ML20067D186

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1990 for Jm Farley Nuclear Plant Unit 2 & Rev to Nov 1990 Operating Data Rept to Reflect Actual Gross & Net Electrical Energy Generated While Unit Shutdown for Refueling
ML20067D186
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/15/1991
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20067D189 List:
References
NUDOCS 9102120377
Download: ML20067D186 (1)


Text

iisa-

- - - - ~ - - _, - _. _ - _ _ _ _ _. _ _ _, _ _ _ __ _ _ _ _ _ _ _ _ _

Alabama Power Company 40 inverness Center Parkwcy sT Post Othee Box 1295

~

DshinDham Alabama 35201 Telephone 205 068 5581 W. G Hairstor., til Senior Vice " noent AlabamaPower

"" ' oP* - "

l*t 500thern electr< System Janua ry 15, 1991 Docket No. 50~364 l'. S. Nuclear Regulatory Commission ATTN Docut:ent Control Disk Vashington, D. C.

20555 i

Joseph H. Farley Nuclear Plant 1

Unit 2 l

Honthly Operating Data Report Attached is the Neerl er 1990 Honthly Operating Report for Joseph H. Farley Nuclear Plant Unit i,

.s required by Section 6.9.1.10 of the Technical Specifications.

Also included is a revision to the November Unit 2 Operating Data Report which reflects updated actual gross and net (r.egative) electrical energy generated while Unit 2 was shutdown for 7,

refueling. The Unit Capacity Factors have also been updated.

j5 If you have any questions, please advise.

Respectfully submitted, h

dd-(s V.

. Hairaton, III J ARiedb3014 Attachments cc Mr. S. D. 2bneter Hr. S. T. Hoffman Mr. G. F. Maxwell 9102120377 9.10115 7 -a w~w gp

_