Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077A448 + (ML20077A448)
- NG-94-4104, Provides Clarification to Statement in Safety Evaluation Contained in 940630 Request for OL Amend (RTS-257) Re Addition of Control Bldg Chiller Operability & Surveillance Requirements + (ML20077A453)
- 05000280/LER-1983-027-03, /03L-0:on 830615,intermediate Range High Flux Trip Setpoint Found Nonconservative During Review of Cycle 7 & Cycle 8 Data.Caused by Improper Assessment of Effect of New Core Design on Instrumentation + (ML20077A454)
- RBG-34939, Forwards EA-PT-91-0003-M, River Bend Station Plant Transient Analysis Methodology, for Review & Approval + (ML20077A455)
- ML20077A457 + (ML20077A457)
- L-83-384, Responds to NRC Re Violations Noted in IE Insp Rept 50-389/83-38.Corrective Actions:Insp Performed on All Completed Fire Barriers & Process Sheets Revised to Indicate Holdpoint + (ML20077A460)
- ML20077A461 + (ML20077A461)
- ML20077A463 + (ML20077A463)
- L-83-373, Ack Receipt of IE Insp Rept 50-389/83-38.No Proprietary Info.Corrective Actions:Routing & Processing of Procedures Reorganized & Personnel Instruction Completed as of 830617 + (ML20077A466)
- ML20077A468 + (ML20077A468)
- ML20077A472 + (ML20077A472)
- ML20077A479 + (ML20077A479)
- ST-HL-AE-4938, Confirms Discussion Re Time for Response to Demand for Info Re Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Response Extended for Addl 30 Days + (ML20077A484)
- ML20077A485 + (ML20077A485)
- 05000348/LER-1983-035-03, /03L-0:on 830610,vacuum Pump Tripped & Containment Atmosphere Activity Particulate Monitor R-11 & Gaseous Monitor R-12 Declared Inoperable.Caused by Failure of Inboard Pump During Maint on Outboard Pump + (ML20077A486)
- ML20077A495 + (ML20077A495)
- PY-CEI-NRR-1885, Informs That Util Will Revise Perry Administrative Procedure (PAP) PAP-0205 by 950115 to Remove Requirement of Separation by Time & Distance for Independent Verifications,Revising Commitment for Independent Verification + (ML20077A503)
- 05000272/LER-1983-029-03, /03L-0:on 830617,control Room Operator Discovered Three RPI Channels Indicating Greater than Max Allowed Deviation in Tech Specs.Caused by Calibr Drift in Two Channels.Channels Recalibr + (ML20077A507)
- ML20077A508 + (ML20077A508)
- ML20077A512 + (ML20077A512)
- ML20077A513 + (ML20077A513)
- ML20077A514 + (ML20077A514)
- ML20077A518 + (ML20077A518)
- ML20077A521 + (ML20077A521)
- ML20077A526 + (ML20077A526)
- ML20077A528 + (ML20077A528)
- ML20077A533 + (ML20077A533)
- ML20077A537 + (ML20077A537)
- ML20077A539 + (ML20077A539)
- ML20077A543 + (ML20077A543)
- ML20077A544 + (ML20077A544)
- NRC-94-0088, Monthly Operating Rept for Oct 1994 for Fermi 2 + (ML20077A546)
- ML20077A550 + (ML20077A550)
- ML20077A553 + (ML20077A553)
- JPN-94-060, Forwards Siemens Power Corp (SPC) Nonproprietary Repts & Proprietary Rept Re Lead Fuel Assembly Installation During Reload 11/Cycle 12.SPC Proprietary Rept Withheld + (ML20077A555)
- ML20077A556 + (ML20077A556)
- ML20077A559 + (ML20077A559)
- ML20077A560 + (ML20077A560)
- ML20077A563 + (ML20077A563)
- ML20077A568 + (ML20077A568)
- ML20077A570 + (ML20077A570)
- ML20077A579 + (ML20077A579)
- ML20077A581 + (ML20077A581)
- ML20077A582 + (ML20077A582)
- ML20077A586 + (ML20077A586)
- AECM-83-0026, Provides Formal Documentation of Analyses Performed Per SER Section 6.2.8 to Determine Min Design Thickness of Main Steam Line & Feedwater Line Flued Heads.Info Re Design Ability to Maintain Svc Metal Temp Also Encl + (ML20077A589)
- ML20077A599 + (ML20077A599)
- ML20077A602 + (ML20077A602)
- 05000328/LER-1994-008-02, :on 941021,manual Actuation of Reactor Trip Breakers Occurred Due to Failure of Rod Control Demand Step Counter.Caused by Incorrect Step Position Indication on Control Bank a Group 2 Step Counter + (ML20077A603)
- ML20077A604 + (ML20077A604)
- ST-HL-AE-4929, Forwards Relief Request RR-ENG-13 from ASME Section B&PV Code,Section XI Requirements in Order to Defer Permanent Repair of Flaw in STP Unit 2 Rmwst,Per GL 90-05 + (ML20077A605)