Caliaan Piant .-

. Post O!!,ce &a 620

  • fultan, Mis .cun 6!i251 September 8,1994 Union Etucnue a

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-3067

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT AUGUST.1994 The enclosed Monthly Operating Report for August,1994 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

L k I / .J D. Blosser f ,

1[ Manager. Callaway Plant JDB/DEY/Jk A M/ mi/crd L

! Enclosure l cc: Distribution attached

.' r -

np l

(. b- v-

=

9409230226 940933 /

[DR ADOCK 03 coo 4g3 )

.PDR j

cc distribution for ULNRC-3067 with enclosures Mr. M. J. Farber, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Conunission Region III S01 Warrenville Road Lisle,IL 60532-4351 Mr. L. R. Wharton (2 copics)

Office of Nuc! car Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Senice Commission P.O. Box 360 Jefferson City, MO 65102 ,

h l

l l

i

+

DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I DATE 09-08-94 COMPLETED BY J. B. McInvale TELEPIIONE 314/676-8247.

. PART A OPERATIONS SUMMAR~Y The plant operated at approximately 100% power for the month of August with the following exception:

Power was reduced to 97% briefly for instrument calibrations on 8-15-94.

PART B PORV AND SAFETY VALVE

SUMMARY

None i

l l

1 1

-I

' Page 1 of 4

4 Y

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 09-08-94 ,

COMPLETED BY J. .B. McInvale TELEPHONE 314/676-8247 MONTH: AUGUST 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net)

I 1143 17 1144 2 1141 18 1140 3 1140 19 1140 4 1143 20 1144 5 1133 21 1151 6 1156 22 1148 7 1144 23 1142 8 1135 24 1136 9 1137 25 1133 10 1137 26 1135 11 1136 27 1124 12 1138 28 1135 13 1130 29 1150 14 1149 30 1143 15 1146 31 1145 2

16 1149 l

Page 2 of 4

PART D

- OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 09-08-94 COMPLETED BY J. B. McInvale i TELEPHONE 314/676-8247 t

OPERATING STATUS (TfD) (CUM) -'

1. REPORTINO PERIOD: AUGUST 1994 OROSS IlOURS IN REPORTING PERIOD: 744 5831 84,996.5-2 CURRENTLY AtTrilORIZ.ED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1115 DESIGN Ell:CTRICAL RATINO (MW e-Net): 1171
3. POWER LEVEL TO WillCil RESTRICTED (IF ANY)(MWe-Net):
4. REASONS FOR RESTRICTION (IF ANY):

Tills MONTil YR TO DATE CUMtiATIVE

5. NUMBER OF llOURS REACTOR WAS CRITICAL . 744 5831 74,777.7
6. REACTOR RESERVE SillTFDOWN IIOURS 0 0 0 ,
7. IlOURS GENERATOR ON LINE. 744 5,797.7 73,352.8
8. UNIT RESERVE SilUTDOWN liOURS. 0 0 0
9. GROSS TifERMAL ENERGY GENERATED (MWil)... 2.635,385 20.325,921 247,191,009
10. GROSS ELECTRICAL ENERGY GENERATED (MWll).. 889,686 6,937,297 84,308,420
11. NET ELECTRICAL ENEROY GENERATED (MWil) 848,764 6.622,345 80,186,396
12. REACTOR SERVICE FACTOR. 100.0 100.0 88.0
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 88.0
14. UNIT SERVICE FAC7UR -. 100.0 99.4 86.3
15. UNIT AVAILABILITY FACTOR 100.0 99.4 86.3
16. UNIT CAPACITY FACTOR (Using MDC). 102.3 101.9 84.6 r
17. UNIT CAPACITY FACTOR (Using Design MWe)... 97.4 97.0 80.6 18 UNIT FORCED OUTAGE RATE . 0.0 0.0 2.34
19. SIIUrDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE. DATE, AND DURATION OF EACil): ,
20. IF SlitTF DOWN AT END OF REPORTING PERIOD, ESTIMATE DA12 OF STARTUP: N/A ,

I l

Page 3 of 4 1

1 l

~

~

PART E ,

UNIT SiitrrDOWNS AND POWER REDttTIONS DOCKET NO. 50483 UNIT NAhtE CALLAWAY UNTT I DATE 0948-94 COMPLETED BY J. B. hicInvale TELEPliONE 314'676-3247 REPORT Kf0NUI: AUGUST 1994 AIEDIOD OF TYPE SillTITINO DOWN F: FORCED DURATION Tile REACTOR OR tiOm DATE S: SCIIEDULED (110URS) REASON REDUCING POWER CORRECTIVE /ACTIONSCOMMENTS SUhlMARY REASON METl!OD A: EQUIPMENTFAILURE(EXPLAIN) 1: KfANUAL B: hlAINT.ORTEST 2: MANUALSCRAh!

- C: REFUELING 3: AITTOhtATIC SCRAM D: REGULATORY RESTRICTION 4: OTIIER(EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAhtINAT10N F: ADMINISTRATION 0: OPERATIONALERROR(EXPIALN)

II: OTIIER(EXPLAIN)

Page 4 of 4