F 1
~
DPERAtlNS DATA REPORT i
DOCKET NO 50-369 DATE Septesber 15. 1994-OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-3B2-5346
- 1. Unit Name: McGuire 1
- 2. Reporting Fericd: August 1, 1994-August 31,1994
- 3. Licensed Thersal Poser (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
130$i Notes *Naseplate Rating 5; Design Electrical Rating (Net MWe):
1180 (fross MWe) calculated as
- 6. Maxinus Dependable Capacity (Sross MWe):
1171 f450.000 MVA x.90 power i
- 7. Manieue De;endable Capacity (Net MWe):
1129 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Items L eber 3 Through 7) Since Last JURES-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net NWel:
- 10. Reason for Restrictions, If any:
l This Month Yr.-to-Date Cumulative i
- 11. Heurs in Reporting Period 744.0 5831.0 111767.0
- 12. Nusber Of Hours Reactor Was Critical 437.5 4724.6 78745.1
- 13. Reactor Reserve Shutdewn Hours
--0--
--0--
--0--
- 14. Hours Benerator On-Line 436.9 4717.9 77937.4
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
16.-Gross Theraa! Energy Generated (MWH) 1457626 15851026 242575862
- 17. Gross Electrical Energy Generated (MWH) 485104-5376159 83338313
- 18. Net Electrical Energy Benerated (MWH) 461003 514B870 79583020
- 19. Unit Service Factor 58.7 80.9 69.7
- 20. Unit Availability Factor 58.7 80.9 69.7
- 21. Unit Cap aty Fattet (Using MDC Net) 54.9 78.2 62.0
- 22. Unit Capacity Factor (Using DER Net) 52.5 74.B
.60.3
- 23. Unit Forced Outage Rate 0.0 14.6 14.3
- 24. Shutdown Scheduled Dyer Next 6 Months (Type, Date, and Duration of Each):
Currently Refueling
- l I
- 25. If Shut Down At End Of Repert Period. Estinated Date of Star' tup: October 10, 1994
- 26. Units In Test Status (Prior to Coesercial Operation;:
Forecast-Achieved-r INITIAL CRITICALITY INit!AL ELECTRICITY COMMERCIAL CPERATION i
r 9409210179 940915 PDR ADOCK 05000369 R
OPERATINB LATA REPORT DOCKET NO 50-369 UNIT NcBuire 1 DATE Septeeter 15,19%
COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 i
MONTH Accust,19%
~ RA1 AVEPAGE DAILY F0WER LEVEL pfl AVERAGE DAILY F0WER LEVEL (MWe-Net)
(MWe-Net) 1 1080 17 1087 2
1077 10 992 3
1076 19 7
4 1080 20 0
5 1080 21 0
6 1076 22 0
7 1079 23 0
8 1000 24 0
9 1082 25 0
10 10B2 26 0
1082 27 0
12 1004 28 0
13 1084 29-0
' 14 '
1084 30 0
'15 1083 31 0
16 1063
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET-NO. 369-UNIT.NAME nu,ular, 1 DATE vy/1s/w,__.
' REPORT MONTH August 1994 COMPLETED BY x.
a.-w1111ams TELEPHONE trusj-Juz-saeo (1)
{2) g, (4)
(5)
E HOD T
A OF
. LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE' O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E-HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3'
94-8-19 S
307.07 C
1 RC FUELXX END-OF-CYCLE 9 REFUELING OUTAGE P
i (1)
(2)
(3)
(4)
F Forced Reason:-
Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)
.S Scheduled 1-Manual for Preparation of Data-2-Manual fjicram Entry Sneets For Licensee; C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory R9striction 4-Other-(Explain)
File (N W EG-0161))'
E-Operator-Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other.(Explain)
...- ~..
1 1
I DOCKET: 50-369 UNIT: McGuire 1 Date: 09/15/94 i
t t
NARRATIVE
SUMMARY
PONIH: August 1994 i
Md3uire Unit 1 began the month of August operating at 100% full power. 'Ihe unit i
began decreasing power on 08/18/94 at 1704 for erd-of-cycle 9 refueling outage. 'Ihe unit was removed frun service for end-of-cycle 9 refueling outage on 08/19/94 at 0456. 'Ihe unit was in the outage the remainder of the month.
9
?
' I 2 -
. i l
l
' l Prepared by: R. A. Williams Telephone: - (704)-382-5346 i
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire.
Unit 1 2.
Scheduled next refueling shutdown: Currently Refuelina 3.
Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
i If no, has reload design and core configuration been reviewed by l
Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 637 l
8.
Present licensed fuel pool capacity: 1463 i
Size of requested or planned increase:
i 9.
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 i
DUKE POWER COMPANY DATE:
September 15. 1994 Name of
Contact:
R.
