Monthly Operating Rept for Nov 1982
ML20067D222
Person / Time
Site: FitzPatrick 
Issue date: 12/07/1982
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20067D221 List:
References
NUDOCS 8212130084
Download: ML20067D222 (8)


Text

-

OPERATING DATA REPORT DOCKET NO. _5_0 -13_3._

DATE DECEMBER 1982 COMPLETED BY J. COOK TELEPilONE (315) 342:-3840 OPERATING STATUS Notes

1. Unit Name:

FitgP_atrick

2. Reporting Period:

821101 - 821130

3. Licensed Thermal Power (MWt):

2435 883

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

821 830

6. Maximum Dependable Capacity (Gross MWe):

810

7. Maximum Dependable Capacity (Ne t MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):

NONE

10. Reasons For Restrictions. If Any:

1 This Month Yr.-t o-Dat e Cumulatise

11. Ilours In Reporting Period 720 8016 64393
12. Number Of flours Reactor Was Critical 720 6096.9 45648.1
13. Reactor Reserve Shutdown flours 0

0 0

14. Ilours cenerator On Line 720 5978.1 44421.7
15. Unit Reserve Shutdown flours 0

0 0

16. Gross Thermal Energy Generated (MWil) 1671984 13733400 92134714 17 Gross Electrical Energy Generated (MWil) 561870 4642910 31965390 th. Net Electrical Energy Generated (MWil) 544765 4505005 30409735
19. Unit Sersice Factor 100%

74.6%

69.0%

20. Unit Asailability Factor 100%

74.6%

69.0%

21. Unit Capacity Factor (Using MDC Net) 93.4%

69.4%

62.4%

4 Unit Capacity Factor (Using DER Net t 92.2%

68.5%

57.5%

23. Unit Forced OutaFe Rate 0

6.4%

15.7%

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY i

INITIA L ELECTRICITY COMM ERCIAL OPER ATION DOK O h0hhh PDR

AVER ACE DAILY UNITIOWER LEVEL DOCKEI NO.

- 50-33.3- --

JAFNPP gg,7 DECEMBER 1982 DATE CO. fPLETED By J. COOK __

\\

TELEPilONE (315) 342-3.840 Af 0Nm _N_QVEMBER 10R9 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (A!We-Net)

(A!We Net) 790 780 i7 793 2

788 18 790 793 3

39 793 4

791 20 793 5

780 21 793 6

7.99 22 792 791 23 7

793 790 24 s

795 791 25 9

794 to 791 26 791 27 794 11 793 681 28 12 793 13

_483 29 792 496 14 3n 556 3

15 713 16

SUMMARY

The FitzPatrick plant operated at near full thermal i

power during this reporting period with one p6wer reduction for reactor feed pump seal repair.

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-333 f

UNIT NAM E JAFNPP DATE Decomhar 1982 REPORT MONT11 NOVEMBER 1982 COMPLETED BY - J. Cook TELEPl!ONE (315)342-3840 t a =i e*

e e.

L 7

3 Licensee E v, g.,

Cause & Curreceive y.".

Date i

e5 9

.5

cc Event s?

c-3 Action to -

$E 5

j di j Report =

AC U

Prevent Recurrence 6

9 82111-3 S

0 H

4 N/A HH PUMPXX Reduced power for "B" reactor feed pump seal repair I

I 2

3 4

F: Forced Reason:

Method:

Exlubit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatery Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F,\\dminist rative 5

G Operational Error (Explain)

Exlubit I Same Source Il-Other (Explain) 4 O

o POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE SU12iARY'OF OPERATING EXPERIENCE HOVEMBER, 1982 The unit operated at near full thermal power for this reporting period, with one power reduction on 821113 for "B" reactor feed pump seal repair.

At the end of the reporting period the unit is operating at approximately 792 MWe.

