Special Rept SR-91-003-00,re 910406 Completion of Inservice Eddy Current Exam of Steam Generator tubing.Follow-up Rept Will Be Submitted by 920406,per Tech Spec 4.4.4.5.b.Total Number of Tubes Plugged in Each Steam Generator Listed
ML20073B323
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/19/1991
From: Mcgaha J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SR-91-003-00, SR-91-3, NUDOCS 9104240132
Download: ML20073B323 (2)


Text

_. _ _ ._. _ _ .

k

. . _ - . Entergy gajgy"auaa= 'ac-

/

Operations - u =+

16 600739 4660 i

, W385-91-Oll6

! A4.05 l QA i

i April 19, 1991 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk

Washington, D.C. 20555

SUBJECT:

Waterford 3 SES l Docket No. 50-382 License No NPF-38 Reporting of Special Report

] ,

Gentlemen:

i i Attached is Special Report Number SR-91-003-00 for Waterford Steam Electric Station Unit 3. This Special Report is sub.mitted per 10CFR50.36(c)(2) and i Technical Specifications 4.4.4.5.b and.6.9.2.

Very truly yours, t.

,. h General Manager Plant Operations JRM/WEF/rk

Attachment i

~

cc: Messrs. R.D. Martin G.L. Florreich J.T. Wheelock - INP0 Records Center E.L.' Blake i D.L. Wigginton

N.S. Reynolds NRC Resident Inspectors Office .

/. .

9104240132-910419 -

,PDR- ADOCK 050003G2 ,

-S PDR a - l1

SPECIAL REPORT SR 91-003 00 Steam Generator Eddy Current Examination 3 (4th Refueling)

Inservice Eddy Current examination of the Steam Generator (SG) tubing was completed at Waterford Steam Electric Station Unit 3 on April 6, 1991. This report is submitted in accordance with Technical Specification (TS) 4.4.4.5.a, which requires reporting the number of tubes plugged in each SG within 15 days of completing Inservice Inspection (ISI) of SG tubes pursuant to TS 6.9.2. A follow up report will be submitted in accordance with TS 4.4.4.5.b by April 6, 1992, w

The total number of tubes which have been plugged in each SG are shown below:

SG #1 SG #2 Manufacturing /Preservice 6 20 Batwing (Preventive Plugging) 149 149 Firct Refueling 0 1 Second Refueling 3 0 Third Refueling 10 9 Fourth Refueling

- Preventive Plugging As A Result of ECT- 4 5

- Batwing Preventive Plugging 111 lis TOTAL 328 340 PLANT CONTACT J.E. Howard, Procurement / Programs Engineering Manager (504) 739-6327

._ - _ ______-___ _ _ ____- _____-__=____ _ _ _ _ _ _ _ - - _ _ _ _ _