A.
Pilliams Phone:
(704)-382-5346 I
5 l
OPERATING DATA REPDRT i
DOCKET NO 50-370 DATE Sgptester 15. 1994 OPEFATING STATUS COMPLETED BY R.A. Willias_s,_
TELEPHONE 704-382-5346
- 1. Unit Name McGuire 2
' 2. Reporting Period: August 1, 1994-August 31,1994
- 3. Licensed thersal Power (MWt):
34!1
- 0. Nameplate Rating (Gross MWeh 1305*
Notes
- Nameplate Rating
- 5. Design Electrical Rating (Net MWel:
1100 (6 toss MWe)~ calculated as I
- 6. Maximes Dependable Capacity (6ross MWeb
!!71 1450.000 MVA x.90' power
-7. Maxieum Dependable Capacity (Net MWeh
!!29 factor per Page iii, S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last NUREB-0020.
7 Report. Give Reasons:
e
- f
- 9. Fower Level To Which Restricted, If Any (Net MWeh
- 10. Reason For Restrictions, If anyt b
This Month Yr.-to-Date Cuaulative
- 11. Hours in Reporting Feriod 744.0 5831.0 92063.0
- 12. Husber Of Hours Reactor Was Critical-744.0 5688.4 71530.4
- 13. Reatter Reserve Shutdown Hours
--0--
- --0--
- 14. Hours Generator On-Line 744.0 5656.1 70562.3
- 15. Unit Reserve Shutdown Hours
--0--
--0--
- 16. Gross Thereal Energy Generated (MWH) 2469538 1926B697 231140624
- 17. Gross Electrical Energy Generated (MWH) 851435 6694984-80733919
- 18. Net Electrical Energy Generated (MWH) 819623 6439302 77404422
'19. Unit Service facter 100.0 97.5
.76.7-
- 20. Unit _ Availability Factor 100.0 97.5 76.7
- 21. Unit Capacity Factor (Using MDC Net) 97.5 97.8 73.6
- 22. Unit Capacity Factor (Using DER Net) 93.3 93.6
.71.3 23.UnitforcedOutageRate 0.0 2.5 6.8
-24. Shutdown Scheduled Over Next 6 Months (Type, Date, 'and Duration of Eachh Refueling - November 24, 1994 - 61 days
.25. If Shut Dean At End Of Report Period. Estiaated Date of Startup:
I
- 26. Units in Test Status (Prior to' Consercial Operatienh Forecast Achieved u
INITIAL CRii!CALITY-INITIALELECTRICITY C09ERCIAL CPERATION J
I k
t OPERATINS DATA REPORT DOCKET ND 50-370 UNIT McGuire 2-DATE September 15. 1994 CDMPLETED BY R.A. Williaes.
TELEPHDNE-704-392-5346 i
_ MONTH Auaust. 1994
_gg AVERASE DAILY POWER LEVEL D
AVERASE DAILY POWER LEVEL E
(MWe-Net)
(NWe-Net) 1 1100 17 1106 2
1099 18 1103 3
1090 19 1100 4
1100 20 1095 5
1100 21 1080 r
6 1096 22 1102 7
1099 23 1103 8-1098 24 1107 9
1102 25 ll09
,.10 1106-26 1107 i
1105 27
!!06
.12 1106 29 1108-
-13
!!06 29 1109 14 1040 30 1106 15 1105 31
!!06
)
I 16 1105 I
l j
UNIT SHUTDOWNS AND POWER-REDUCTIONS
-DOCKET NO..
50-370 UNIT NAME ' rawular, e -
DATE uv/lo/39 REPORT MONTH August 1994 COMPLETED BY x.
a.
williams TELEPHONE tivej-auz-aase (1) 2)
3 (4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O'
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S' 1
'(1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of Data 2-Manual Scram Entry Sneets For Licensee-C-Refueling 3-Automatic Scram Event Report (LER (N W EG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator-Training &. License Examination F-Administrative (5)
G-Operator Errgr (Explain)
Exhibit I - Same Source H-Other (Explain) 4
J l
DOCKET: 50-370 UNIT: McGuire 2 Date: 09/15/94 NARRATIVE
SUMMARY
10NIH: Airy 2st 1994 McGuire Unit 2 began the month of August operating at 100% full power. 'Ihe unit operated at or near 100% full power for the entire month.
Prepanxi by: R. A. Williams Telephone: (704)-382-5346
F 1
i l
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire.
Unit 2 2.
Scheduled next refueling shutdown: November 1994 3.
Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a
[
technical specification change or other licence amendment?
1 If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 112 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be~ accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
September 15, 1994 Name of
Contact:
R.
A.
Williams Phone: