Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
,
. e i
'm j N C:mm:nw:cith Edison 1
.. I f Byron NuclearStation i O 7 4450 North German Church Road I (j' Byron,!!!inois 61010 l September 8, 1994 LTH: BYRON 94-0360 FILE: 2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period August 1 through August 31, 1994.
Sincerely, 4
//_/ -
.ycW6 G. K. Schwartz Station Manager Byron Nuclear Power o ation GKS/RC/rp CC:
J.B. Martin, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nuclear Safety Nuclear Licensing Manager i Nuclear Fuel Services, PWR Plant Support l D.R. Eggett, Station Nuclear Engineering l INPO Records Center G.F. Dick, Jr. - USNRC F. Yost - Utility Data Institute, Inc.
,, ( ,, < g n .^-
g, y 's & V
/
9409210266 940831 PDR ADDCK 05000454 /
p PDR 1 I
/e (9928MM/090894/1)
./
-< +
p
~'
. _ . . , __ ],
J-4
)
i
?
1 f
BYRON NUCLEAR POWER STATION i
.. I UNIT 1 AND UNIT 2
, MONTHLY PERFORMANCE REPORT ._ i COMMONWEALTH EDISON COMPANY NRC DOCKET NO, 050-454 f NRC DOCKET NO.- 050-455 ,
b i
LICENSE NO. NPF-37 LICENSE NO.'NPF-66 ;
e k
i i
n
-k i
i e
i, m
'l j l
(9928MM/090894/2)
I
. I _. Monthly Report for Byron UNIT 1 for the month of August 1994 )
A. Summarv of Ooeratina Experience for Unit 1 The Unit began this reporting period in Mode 1 (Power Operations).
The power level varied due to BIR06 Coastdown.
A l
(9928MM/090894/3) I i
r
.. B.* OPERATING DATA REPORT ,
DOCKET WO.. 050-454
, UNIT: Byron One !
DATE: 09/08/94 ,
COMPILED BY: R. Colglazier ?
TELEPHONE: (815)234-5441 !
x2282
-OPERATING STATUS
- 1. Reporting Period: ' August, 1994. Gross Hours: 744 ,
i
- 2. Currently Authorized Power Level: 341" 'MWt)
Design Electrical Rating: 1175 (MWe ... is) ;
Design Electrical Rating: 1120 (MWe-ut:,
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any) : None
- 4. Reasons for Restriction (If Any). N/A THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 5,831 78,528 t
- 6. Rx Critical Hours 744 5,831 66,641.5
- 7. Rx Reserve Shutdown Hours 0 0 38 r
- 8. Hours Generator on Line 744 5,831 65,963.1
- 9. Unit Reserve Shutdown Hours 0 0 0 <
- 10. Gross Thermal Energy (MWH) 1,431,846 17,981,963 201,043,062
- 11. Gross Elec. Energy (MWH) 481,165 6,161,973 67,980,518
- 12. Net Elec. Energy (MWH) 447,835 5,874,214 64,437,549
- 13. Reactor Service Factor 100 100 84.86
- 14. Reactor Availability Factor 100 100- 84.91
- 15. Unit Service Factor 100 100 84.00 16 Unit Availability Factor 100 100 84.00 ,
- 17. Unit Capacity Factor (MDC net) 54.47 91.17 74.26
- 18. Unit Capacity Factor (DER net) 53.74 89.95 73.26 19 Unit Forced Outage Hrs. 0 0 1,498.2
- 20. Unit Forced Outage Rate 0 0 2.22
- 21. Shutdowns Scheduled Over Next 6 Months: 1 (B1R06) ]
i
-l
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation): None Note - The cumulative numbers do not reflect power generated prior to commercial service.
(9928MM/090894/4)
. . ,.- . . -. .. . . . _ _ - _ m . . .
C. AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO.- -050-454 ,
,I UNIT: Byron'One DATE: 09/08/94'.
-COMPILED BY: R. Colglazier TELEPHONE: .(815)234-5441 x2282 MONTH: August, 1994 ,
F 1
DAY AVERAGE DAILY POWER LEVEL f (MWe-Net) ,
- 1. 724 MW 16, 606'MW -l
- 2. 725 MW 17. ~597 MW -i
- 3. 711 MW 18. 588 MW f
4, 701 MW 19. 572 MW .
