Text
.
g.
Douglas R. Gipson Sernor Vcc Pres. dent nacwar G+r,eration Detroit.
r-u e400 no,n caie o,ewn EC-Newport, Mahgan 461f.6 013) Mki 'J49 r
Reg Guide 1.16 November 15, 1994 NRC-94-0088 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for October, 1994 Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for October, 1994. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
If you have any questions, please contact Brian Stone, at (313) 586-5148.
1 Sincerely, sY 1
Enclosure cc:
T. G. Colburn D. R. Hahn i
J. B. Martin H. P. Phillips P. L. Torpey A.
Vegel b
\\\\
9411230317 941031 PDR ADOCK 05000341 R
o OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY B. J. Stone DATE November 15, 1994 TELEPHONE (313) 586-5148 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 i Notes:
(1) Calculated using weight-l 2.
REPORTING PERIOD: October, 1994 l ed averages to reflect variations l
3 LICENSED THERMAL POWER (MWt): 3430 l in rating (MDC and DER).
l 4.
NAMEPLATE RATING (GROSS MWe):
1179 I (2) Currently limiting power to i
5.
DESIGN ELECT RATING (Net MWe): 1116 I 93.5% CTP maximum to limit turbine l
6.
MAX DEPENDABLE CAP (GROSS MWe):1135 l component vibration. All ratings l
7 MAX DEPENDABLE CAP (Net HWe):1085 I reflect 98% CTP due to turbine i
l throttle vals
. imitations.
l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
N/A 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net);
(2)
- 10. REASONS FOR RESTRICTION, IF ANY:
(2)
THIS MONTH YH TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 745 7,296 59,366
- 12. HHS REACTOR WAS CRITICAL 0
0 40,545
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
i
- 14. I!OURS GENERATOR ON-LINE O
O 39,124.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 0 0
119,702,687
- 17. GROSS ELECT ENERGY GEN (MWH) 0 0
39,973,95
- 18. NET ELECT ENERGY GEN (MWH) 0 0
38,233,715
- 19. UNIT SERVICE FACTOR 0
0 65.9
- 20. UNIT AVAILABILITY FACTOR 0
0 6E.9
60.0(1) i
- 22. UNIT CAP FACTOR (USING DER NET) 0 0
58.6(1)
- 23. UNIT FORCED OUTAGE RATE 100.0 100.0 18.6
- 24. SifUTDOWNS SCHEDULED OVER NEX" 6 MGNTHS (TYPE, DATE, DURATION OF EACil):
- 25. IF SIIUT DOWN AT END OF REPORT P HIOD, EETIMATED DATE OF STARTUP:
NOVEMBER, 1994
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INI'IAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
T O
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE November 15, 1994 COMPLETED BY R. Pirkle TELEPHONE (313) 586-5027 Honth October, 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(HWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
1 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
b UNIT 5HUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-34 DATE November 15.
1994 UNIT NAME Fermi 2 COMDLETED BV B.
J.
Stone TELEDHONE (313) 580-5148 REPORT WONTH October. 1994 I
i i
i i
l METHOD OF i
i i
i
}
l 1
I i
l l SHUTTING DOWN i LER I SYS l COMD l
CAUSE & CORRECTIVE j
l NO.
? DATE I TvPE ! DUR I REASON l THE REACTOR l
NO.
1 CODE I CODE l ACTION TO PREVENT I
I i
! (1)
I (HRS){
(2) l OR DEDUCING l
I (4) I (5) i RECURRENCE l
l (6)
I l
(7) l l POnER (3)
I l
i l
I i
(8) l l
i I
i i
i I
i i
t i
! 593-06 1 931225 i
F i 745 l
A 1
3 193-014 l TA l TRB
! Reactor tripped following tric of I
l 1
I I
l l
l l
l main turbine.
Turoine tripped cue I
I i
I j
i i
i Ito imbalance caused by loss of 5 8th l l
l l
l l
l l
I l
lstage blades in :o= pressure turbine l l
l l
I i
l i
l Inumber 3.
Ooeration without 7tn and I I
l l
l l
l l
18th stages in all three LP turbines I
l
}
l l
l l
l l
lis planned for upcoming operating l
l l
l 1
l 1
i Icycle.
Operation without stages 7 l
i l
l l
l f
l l
land 8 will prevent recurrence.
l I
I I
i l
i 1
I I
(1) 8: FORCED (2) REASON:
(3) METHOD:
(4) INSTRUCTIONS FOR 5: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)
- MANUAL DREPARATION Or DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(5) SAME SOURCE A5 (4)
(6) R - PREFIX INDICATE 5 POWER REDUCTION.
5-PREFIX INDICATES PLANT SHUTDOWN.
(7) DURATION OF REDUCTIONS REPORTED A5 ZERO PER REG.
GUIDE 1.16 REV. 4 (8) Outage hours are a continuation of the outage
=hich began on 12/25/93.
,