ML20062C690
| ML20062C690 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 11/07/1978 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | James E WISCONSIN PUBLIC SERVICE CORP. |
| References | |
| NUDOCS 7811130141 | |
| Download: ML20062C690 (6) | |
Text
.T6-PDR g# N UNITED STATES g.
p; NUCLEAR REGULATORY COMMISS10fJ
'Yl j
ij REGloN lit 790 ROOSEVELT ROAC
, e j*
GLEN ELLYN. ILLINots 50137
'kh NOV 7 1973 (G
Docket 'No. 50-305
~
Wisconsin ublic Service Corporation ATTN:
Mr. E. W. James Senior Vice President Power Generation and s.
Engineering P. O. Box 1200 Green Bay, WI 54305 Gentlemen:
1
' On November 28, 1978, the U. S. Nuclear Regulatory Commission will conduct a one-day seminar on the new Modal Radiological Effluent O,
Technical Specifications for Nuclear Power Plants. These Technical Specifications are being sent to you separately from NhC Headquarters.
Representatives from the Office of Nuclear Reactor Regulation will make presentations at the seminar. The agenda will include an intro-ducticn and background of the effluent technical specifications, the development of Standard Technical Specifications, the method and schedule for i=plementing the new technical specifications and the major chenges of the new technical specifications. A question.and answer period will follow the prepared presentaticas.
You are invited to send representatives to this seminar to be held at the Holiday Inn, Glen Ellyn, Illinois. We encourage you to send thoso members of your staff most closely involved in your radiologi-cal effluent and radiological environmental conitoring programs.
Please complete the preregistration form (page 2 of the Seminar Infor-mation Sheet) and return it to this office no later than November 17, 1978.
It would be extremely beneficia1 if you would submit (also by November 17) specific questions concerning the topics you would like to hear discussed so that the speakers will be able to provide answers to those questions that apply to the entire audience. We will try to
.k
s.
t Wisconsin Public Service 2 '..
[;O'/
71973-Corporation answer any and all questions pertaining to radiological effluent and radiological environmental monitoring programs; however, if the problem is only specific to your case and not of general interest to the entire audience, our office or the Office of Nuclear Reactor Regulation, as appropriate, will communicate with you directly, rather than at this seminar.
Sincerely, e_k M ~ b -
James G. Kep"pfer Director
?
Enclosur es:
- 1. Seminar Information Sheet
- 2. Proposed Agenda cc w/encls:
Mr. C. Luoma, Plant-Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC s
e a
i -
9
(
i 1
l SEMINAR INFOR2!ATION SHEET Date:
Tuesday, November 28, 1978 Time:
8:30 a.m. - 5:00 p.m.
m bar d Location:
Holiday Inn of Glen Ellyn gg [glp 1250 Roosevelt Road e
Glen Ellyn, IL 60137 Telephone 312/629-6000 poliday I" ^
pro,kosededIU)
- ts A
Sr ba m{
s b
McHL pd t
u b.
i T
s CC W
lbsevelt Rd-og (I cq -30 o
U Taf t As. (
j
.k u
HLC cT 2.:.fm'5-y b,cactA
+Kyf, r qpo s. l { m :le Suggested Motels:
e Four Seasons (a Best Western Motel)
(attendees are to 656 Taft Avenue l
make own Glen Ellyn, IL 60137 rese rvations) 312/469-8500 o
Holiday Inn of Glen Ellyn (address and phone number above)
Transportation:
e Glen Ellyn/ West. Suburban Limousine - See l
Limo Dispatcher located near baggage claim I
area at O' Hare.
Fair approxi=ately $13 l
one way.
Rental Car at O' Hare Airport e
Er.CLuSUh6 1 Page 1 of 2 l
SEMINAR INFOR.MATION SHEET Preregistration Form 1.
Licensee Itep resen t in e (Check as Apolicable) 2.
Nate of Attendee Corporate Of fice Plant (Specity) 3.
Luncheon Arrangements:
There a.re several restaurants within walking distance of the Holiday Inn; however, the Holiday Inn has a nice luncheon buffet for $3.50.
The Holiday Inn has requested that we give them an approximate number of people who might be interested. Please indicate how many of the above attendees might be interested:
Af ter completing Items 1, 2, and 3 return this form by November 17, 1976 to:
U. S. Nuclear Regulatory Commission ATTN:
T. H. Essig 799 Roosevelt Road Glen Ellyn, IL 60137 El.CLCSUht 1 dage 2 of 2
3 PROPOSE 0 AGEf;DA FOR REGIO:AL SEMIiARS 0?
RADIOLOGICAL EFFLUEf1T TECHi!ICAL SPECIFICATI0tlS UtilityRepresentatihes 1.
Introduction and Background A.. Standard Tech Specs B.
Appendix A vs. Appendix 8.
l l
-C.
Implementation of Appropriate Regulations 1.
40 CFR Part 190 II. Schedule for Implementation A.
OL Applications B.
Operating Reactors i
III.. Interfaces with f!RR
~
IV.
Development of Standard Tech Specs A.
flRC Task Force B.
AIF Task iorce 9
C.
Approval.By R*C 0.
Deviations from Standard Tech Specs V.
Method of Implementation 9
A.
Amendment to Operating License i
B.
Amendment to FSAR 3
5 EhCLOSUF.E 2 ra;c 1 cf 2 L
<0 l
l l.
.~..
VI. Major Changes from Present Tech Specs A.
10.CFR Part 50, Appendix I B.
,40 CFR Part 190 C.
Maintenance and Use of Equipment D.
Solidification - Process-Control Program E.
Special Reports (40 CFR Part 141) l
'F.
Environmental Monitoring VII.
Discussion of NUREG-0133
- l i
Vill.
Discussion of Tech Specs A.
LCO
~
~
B.
Action 1
C.
Surveil 1<tnce IX. Question and Answer Period j
i i
i i
EhCLOSuRi 2 Faze 2.cf 2 1
- - t
.. ~..
=
k e
v.
r,
,m..
_,m
,m n.
...m 3-
-