Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-3568, Comments Supporting Proposed Rule 10CFR50 Incorporating 1986 -1988 Addenda & 1989 Editions of ASME Boiler & Pressure Vessel Code,Section Iii,Div 1 & Section Xi,Div 1,by Ref Into 10CFR50.55a + (ML20073B115)
- ML20073B122 + (ML20073B122)
- ML20073B123 + (ML20073B123)
- ML20073B125 + (ML20073B125)
- ML20073B169 + (ML20073B169)
- ML20073B176 + (ML20073B176)
- U-602345, Monthly Operating Rept for Aug 1994 for Clinton Power Station + (ML20073B187)
- ML20073B194 + (ML20073B194)
- NLS9100241, Comment on NRC Proposed Amend to 10CFR50.55a Re Codes & Stds for Nuclear Power Plants.Suggests That Listed Comment Be Added to Proposed Rule to Clarify & Aid Licensees in Implementation of Rule + (ML20073B196)
- ML20073B202 + (ML20073B202)
- ML20073B207 + (ML20073B207)
- 05000443/LER-1994-011, :on 940621,contractor Mechanic Entered High Radiation Area W/O Possessing Alarming Dosimetry.Caused by Failure to Implement Self Checking.Radiation Worker Training Will Be Revised + (ML20073B219)
- RBG-40868, LAR 94-10 to License NPF-47,changing TS 3/4.2.2, APRM Setpoints in Order to Be Able to Operate Greater than 35% Rtp,Per Condition Identified During Review of GL 94-02 + (ML20073B227)
- ML20073B238 + (ML20073B238)
- ML20073B243 + (ML20073B243)
- ML20073B259 + (ML20073B259)
- 05000382/LER-1994-011-01, :on 940720,addition of Improper Blend of Makeup Water to VCT Caused RCS Temp to Rise & Reactor Power to Increased.Caused by Personnel Error.Personnel Involved in Event Counseled + (ML20073B261)
- 05000266/LER-1994-008, :on 940812,discovered That Containment Integrity Requirements Not Satisfied During Valve Testing. Root Cause Evaluation Initiated & Procedures IT-40,IT-40A, IT-45 & IT-45A Revised + (ML20073B273)
- ML20073B278 + (ML20073B278)
- ML20073B284 + (ML20073B284)
- ML20073B289 + (ML20073B289)
- ML20073B295 + (ML20073B295)
- ML20073B296 + (ML20073B296)
- ML20073B307 + (ML20073B307)
- ML20073B309 + (ML20073B309)
- ML20073B321 + (ML20073B321)
- ML20073B323 + (ML20073B323)
- ML20073B333 + (ML20073B333)
- ML20073B338 + (ML20073B338)
- ML20073B340 + (ML20073B340)
- ML20073B345 + (ML20073B345)
- ML20073B346 + (ML20073B346)
- ML20073B350 + (ML20073B350)
- ML20073B354 + (ML20073B354)
- ML20073B355 + (ML20073B355)
- ML20073B358 + (ML20073B358)
- ML20073B359 + (ML20073B359)
- ML20073B363 + (ML20073B363)
- ELV-02741, Responds to Violations Noted in Insp Repts 50-424/91-04 & 50-425/91-04 on 910218-22.Corrective Actions:Historical Review of Plant Management Info Sys Database Conducted & Emergency Response Facilities Reemphasized + (ML20073B372)
- ML20073B373 + (ML20073B373)
- ML20073B384 + (ML20073B384)
- B14977, Requests Relief from ASME Code Section XI Requirements to Make Interim Noncode Repairs on Leak in SWS Piping Line 3SWP-150-072-3,consistent W/Gl 90-05 + (ML20073B385)
- ML20073B387 + (ML20073B387)
- ML20073B388 + (ML20073B388)
- B14950, Informs NRC Staff That Commitment Made by Util Associated W/ Mnps Unit 2 to Replace X-182 HX Not Completed as Planned. Discusses Actions Util Taking + (ML20073B391)
- ML20073B394 + (ML20073B394)
- ML20073B395 + (ML20073B395)
- ML20073B397 + (ML20073B397)
- 05000373/LER-1983-020, Forwards LER 83-020/03L-0 + (ML20073B399)
- ML20073B401 + (ML20073B401)
- NRC-94-4229, Forwards Proprietary Rev 0 to MT01-T2R-010, Quick Look Rept AP600 Core Makeup Tank (Cmt) Test Program - Series 100 Matrix Tests. Proprietary Rev 0 to MT01-T2R-010 Rept Withheld (Ref 10CFR2.790) + (ML20073B406)