- italR l';l DUKEPOWER August 15, 1991 U.
S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.
C.
20555
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Steam Generator Tube Rupture Hal B.
Tucker's letter dated August 20, 1990 committed Duke Power to complete demonstration runs to verify the response times assumed in WCAP-10698, "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill."
Duke Power committed to evaluate at least 80% ?f the licensed operators.
These demonstration r' ins were scheduled to be completed by August 30, 1991.
The demonstration runs were completed as scheduled,
- however, operator responses were not timed correctly.
Since the recorded operator response times were not valid, the assumed response times in WCAP-10698 could not be verified.
The demonstration runs have been rescheduled, and will be completed by December 13, 1991.
Very truly yours, g
4Cd%m M.
S.
Tuckman MHH/SGTR xc:
S.
D.
Ebneter Regional Administrator, Region II R.
E.
Martin, ONRR Mr. W. T.
Orders Senior Resident Inspecter k
l s
9108220257 910815 PDR ADOCK 05000413 p
i n c
P PDR l
l V
___ _ _ _ _ _ _ _ _ _ _ _ -