Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063F872 + (ML20063F872)
- ML20063F884 + (ML20063F884)
- ML20063F888 + (ML20063F888)
- ML20063F890 + (ML20063F890)
- ML20063F892 + (ML20063F892)
- ML20063F896 + (ML20063F896)
- ML20063F898 + (ML20063F898)
- ML20063F901 + (ML20063F901)
- ML20063F902 + (ML20063F902)
- ML20063F907 + (ML20063F907)
- ML20063F910 + (ML20063F910)
- ML20063F919 + (ML20063F919)
- ML20063F922 + (ML20063F922)
- ML20063F923 + (ML20063F923)
- ML20063F926 + (ML20063F926)
- ML20063F929 + (ML20063F929)
- ML20063F936 + (ML20063F936)
- 05000328/LER-1994-002, :on 940105,CCP Motor 2B-B Tripped on Timed Overcurrent.Pump Declared Inoperable & Removed from Svc.On 940108,facility Placed in Mode 4 (Hot Shutdown).Ccp 2B-B Disassembled & Rotating Element Replaced + (ML20063F937)
- 05000311/LER-1982-060, Forwards LER 82-060/03L-0.Detailed Event Analysis Encl + (ML20063F941)
- 05000311/LER-1982-060-03, /03L-0:on 820722,level Accumulators 24 & 23 Determined Below Operating Band & Declared Inoperable.Caused by Drift of Level Indications.Sightglass Indications Installed on Both Accumulators + (ML20063F945)
- ML20063F954 + (ML20063F954)
- ML20063F968 + (ML20063F968)
- ML20063F976 + (ML20063F976)
- ML20063F982 + (ML20063F982)
- ML20063G053 + (ML20063G053)
- ML20063G071 + (ML20063G071)
- HL-4497, Responds to NRC 931221 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers & NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Trays & Small Conduits Free from Fire Damage + (ML20063G072)
- ML20063G075 + (ML20063G075)
- ML20063G088 + (ML20063G088)
- ML20063G090 + (ML20063G090)
- ML20063G093 + (ML20063G093)
- BSEP-94-0042, Informs of Rev in Schedule for Completion of Liquid Penetrant Exam of Bsep,Unit 2 Core Spray Sys Sparger Bracket Welds & Seal Weld Application + (ML20063G094)
- ML20063G096 + (ML20063G096)
- ML20063G098 + (ML20063G098)
- ML20063G113 + (ML20063G113)
- AECM-82-349, Requests Postponement of Startup Test 1-C91-SU-13-0, Process Computer Until Appropriate Time Following non-nuclear Heatup But Prior to Exceeding 5% Power.Approval Requested by 820831 + (ML20063G119)
- ML20063G126 + (ML20063G126)
- ML20063G127 + (ML20063G127)
- ML20063G129 + (ML20063G129)
- ML20063G136 + (ML20063G136)
- ML20063G150 + (ML20063G150)
- ML20063G152 + (ML20063G152)
- ML20063G158 + (ML20063G158)
- ML20063G162 + (ML20063G162)
- ML20063G163 + (ML20063G163)
- ML20063G169 + (ML20063G169)
- JAFP-94-0097, Monthly Operating Rept for Jan 1994 for Ja FitzPatrick Nuclear Power Plant + (ML20063G170)
- ML20063G180 + (ML20063G180)
- ML20063G182 + (ML20063G182)
- ML20063G197 + (ML20063G197)
- U-602252, Revised Unit Shutdown & Power Reductions for Dec 1993 + (ML20063G203)