ML20062C730
| ML20062C730 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/05/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML20062C731 | List: |
| References | |
| NUDOCS 7811130409 | |
| Download: ML20062C730 (2) | |
See also: IR 05000302/1978020
Text
i
-.
.
,
s
'
'
e
,c
c to
d
~ ~ -
Q'y'
- pm RIc
I
o
UNITED STATES-
.
o,
NUCLEAR REGULATORY COMMISSION
hO "-b'$
e
['
{
REGloN il
,7 ,
! .i
- * * .
/
g
101 MARIETTA STREET, N.W.
' *
ATLANTA. GEORGIA 30303
'% . ',. . #'
OCT F 1978
"
,
.-
Reply efer To:
"*
RII:HLW
50-302/78 20
.
Florida Power Corporation
ATTN:
Mr. W. P. Stewart, Director
Power Product on
i
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. H. L. Whitener of this
r
office on August 10-11, 1978, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River facility, and to the discussion
.
of our findings held with Mr. G. P. Beatty at the conclusion of the
in spec t i on.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report.
These items will be examined during subsecuent
inspections.
Based on discussions during this inspection, it is our understanding
that you will revise your surveillance procedure to incorporate
specific acceptance criteria and data requirements as delineated in
the enclosed report and will establish written guidelines for the selection
j
of a representative sample of suppressors for functional testing.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a cocy of this letter
and the enclosed inspection report will be placed in the NRC's Public
l
78111306 09-
,
.--
-
.
'
.
9
.
Florida Power Corporation
-2-
OCT 5
1973
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
-
such information f rom public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from
you in this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
,
n
F. J.
h
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No.
50-302/78-20
cc w/ encl:
Mr. G. P. Beatty, J r.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
_