ML20067D234

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Nov 1990 for Jm Farley Nuclear Plant Unit 2
ML20067D234
Person / Time
Site: Farley 
Issue date: 11/30/1990
From:
ALABAMA POWER CO.
To:
Shared Package
ML20067D189 List:
References
NUDOCS 9102120412
Download: ML20067D234 (1)


Text

.

OPERATING DATA REPORT

,,,4 DOCKET NO. 50-364 DATE January 8, 1991 COMPLITED BT-D. N. Morey TELEPHONE (205)B99-5156 OPERATING STATUS

.g,

.le Unit Names

-Joseph M. Farley - Unit 2

1) Cumulative data since-2.. Reporting Periods November 1990 7-30-81, date of
3. Licensed Thermal Power (MVt):

2,652 commercial operation.

4. Nameplhte Rating (Gross KVe):

860

5. Design Electrical Rating (Net MVe): 829 6._ Maximum Dependable capacity (Gross HWe):

868.6

7. Maximum Dependable Capacity (Net MVe):

828.2

8. If Chenges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: -N/A
9. Power Level To Which Restricted, If Any (Net HVe):

N/A

.10. Reasons For Restrictions,-If Any -

N/A This Month Yr-to-Date Cumulative

-11. Hours In Reporting Period 720 8,016 81,865

~

-12. Number Of Hours Reactor Was Critical 0.0 6,501 I 70,384.2-

+ 3. Reactor Reserve Shutdovn Hours 0.0 0.0 138.0

14. Hours-Generator On-Line 0.0 6,479.2 69,551.2

~~

15.' Unit' Reserve Shutdown Hours

'0.0 0.0 0.0

16. Gross Thermal Energy Generated (HVH) 0.0-16,947,682 177,203,949
17. Gross Electrical' Energy Generated (MVH) 68 5,539,364 50,205,906

.18. Net-Electrical Energy Generated.(HVH)

-3,728 5,260,120

~55,203,510

19. Unit Service Factor 0.0 80.8 85.0
20. Unit Availability Factor:

0.0 80.8 85.0

21. Unit Capacity _ Factor (Using MDC Net)

N/A 79.2 82.3

'22. Unit Capacity Factor (Using DER Net)

N/A

-79.2 81.3

'a3. Unit Forced _0utage Rate 0.0 1.4 4.2

~

126 lShutdovns. Scheduled Over Next 6 Honths (Type,_Date,-and Du' ration of Each):

N/A

25. If Snut Down At End Of Report Period, Estimated Date of Startup: December 31, 1990 r26. Units In Test Status (Prior to Commercial Operation):

. Forecast Achieved-INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30 9102120412 910115 PDR ADCCK 05000364 R

PDR

- -.