Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1991-001-01, :on 910103,fuel Bundle Dropped While Being Lowered Into Core Position.Caused by Reversing of Grapple Assembly Air Lines & Switch Configuration.Configuration Corrected & Refuel Grapples Tested + (ML20067D091)
- ST-HL-AE-3688, Forwards Revised Correspondence Distribution List of Designated Recipients + (ML20067D101)
- ML20067D104 + (ML20067D104)
- ML20067D107 + (ML20067D107)
- ML20067D112 + (ML20067D112)
- ML20067D113 + (ML20067D113)
- ML20067D118 + (ML20067D118)
- ML20067D119 + (ML20067D119)
- ML20067D126 + (ML20067D126)
- ML20067D128 + (ML20067D128)
- ML20067D132 + (ML20067D132)
- ML20067D135 + (ML20067D135)
- HL-4513, Ei Hatch Nuclear Plant Units 1 & 2 Annual Operating Rept 1993 + (ML20067D137)
- ML20067D144 + (ML20067D144)
- ML20067D149 + (ML20067D149)
- ML20067D154 + (ML20067D154)
- ML20067D157 + (ML20067D157)
- ML20067D165 + (ML20067D165)
- 1CAN029108, Suppls Re Mods to Comply w/10CFR50.62 on Reduction from ATWS Events for light-water-cooled Nuclear Power Plants.Discrepancy Noted Re Gamma-metrics Linear Reactor Power Signal Input.Buffer Devices Calibr + (ML20067D170)
- ML20067D172 + (ML20067D172)
- ML20067D175 + (ML20067D175)
- ML20067D178 + (ML20067D178)
- NRC-91-0006, Responds to Violations Noted in Insp Rept 50-341/90-17. Corrective Actions:Procedures Re Tool Control,Matl Accountability & Housekeeping Will Be Revised to Clarify Requirements & Consolidate Responsibilities + (ML20067D179)
- ML20067D180 + (ML20067D180)
- ML20067D184 + (ML20067D184)
- ML20067D186 + (ML20067D186)
- U-602221, Forwards Clinton Power Station Unit 1 Reactor Containment Bldg Integrated Leak Rate Test,Final Rept. ILRT Results Satisfy All Acceptance Criteria & Successful in Confirming Leak Tightness of Containment + (ML20067D197)
- ML20067D201 + (ML20067D201)
- ML20067D205 + (ML20067D205)
- ML20067D207 + (ML20067D207)
- TXX-9405, Forwards GP-R-643-94-001, First Periodic Reactor Containment Bldg Integrated Leakage Rate Test Final Rept, for Comanche Peak Ses Unit 1 + (ML20067D211)
- ML20067D215 + (ML20067D215)
- ML20067D218 + (ML20067D218)
- ML20067D219 + (ML20067D219)
- ML20067D222 + (ML20067D222)
- ML20067D227 + (ML20067D227)
- ML20067D229 + (ML20067D229)
- ML20067D230 + (ML20067D230)
- ML20067D232 + (ML20067D232)
- ML20067D234 + (ML20067D234)
- ML20067D239 + (ML20067D239)
- ML20067D242 + (ML20067D242)
- ML20067D243 + (ML20067D243)
- ML20067D244 + (ML20067D244)
- ML20067D245 + (ML20067D245)
- ML20067D246 + (ML20067D246)
- ML20067D250 + (ML20067D250)
- ML20067D251 + (ML20067D251)
- ML20067D253 + (ML20067D253)
- ML20067D255 + (ML20067D255)
- ML20067D256 + (ML20067D256)