i . .

)

,. l l

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-250 AHO 50-251 l FLORIDA POWER AND LIGHT COMPANY ,

i NOTICE OF ISSUANCE OF AMEN 0MENTS TO FACILITY i OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the Commission) has 4-sned Amendment Nos. 38 and 31 to Facility Operating Licenses Nos. -

nP9-31 and OPR-41, respectively, issued to Florida Power and Light  ;

Connanv which revised Technical Soecifications for operation of the Turkey Point Nuclear Generating Units Nos. 3 and 4, located in Oade County, Florida. The amendments are effective as of the date of issuance.

The amendments change the Technical Specifications for Turkey Point Unit Nos. 3 and 4 in connection with tne refueling of Unit 4 ,

Cycle 5 operation and authorize the operation of Turkey Point Unit C' nos. 3 and 4 with u, to an average of 257. of the tubes in the three

' team generators in each unit in a plugged condition. In addition, the steam generators in Turkey Point Unit 4 have been inspected by FPL -

and recorted on September 6,1978. The steam generators have been

'a"ed satisfactory by the NRC for an additional six equivalent months.

l

,s n a ns i

s

[

The operating limits regarding the steam generators for Unit 4, which were previously governed by NRC Orders for Modifica- i tion of License dated August 3 and 11,1977 and March 8, 1978,  ;

are superseded by this amendment. ,

[

F The requirements of the NRC Order for Modification of Licenses l dated June 7,1978 are satisfied by the licensee's submittal Q

  • ted Aucust 9,1978 and suoplenented on September 13, 1978. f The anamented surveillance procedures in the April 10, 1978 latter from FPL and incorporated in the June 7,1978 order will I nn lonner be reni' ired.  ;

i

.The application for the amendments complies with the standards '

{

i and requirements of the Atomic Energy Act of 1954, as amended  ;

(the Act), and the Commission's rules and regulations. The  ;

Commission has made appropriate findings as required by the I r

('l Act and the Commission's rules and reguitions in 10 CFR Chapter l I, which are set forth in the license amendments. Prior public notice of the steam generator inspection was not required since the amendments do not involve a significant hazards consideration. '

Notice of Proposed Issuance of Amendments to Facility Operating  :

'1-ense in connection with the Unit 4 Cycle 5 reload and the l

X% steam nenerator tube pluoning was published .in the Federal Racister on Aunust 9, 1978 (43 FR 35406). No request for a hearino nr Detition for leave to intervene was filed follcWing notice of the proposed action.

. ,.c .-

b The Comission has determined that the issuance of these amendments will not result in any significant environmental .

impact and that pursuant to 10 CFR 551.5(d)(4) an enviromental impact statement or negative deciaration and envirormental impact appraisal need not be prepared in connection with issuance of these ameneents.

s Ci ' For further details with respect to this action, see (1) the application for amendments dated June 19, 1978 , supplemented on July 10 and 20, August 9 and 16 and September 13, 1978; (2)

. Amendment Nos. 33 and 31 to Licenses Nos. OPR-31 and OPR-41 and; (3) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C.

and at the Environmental and Urban Affairs Library, Florida International University, Miami, Florida 33199. A copy of items U-(2) and (3) may be obtained upon request addressed to the U. S.

Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director, Division of Operating Reactors.  ;

I Dated at Bethesda, Maryland, this 22nd day of September,1978 l

l FOR THE NUCLEAR REGULATORY COMMISSION  !

_ UW14sd4w l

A. Schwencer, Chief  !

Operating Reactors Branch #1  ;