Informs That Demonstration Runs to Verify Operator Responses to Steam Generator Tube Rupture Rescheduled & Will Be Completed by 911213
ML20077R305
Person / Time
Site: Catawba  
Issue date: 08/15/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9108220257
Download: ML20077R305 (1)


Text

Il I

$hikr' lhd!

  • i Cid11]'ain

\\{ % ll ! [ L' t >

h t]t lt at l'Yor$lli f::'!* $0* l [

l i' t-l t > ?

?*

l'n IM te >i h irur 0;-r w e m Cl ; riot!* Y C X il im,

  • italR l';l DUKEPOWER August 15, 1991 U.

S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.

C.

20555

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Steam Generator Tube Rupture Hal B.

Tucker's letter dated August 20, 1990 committed Duke Power to complete demonstration runs to verify the response times assumed in WCAP-10698, "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill."

Duke Power committed to evaluate at least 80% ?f the licensed operators.

These demonstration r' ins were scheduled to be completed by August 30, 1991.

The demonstration runs were completed as scheduled,

however, operator responses were not timed correctly.

Since the recorded operator response times were not valid, the assumed response times in WCAP-10698 could not be verified.

The demonstration runs have been rescheduled, and will be completed by December 13, 1991.

Very truly yours, g

4Cd%m M.

S.

Tuckman MHH/SGTR xc:

S.

D.

Ebneter Regional Administrator, Region II R.

E.

Martin, ONRR Mr. W. T.

Orders Senior Resident Inspecter k

l s

9108220257 910815 PDR ADOCK 05000413 p

i n c

P PDR l

l V

___ _ _ _ _ _ _ _ _ _ _ _ -