h trn/we~t /
Consumers Power Company 5
M;dland Project: PO Box 1963, Midland, MI 48640.(517) 631-8650 a
April 6,1983 Mr. Jay Harrison Midland Project Section U. S. Nuclear Regulatory CrmniMion Region III 799 Roosevelt Road 4
Glen Ellyn, IL 60137 MIDIAND PIGECT GO 7020 REMEDIAL SOILS WORK AUTHORIZATION File:
0485.16 UFI:
42*05*22*04 Serial: CSC-6646 12*32 We have empleted car review of the 6tv'=nts for the activities listed below.
Based on our review, we concluded that we are ready to start the work:
09u1 155052025 - Drift frcm Pier 9E to Pier 8E r,7,4g_g 3 g 4 g p 155053020 - Excavate Pier 8E i
155054020 - Install and Load Pier 8E f)yDgg7 d' 4>
165052025 - Drift fran Pier 9W to Pier 8W 3
165053020 - Excavate Pier BR
)
- r.)C-/4Q_lI[g,.4~
165054020 - Install and Load Pier 8N 102250201 - Modify Beam Connections at Elevation 646'(1) 4 102250203 - Modify Beam Connections at Elevation 659'(2).
102250205 - Modify Beam Connections at Elevation 704'(10) -
According to the NBC/CPCo Work Authorization Procedure, we request authorization for the above a
' ties.
J. B. Miller, Jr.
Site Manager DBM/RW/lrb 8304120240 830407 PDR ADDCK 05000329 A
-