Forwards IE Inspec Rept 50-302/78-20 on 780810-11 During Which No Items of Noncompliance Were Noted
ML20062C730
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/05/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML20062C731 List:
References
NUDOCS 7811130409
Download: ML20062C730 (2)


See also: IR 05000302/1978020

Text

i

-.

.

,

s

'

'

e

,c

c to

d

~ ~ -

Q'y'

  1. pm RIc

I

o

UNITED STATES-

.

o,

NUCLEAR REGULATORY COMMISSION

hO "-b'$

e

['

{

REGloN il

,7 ,

! .i

  • * * .

/

g

101 MARIETTA STREET, N.W.

' *

ATLANTA. GEORGIA 30303

'% . ',. . #'

OCT F 1978

"

,

.-

Reply efer To:

"*

RII:HLW

50-302/78 20

.

Florida Power Corporation

ATTN:

Mr. W. P. Stewart, Director

Power Product on

i

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. H. L. Whitener of this

r

office on August 10-11, 1978, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River facility, and to the discussion

.

of our findings held with Mr. G. P. Beatty at the conclusion of the

in spec t i on.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

Two new unresolved items resulted from this inspection and are discussed

in the enclosed report.

These items will be examined during subsecuent

inspections.

Based on discussions during this inspection, it is our understanding

that you will revise your surveillance procedure to incorporate

specific acceptance criteria and data requirements as delineated in

the enclosed report and will establish written guidelines for the selection

j

of a representative sample of suppressors for functional testing.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a cocy of this letter

and the enclosed inspection report will be placed in the NRC's Public

l

78111306 09-

,

.--

-

.

'

.

9

.

Florida Power Corporation

-2-

OCT 5

1973

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

-

such information f rom public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from

you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

,

n

F. J.

h

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No.

50-302/78-20

cc w/ encl:

Mr. G. P. Beatty, J r.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629