Requests Authorization to Proceed W/Listed Remedial Soils Work Activities
ML20073B338
Person / Time
Site: Midland
Issue date: 04/06/1983
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20073B332 List:
References
CSC-6646, NUDOCS 8304120240
Download: ML20073B338 (1)


Text

.

h trn/we~t /

Consumers Power Company 5

M;dland Project: PO Box 1963, Midland, MI 48640.(517) 631-8650 a

April 6,1983 Mr. Jay Harrison Midland Project Section U. S. Nuclear Regulatory CrmniMion Region III 799 Roosevelt Road 4

Glen Ellyn, IL 60137 MIDIAND PIGECT GO 7020 REMEDIAL SOILS WORK AUTHORIZATION File:

0485.16 UFI:

42*05*22*04 Serial: CSC-6646 12*32 We have empleted car review of the 6tv'=nts for the activities listed below.

Based on our review, we concluded that we are ready to start the work:

09u1 155052025 - Drift frcm Pier 9E to Pier 8E r,7,4g_g 3 g 4 g p 155053020 - Excavate Pier 8E i

155054020 - Install and Load Pier 8E f)yDgg7 d' 4>

165052025 - Drift fran Pier 9W to Pier 8W 3

165053020 - Excavate Pier BR

)

r.)C-/4Q_lI[g,.4~

165054020 - Install and Load Pier 8N 102250201 - Modify Beam Connections at Elevation 646'(1) 4 102250203 - Modify Beam Connections at Elevation 659'(2).

102250205 - Modify Beam Connections at Elevation 704'(10) -

According to the NBC/CPCo Work Authorization Procedure, we request authorization for the above a

' ties.

J. B. Miller, Jr.

Site Manager DBM/RW/lrb 8304120240 830407 PDR ADDCK 05000329 A