- 5. 707 MW 20. 578 MW l
- 6. 697 MW 21. 571 MW 7, 685 MW 22. 561 MW t
- 8. 659 MW 23. 549 MW r
9, 664 MW 24, 520 MW' f
10, 660 MW 25. 490 MW l
- 11. 645 MW 26. 494 MW
- 12. 635 MW 27. 490 MW -
- 13. 623 MW 28. 497 MW f i
14, 627 MW 29. 490 MW 15, 612 MW 30. 488 MW y i
i
- 31. 480 MW t
. INSTRUCTIONS: j On.this form list.the average daily unit power level in MWe-Net for each day in' '{
the reporting month. _ Compute to the nearest whole megawatt. These figures [
will be'used to plot a graph for each reporting month.' Note that when maximum ;
dependable capacity is used for the net electrical. rating of the unit there_may. _
be occasions when the daily average power level exceeds the 100% line (or the~ j "
restricted power level line.) In such cases the' average daily unit power output' sheet should be footnoted to explain the apparent anomaly, t
- i i(9928MM/090894/5)
Report Period: August, 1994 UNIT SHUTDOWNS / REDUCTIONS '*
(UNIT 1) **************************
4 No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 4 08/01/94 S 744 H 9 Unit One Continued It's Coastdown to BIR06 Thru the Month of August L
oo*************
0 Summary
UPE . Reason Method System & Comnonent F-Forced A-Equip Failure F-Admin 1-Manual Exhibit.F &'H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-A'ito Scram Preparation of D-Regulatory Restriction 4-Concinued ' Data Entry Sheet E-Operator Training .5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER)-File (NUREG-0161)
(99281@!/090894/6)
. . _ . . . . ._ _ . - . - _. _ . . . . ~ - - . . _ . , . _ _ _ . . . _ , . _ . - _ . . _. . ~ . , - - _ . - ._
4 9
4 E. UNIOUE REPORTING REQUIREMENTS (UNIT 1) for the month of August. 1991 t
1, Safety / Relief valve spe2ations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None
- 2. Licensee generated changes to ODCM. j i
None e
i
- 3. Indications of failed fuel.
No. Fuel Reliability Indicator: FRI - 4.2 E-5 pCi/CC ,
h t
?
D r
1 j
(9928MM/090894/7)
F. LICENSEE EVENT REPORTS (UNIT 1)
The fol' lowing is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, occurring during the reporting period, August 1, 1994 through August 31, 1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licennee Event Report Number Date Title of Occurrence 454: 94-007 07/25/94 1B WR Hot Leg RTD Indication spiked low.
454: 94-008 08/03/94 1/2 CS007A & B Valves Not Stroke Time Tested.
i l
I 1
l ,
(9928MM/090894/8)
. _ _ _ _ _ _ _ _ _i
=
- )
e d
. i I . Monthly Report for Byron UNIT 2 for the month of Aucust 1994 ,
A. Summarv of Oneratiner Experience for Unit 2 The Unit began this reporting period in Mode 1 (Power Operations).
P k
i
?
L o
i 9
k s
(9928MM/090894/9)
a I
. 'l B. ' OPERATING DATA REPORT
. DOCKET NO.. 050-455 UNIT: Byron Two DATE: 09/08/94 ]
COMPILED BY: R. Colglazier.
TELEPHONE: (815)234-5441-x2282 .;
OPERATING STATUS
- 1. Reporting' Period: August, 1994. Gross Hours: 744
- 2. Currently Authorized Power Level: 3411 (MWt)
- Design Electrical Rating: 1175 (MWe-gross) ,
I Design Electrical Rating: 1120 (MWe-net)
Max Dependable capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any) : None
- 4. Reasons for Restriction (If-Any): N/A i
THIS MONTH YR TO DATE CUMULATIVE
- 5. Report Period Hrs, 744 5,831 61,632
- 6. Rx Critical Hours 744 5,831- 53,636.9
- 7. Rx Reserve Shutdown Hours 0 0 0-
- 8. Hours Generator on Line 744 5,831- 53,036.6
- 9. . Unit Reserve Shutdown Hours 0 0 0-
- 10. Gross Thermal Energy (FGm) 2,440,724 19,428,866 155,500,793 -l
- 11. Gross Elec. Energy (F9m) 837,239 6,681,856 52,865,130 ,
- 12. Net Elec. Energy (MWH) 795,396' 6,383,507 50,166,734l 13 Reactor Service Factor 100 100 87.03
- 14. Reactor Availability Factor 100 100 87.03 {
- 15. Unit Service Factor- 100 -100 -06.05 [
16.' Unit Availability Factor -100 100 86.05
- 17. Unit Capacity Factor (MDC net) 96.75 99.07 73.66 18 Unit Capacity Factor (DER net) '95.45 97.75 72.68
- 19. Unit' Forced Outage Hrs.
