Documents Proposed Mods to Pipe Cleanlines Program Discussed at 820723 Meeting.Program Will Be Subj to Constructor & Util QC Surveillance.Approval Requested
ML20063F936
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/09/1982
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20063F928 List:
References
KMLNRC-82-231, NUDOCS 8208310394
Download: ML20063F936 (2)


Text

,

KANSAS GAS AND ELECTRIC COMPANY GLENN L MOESTER

..a

. u..a m...

August 9, 1982 Mr. W.C. Seidle, Chief b

l 4

Reactor Projects Branch 2 l

U.S. Nuclear Regulatory Commission, j

gl Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

-gj y

KMLNRC 82-231 Re:

Docket No. STN 50-482 Subj : Pipe Cleanliness Program Modifications

Dear Mr. Seidle:

The purpose of this letter is to document the proposed modifications to the Wolf Creek Pipe Cleanliness Program as discussed with you and other Nuclear Regulatory Commission personnel during the July 23, 1982, meeting at the Region IV Offices. The program below will be initiated subsequent to your written approval to proceed.

The first program modification will renove the requirement for a Quality Control (QC) Inspector to be present each time a pipe cap or seal is applied, removed or replaced. The second modification will remove the requirement that all violations of cleanliness requirements found by Construction personnel during the erection process be documented and processed as a Nonconformance Report (NCR).

The Constructor's QC Inspectors will continue to inspect piping at the time of fit-up for cleanliness. Cleanliness violations identified at this point will continue to be documented and processed as an NCR.

Also, the Constructor's QC personnel rill make periodic random inspections of installed piping and of piping being installed to verify that cleanliness is maintained. Cleanliness violations identified during these inspections will also be documented and processed as an NCR.

The position of the Construction cleanliness monitor will be maintained.

The Construction cleanliness monitor and craf tsmen will have the authority to clean pipe prior to and during the erection process. Specifically, if loose or loosely adhering material which can readily be removed by vacuuming, blowing, wiping or brushing is found, the craf tsman may proceed to. lean the pipe without an NCR being initiated. However, if unusual or difficult 8208310394 820820 DR ADOCK 05000482 PDR 201 N. Market - Wichita, Kansas - Mad Address: PO. Box 208 I Wnchita, Kansas 67201 - Telephone-Area Code (316) 261-6451

e' N

Mr. W.C. Seidle KMLt1RC 82-231 August 9, 1982 to remove (by above methods) foreign substances are found, QC personnel will be requested to initiate an NCR and cleaning will be performed in accordance with the engineering disposition of the NCR.

Pipe cleanliness has been and will continue to be an important concern of the Wolf Creek Project.

I am confident that these modifications can be made without jeopardizing our program.

In addition to the Constructor's QC surveillance program, Kansas Gas and Electric Company will continue its surveillance of pipe cleanliness. If these changes reduce program effectiveness, necessary correction action will be taken to maintain pipe cleanliness at acceptable levels.

If you require additional information, please contact me or Mr. Otto Maynard of my staff.

Yours very truly,

/w (gfh GLK:bb cc: Mr. Thomas Vandel Resident NRC Inspector P.O. Box 311 Burlington, Kansas 66839 l