Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062C661 + (ML20062C661)
- 05000339/LER-1982-040, Forwards LER 82-040/03L-0 + (ML20062C662)
- 05000455/LER-1990-007-10, :on 900928,ECCS Throttle Valve Found Closed Due to Procedural Deficiency + (ML20062C663)
- ML20062C664 + (ML20062C664)
- 05000325/LER-1990-018-01, :on 900927,Group 6 Isolation & Standby Gas Treatment Sys Autostart Signal Received as Result of Momentary Loss of Power to Main Stack Radiation Monitor. Caused by Reactor Scram + (ML20062C666)
- ML20062C667 + (ML20062C667)
- ML20062C669 + (ML20062C669)
- ML20062C670 + (ML20062C670)
- 05000325/LER-1990-015-01, :on 900926,incorrect LPRM Assignment Occurred Due to Reversed Cables + (ML20062C672)
- ML20062C676 + (ML20062C676)
- IR 05000358/1982007 + (ML20062C679)
- ML20062C680 + (ML20062C680)
- ML20062C681 + (ML20062C681)
- ML20062C683 + (ML20062C683)
- 05000368/LER-1990-021, :on 900927,discovered That Pressurizer & Steam Generator Low Pressure Variable Setpoint Trips Not Calibr Per Tech Specs.Caused by Procedure Deficiencies.Procedures Will Be Reviewed + (ML20062C684)
- 05000327/LER-1982-089, Forwards LER 82-089/03L-0 + (ML20062C685)
- ML20062C686 + (ML20062C686)
- IR 05000346/1990019 + (ML20062C688)
- ML20062C689 + (ML20062C689)
- ML20062C690 + (ML20062C690)
- 05000339/LER-1982-040-03, /03L-0:on 820704,axial Flux Difference Went Less than 5% from Target Hand for 1 Minute.Caused by Inserting a Rod Control Bank 18 Steps for Rod Operability Periodic Test. Rods Withdrawn & Difference Restored + (ML20062C691)
- ML20062C692 + (ML20062C692)
- 05000254/LER-1990-020-01, :on 900920,determined That Continuous Fire Watches Being Performed Due to Misinterpretation of Meaning of Fire Watch + (ML20062C695)
- ML20062C696 + (ML20062C696)
- ML20062C697 + (ML20062C697)
- ML20062C698 + (ML20062C698)
- ML20062C699 + (ML20062C699)
- ML20062C700 + (ML20062C700)
- ML20062C701 + (ML20062C701)
- 05000327/LER-1982-089-03, /03L-0:on 820703,waste Gas Sys Oxygen Analyzer (0-02A-43-5000) Declared Inoperable Due to Failure to Meet Surveillance Requirements.Caused by Faulty Zero Setpoint in Potentiometer.Potentiometer Replaced + (ML20062C702)
- ML20062C704 + (ML20062C704)
- 05000313/LER-1982-013, Forwards LER 82-013/03L-0 + (ML20062C705)
- ML20062C706 + (ML20062C706)
- ML20062C709 + (ML20062C709)
- ML20062C710 + (ML20062C710)
- 05000272/LER-1982-005, Forwards LER 82-005/01X-1.Detailed Event Analysis Encl + (ML20062C711)
- ML20062C712 + (ML20062C712)
- ML20062C714 + (ML20062C714)
- 05000327/LER-1982-088, Forwards LER 82-088/03L-0 + (ML20062C715)
- 0CAN109013, Provides Status of Actions Committed to in in Response to Generic Ltr 88-14 Re Instrument Air Supply Sys Problems Affecting safety-related Equipment + (ML20062C716)
- ML20062C717 + (ML20062C717)
- 05000309/LER-1982-020-03, /03L-0:on 820622,procedure Change Rept Not Reviewed by Plant Operations Review Committee within 14 Days of Generation.Caused by Rept Being Misplaced.Method of Handling Repts Changed Per 820627 & 29 Meetings + (ML20062C720)
- ML20062C723 + (ML20062C723)
- ML20062C724 + (ML20062C724)
- ML20062C725 + (ML20062C725)
- ML20062C727 + (ML20062C727)
- IR 05000295/1990019 + (ML20062C728)
- 05000313/LER-1982-013-03, /03L-0:on 820628,vent Pipe for Casing of Spent Fuel Cooling Pump P40A Found Leaking.Caused by Fatigue Cracking Due to Normal Pump Vibration.Vent Pipe Replaced. Vibration Study Will Be Performed + (ML20062C729)
- ML20062C730 + (ML20062C730)
- IR 05000302/1978020 + (ML20062C733)
- ML20062C736 + (ML20062C736)