 8,588.0 113,259.4 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 00
- 14. HOURS GENERATOR ON-LINE 744.0 8,588.0 109,879.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 u.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,438,916 27,800,466 326,573,943
'1
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 810,300 9,155,900 107,146,032
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 789,630 8,867,352 102,841,359 PAGE 1 0F 2 1
(
l i
t
I i -
l 4
j '
i i -
(
OPERATING DATA REPORT (CONTINUED)
DOCKET No. 50 - 278 l
l r
DATE JANUARY 9, 1995 THIS MONTN YR TO DATE CUMULATIVE l
l
- 19. Lni!T SERV!CE FACTOR 100.0 98.0 62.6
- 20. UNIT AVAILABILITY FACTOR 100.0 98.0 62.6
- 21. UNIT CAPACITY FACTOR (USING ICC NET) 102.5 97.8-56.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.7 95.0 55.0
- 23. UNIT FORCED OUTAGE RATE bb 2b k6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TTPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, EST! MATED DATE OF STARTUP: 11/14/95
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 f
l l
PAGE 2 CF 2 l
t
4 l
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 l
DATE JANUARY 9, 1995 REPORT MONTH DECEMBER, 1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY 3
PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT 4027 l
l METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 9
l NONE I
t l
(1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS i
S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE l
C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER) j D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG 0161) l E - OPERATOR TRAINING + LICENSE EXAMINATION l
F ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE l
l
I 9
l l
l i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE JANUARY 9, 1995 REPORT MONTH DECEMBER, 1994 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWCR STATION TELEPHONE (717) 456-7014 EXT. 4027 l
l METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO L
l NO.
DATE (1)l (HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURR
..............................................................................................ENCE 21 941217 S
17.0 8
4 RC CONROD ROD PATTERN ADJUSTMENT 22 941226 S
2.0 8
4 RC CONR00 ROD PATTERN ADJUSTMENT 19 0 l
I (1)
(2)
(3)
(4)
F. FORCED REASON METHOD EXHIBIT G. INSTRUCTIONS S - SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN)
T. MANUAL FOR PREPARATION OF DATA i
B - MAINTENANCE OR TEST 2. MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3. AUTOMATIC SCRAM.
EVENT REPORT (LER) l 0. REGULATORY RESTRICT 10N 4. OTHER (EXPLAIN)
FILE (NUREG 0161)
E. OPERATOR TRAINING + LICENSE EKAMINAfl0N l
F. ADMINISTRATIVE
-(5) l G. OPERATIONAL ERROR (EXPLAIN)
H. OTHER(EXPLAIN)
EXHIBIT !. SAME SOURCE I
I l
--