ML20067D256
| ML20067D256 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/07/1982 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20067D249 | List: |
| References | |
| NUDOCS 8212130168 | |
| Download: ML20067D256 (3) | |
Text
.
7590-01 UNITED STATES fiUCLEAR REGULATORY C0itMISSION DOCKET t10. 50-361 SOUTHERN CALIFORNIA EDISON COMPANY, ET AL NOTICE OF ISSUANCE OF AMENEMENT FACILITY OPERATING LICEllSE i;0. PlPF-10 The U. S. Nuclear Regulatory Comission (the Comission) has issued Amenonent No. 11 to Facility Operating License No. flPF-10, issued to Southern California Edison Company, San Diego Gas and Electric Company, The City of Riverside, California and The City of Anaheim, Californio (licensees) for the San Onnf re fluclear Generating Station, Unit 2 (the facility) located in San Diego County, California.
This amendment is effective Decerber 6, 1982.
Anendnent No.11 changes the technical specifications applicable to turbine overspeed protection to allow steam flow in low pressure stern leads in which an inoperative reheat intercept valve is lauted, and to allow imediate return to power in the event of an inadvertant turbine trip.
Issuance of this anendment complies with the standards and requirenents l
of the Atomic Energy Act of 1954, as anended (the Act), and the Comission's i
regulations.
The Comission has made appropriate findings as required by the l.
Act an<l the Conmission's regulations in 10 CFR Chapter I, which are set forth in the license anendnent.
Prior public notice of this anendment was not required since the amendment does not involve a significant hazards consideration.
c3212130168 821207 PDR ADOCK 05000361 P
pop omcep suneu.uc >
onc>
OFFICIAL RECORD COPY usom an-mm
[ Nac ronu ais omeomscu oaa
7590-01 2-The Connission has determined that the issuance of this anendment will not result in any significant environmental impact and that pursuant to 10 CFR 51.5(d)(4) an environnental inpact statenent, or negative declaration and environmental inpact appraisal need not be' prepared in connection with issuance of this am ndment.
For further details with respect to this action, see (1) Southern California Edison Company's letter dated Decenber 3, 1982, (2) Amendment No. 11 to Facility Operating License No. NPF-10, and (3) the Comission's related Safety
- 1. valuation.
These itens are available for public inspection at the Commission's Public Docunent Room,1717 H Street, N. W., Washington, D. C., and the San Cic:: ente Library, 242 Avenida Del Nar, San Clenente, California 92672. A copy of itens (2) and (3) nay be obtained upon reauest addressed to the U. S. Nuclear Regulatory Con.11ssion, Washington, D. C.
20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this Nday of December,1982.
FOR THE NUCLEAR REGULATORY COMMISSION
/s
~
George W. Knighton, Chief Licensing Branch No. 3 i
Division of Licensing g*
s \\ (}hf so
~
DL:
DL:LB#3 DL:LB#3
~~. f.
OFFICE )
f ana
.. - ~
a.*
a a a
aa..
~~
a...
.a.*
aa.
a.n a* a ***
.$..j. U
.a,zo, o,n sunmc >
DATE)
NRC FORM 318 (1040) NRCM 024o OFFIClAL. RECORD COPY usam my-us-=