0 0 -1,343.4 !
- 20. Unit Forced Outage Rate 0 0- 2.47
- 21. Shutdowns Scheduled Over Next 6 Months: .1 (B2R05)
- 22. If Shutdown at End of Report Period, Date of Startup: None
- 23. Units _in Test Status (Prior to Commercial Operation)2 None
-
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
4 l
.(9928MM/090894/10) -l l
-v - w
I 4 1 I
C. AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO.? 050-455 UNIT: Byron Two f DATE: 09/08/94 '
COMPILED BY: R. Colglazier TELEPHONE: .(815)234-5441 i x2282 -j
. MONTH: August, 1994 j
. DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) !
- 1. 1095 MW 16. 1096 MW ,
- 2. 1099 MW 17, 1098 MW
- 3. 1093 MW 18. 1094 MW
- 4. 1098 MW 19. 1094 MW
- 5. 1102 MW 20. 1102 MW ,
?
- 6. 1054 MW 21. 818 MW t
- 7. 1002 MW 22. 1054 MW
- 8. 1067 MW 23, 1100 MW
- 9. ,,
1109 MW 24, 1091 MW
- 10. 1110 MW 25. 1087 MW
- 11. 1109 MW 26. 1093 MW 7
- 12. 1106 MW 27. 1088 MW
- 13. 102p MW 28. 1098 MW
- 14. 1036 MW 29. 916 MW 15, 1102 MW 30, 921 MW
- 31. 1104 MW INSTRUCTIONS .i on this form list the average daily unit power level in MWe-Net for each day in- ,
the reporting month. Compute to the nearest whole megawatt. These figures ,
will be used to plot a graph for each reporting month. Note that when maximum i dependable capacity is used for the net electrical rating of the unit there.may be occasions when the daily average power level exceeds the 100% line (or the i restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
/
(9928MM/090894/11) )
)
~
k /
~
-Report Period: August, 1394 UNIT SHUTDOWNS / REDUCTIONS
(UNIT 2) **************************
_Eo, Date h Hours Reason Method LER Number System Comnonent Cause & Corrective Action To Prevent Recurrence 4 08/21/94 H 5 Reduced Load Per Bulk Power Operations
- TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin ~ 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
(9928MM/090894/12)'
_______ _ - - . ~ . . . . - . . . . . -. . . _ , - - ~ ...--.-- _ .--- _ .,_. . ._ _ . . . ._ _~___ _ ____.__ _ _ _ _ _ _ _ _ _ _ . . _
~ . = . - .. . .
9 t
E UN OUE REPORTING REQUIREMENTS CUNIT 2) for the month of August 1994
- 1. . Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PLANT DESCRIPTION .
DATE ACTUATED ACTUATION CONDITION OF EVENT None ;
.i L
- 2. Licensee generated changes to ODCM.
None i l
- 3. Indications of failed fuel. ;
No. Fuel Reliability Indicator: FRI = 3.4 E-5 pCi/CC 3 f
i i
i 1
1
^
.]
(9928MM/090894/13)
a .g.4- :Js- A y
e F. LICENSEE EVENT REPORTS (UNIT 2) !
1 The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, occurring during the reporting period, ;
-August 1, 1994 through August 31, 1994. This in nation is provided pursuant to the reportable occurrence reporting requirements m set forth in 10CFR 50.73_. ,
Occurrence Licensee Event Report Number Date Title of Occurrence None t
I i
l I
-~(9928MM/090894/14) )