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

NOVEMBER 1982 O ST DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

11/2 01-125 22132 OPS Worn belts Replaced belts 8

Fan-1B 10/6 02-2 16027 VISUAL None Functionally tested - All passed-75 Grinnell repaired leaks, purged, retested, snubbers reinstalled 10/13 02-2 16375 VISUAL Seal leaks Visual inspection 3

Grinnell snubbers 11/8 07 20387 OPS Bad SRM "C"

' Full-in' Replaced relay 7

t Relay 7C-relay R90 11/4 10 18883 VISUAL Worn packing Repacked 6

S-5B 10/17 10 15014 NO MALFUNCTION Removed, tested, reinstalled 16 Mechanical snubbers 10-35-MS-221A 10-3B-MS-153 11/5 10 18752 OPS Leaking air line Replaced air line 8

10-FCV-43 10/27 46 16221 NO MALFUNCTION Disassembled - replaced carbon ESW-1A steel cotter pin with stainless steel 10/27 46 22013 OPS No malfunction. Checked Found impeller clearence to be 3

P-2A S.T.

impeller clearence out of specs. - Reset

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT 9

SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

NOVEMBER 1982 O

T DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

E

'10/29 76 14951 PRE-OP Defective circuit Replaced circuit boards 45 Emergency TESTING boards lights 10/29 93 18943 NO

!!ALFUNCTION Stencilled tanks 3

F.O. storage tanks TK 6A-D 11/5 93 22131 OPS Horn malfunction Replaced horn 4

ECP-B 11/23 76 18955 N/A No malfunction Performed surveillance test 76L 180 Electrical penetrations 11/15 71 11318 N/A No malfunction Removed and replaced penetration 4

Penetration cover for Tech. Services.

X100 11/17 27 14977 N/A No malfunction Hooked up analog signal leads per 4

RM 104A & B ECR 80-16-33 11/18 13 12702 N/A No malfunction Installed cable tags 6

RCIC 11/29 14 12704 N/A No malfunction Installed cable tags 56 Core spray 11/16 88 11267 N/A No malfunction Installed jumpers in RX bldg.

5 CR-2 crane controls for fuel rack tiod F1-78-32

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C NOVEMBER 1982 WORK REQUEST #

CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM H

DT TED COMPONENT #

MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 22247 Defective No response Replaced 11/16 03 UT SDVA OPS scope from scope scope 16 18948 Speed out of Unit drives Adjusted speed 11/22 07 Tip #4 RXA adjustment too slow per IMP 7.26 20 19346 Low drive Drive stalls Increased 11/23 07 Tip #3 RXA torque near core top drive torque 12 20974 Recorder Dut of 11/16 07 X/Y Plot RXA drift calibration Calibrated 16 22114 Trips set Frips come in Set trips per 311/03 07 APRM E OPS low too soon.

IMP 7.6 2-22125 Hand probing Tip D I&C

  • 1
  • d Reset core top Reset as 11/03 07 and bottom required 7

22130 Trips set Upscale trips 11/02 07 APRM B/D OPS early e in t Reset trips per IMP 7.6 6

L se signal 1 Cleaned and 22171 deter failed cable 11/03 07 SRM A OPS downscale installed connector connector 14 19332 Out of Slack cable

  • d 11/19 08 SLK Cable OPS adjustment alarms too

' 4 ed early essure 22118 Excessive Replaced d

11/04 08 Air Comp OPS vibration indicator 4

o n

18825 Defective Recorder Replaced res.

,11/02 17 RR-456B OPS cleaned /

resistor inoperative 15 lubed l

I

[

POWEP. AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C NOVEMBER 1982 E

U DATE SYSTEM HOW DETECTED CO NE T gF C ON ML Ci T

EC R N

H S

19259 Possible dirty Cleaned 11/29 17 RM 50B OPS connectors Unit erratic connectors 12 19330 Blown fuse in Unit will not Replaced fuse, 11/17 17 RIS-431A OPS monitor trip checked relays 4

18954 Instrument Oxy en 11/30 27 02-AZ-101 OPS drift ana yzers don,t Calibrated per ISP-31 4

match 22227 Dirty Recorder will '

Cleaned and 11/15 68 TR-102 OPS printhead not print lubricated 68 21987 Long time since Calibrate Calibrated as 11/01 70 Various OPS last temperature calibration indicators required 66 22056 Loose Spurious Tightened as 11/10 76 Zone 1-S OPS connection alarms required 4

22167 ZH-30 module Supervisory 11/04 76 Zone 5 OPS defective alarm in Replaced module 16

..