i PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691 (at s) eso sooo February 6, 1991 l
Docket No. 50-352 License No. NPF-39 o s U.S. Nuclear Regulatory Commission Attn Document Control Desk Washington. DC 20555
SUBJECT:
Limeribk Generating. Station, Unit 1 Withdrawal of Technical.. Specifications Change Request for a'
Extension'of the.Due:Date for Submitting. Semiannual Radioactive Effluent Release Reports and Related Request for Exemption from-the Requirements of 10CFR50.36a(a)(2).
Gentlemen:
t By' letter dated February.25, 1987, we submitted a. Technical Specifications
-Change Request _ proposing-a change to Technical Specifications (TS) Section 6.9.1'.8 to provide an extension of 30 days to the existing 60 day requirement for-submitting the Semiannual Radioactive Effluent Release Report.to the NRC.
.This submittal'also requested a related exemption from the requirements'of 10CFR50.36a(a)(2) to provide.the sare 30 day extension for' submitting the Semiannual Radioactive Effluent Release Report to the NRC.-
'The-extension ~of the semiannual radioactive luent release reporting requirement.was considered.necessary because of 45 day processing time
' required by;the laboratory performing the effluent sample analyses, As a-resulti submittals of'the report-beyond the required 60, day period.had occurred.
.Since the February 25, 19871 submittal, we'have: ~(1).streamlinedourprocesses for; collecting'the data and preparing.the report. and (2). revised our contract s with the laboratory to include a penalty for. delays in processing the samples.
- We have determined that an extension to the semiannual radioactive' effluent release reporting requirements of the TS and 10CFR50.35a(a)(2) is no' longer-4 necessary because our efforts'have been effective'in that the most recent-reports have been submitted within'the required.60. day period. Therefore, this letter withdraws our. Application for Amendment to Facility Operating License HPF 39 and the.related request for exemption from 10CFR50.36a(a)(2), dated-February 25,,1987 9.102120367.'910206
/,'[
. PDR ADOCK 05000352 j
P PDR
/,_..., 61, r,
w.,
~,,
_... ; y -
'dii' i~
D, 4 s.# SthS. Nuclear / Regulatory Commission _-
February 6,1991-1, Document Control Desk.
-Page-2; i
. i 1 Additionally, the February _25.-1987 submittal. included a check in'the amountiof:$150.00-as required by the existing regulations. We request that this-Efeelbe applied tolfuture NRC review charges.
I
_If you have en9 cuestions or require additional 1information, please contact -
~
us.
Very truly yours, s
- G. - -J.
eck, Manager i
Licensing Section Nuclear. Engineering and Services
. 7 GHS:eas:
cc: l;TET..:: Martin,1 Administrator, Region:1, USNRC.
lT.(J.l Kenny, USNRC: Senior Resident inspector, LGS T. M.-Geruskyi Director, PA Bureau of-Radiological; Protection bec: 0; M. Smith - 52C-7 D";; R; -Helwig : 63C-l'
.GL M.lLeitch - LGS,.200
.J. B -: Cotton t-53A-l '
R. N.4 Charles w 51A-1L
- J._Doering
- ~ LuS, A5-1..
R. lW. ~ Dubie l'
. LGS, AS-1
.id. A. Munt2 LGS, 336 i
3
,R. M.'.Krich/GHSo-52A-5 rG. J. Madsen LGS, SB3 '
Commitoent' Coordinator.- 52A-5
. Bureau.of Radiation: Protection Representative l-DLGS, 334-lCorrespondenceEControl Desk - 618-3:
10AC{
d i '
t
.h i
e r :-
N fb w-
,r w
2-.,
, =,
-e.,
v 4
-