Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059B390 + (ML20059B390)
- ML20059B394 + (ML20059B394)
- ML20059B395 + (ML20059B395)
- ML20059B396 + (ML20059B396)
- ML20059B397 + (ML20059B397)
- 05000313/LER-1990-006, :on 900720,discovered motor-operated Valves & Actuators Located Below Current Accident Flood Elevation W/O Being Qualified for Submergence.Caused by Personnel Error. Change Initiated to Replace Components + (ML20059B399)
- ML20059B400 + (ML20059B400)
- 05000266/LER-1990-009, :on 900723,reactor Protection Sys Actuation Occurred.Caused by Fuse Failure.Failed Fuse & Fuse in Circuit Replaced + (ML20059B402)
- LG-90-025, Effluent Monitoring Rept for Jan-June 1990 + (ML20059B404)
- IR 05000456/1990013 + (ML20059B406)
- HL-4433, Forwards Revs to Relief Requests RR-V-17,RR-V-19,RR-V-20, RR-V-32,RR-V-40 & RR-V-41,providing Addl Info as Discussed in 930901 Telcon Re Second 10-yr Insp Interval IST Program + (ML20059B407)
- ML20059B408 + (ML20059B408)
- ML20059B409 + (ML20059B409)
- PNO-IV-93-030, on 931021,licensee Reported Lost Pu-beryllium Sealed Source.Licensee Plans to Remove All Neutron Sources from Storage Facility & Conduct Survey to Determine If Missing Source in Storage Bunker + (ML20059B410)
- ML20059B412 + (ML20059B412)
- ML20059B414 + (ML20059B414)
- ML20059B415 + (ML20059B415)
- ML20059B416 + (ML20059B416)
- B14634, Informs NRC of Process Used by Licensee to Comply W/ Provisions of 10CFR26,App A,Part 2.3(2) + (ML20059B417)
- ML20059B418 + (ML20059B418)
- IR 05000321/1993301 + (ML20059B419)
- ML20059B420 + (ML20059B420)
- JPN-93-090, Proposed Tech Specs Eliminating Inconsistency Between RCS Leakage Detection & Operability Requirements in LCOs 3.6.D.1 & 3.6.D.4 + (ML20059B422)
- ML20059B423 + (ML20059B423)
- ML20059B424 + (ML20059B424)
- ML20059B425 + (ML20059B425)
- IR 05000413/1993030 + (ML20059B426)
- ML20059B427 + (ML20059B427)
- ML20059B428 + (ML20059B428)
- LIC-93-0263, Forwards Changes to Fort Calhoun EPIP & RERP & Includes Summary of Changes Re Protective Action Guidelines & Recommendations + (ML20059B430)
- ML20059B431 + (ML20059B431)
- IR 05000454/1990017 + (ML20059B433)
- BSEP-93-0238, Special Rept SR 1-93-013:on 931117,fire Protection LCO A1-93-F0859 Initiated on Fire Seal R1-2-077.Seal Inoperable to Facilitate Overspeed Trip Setting Testing of HPCI & RCIC Sys.Fire Seal Restored on 931204 + (ML20059B435)
- ML20059B436 + (ML20059B436)
- ML20059B437 + (ML20059B437)
- ML20059B438 + (ML20059B438)
- ML20059B440 + (ML20059B440)
- ML20059B441 + (ML20059B441)
- AECM-90-0144, Forwards Security Boundary Upgrade Bimonthly Status Rept for Period Ending 900731,per 900330 Commitment.Rept Covering Period 900801-0930 Will Be Submitted in Oct 1990 + (ML20059B442)
- ML20059B444 + (ML20059B444)
- ML20059B445 + (ML20059B445)
- ML20059B446 + (ML20059B446)
- ML20059B447 + (ML20059B447)
- ML20059B449 + (ML20059B449)
- ML20059B453 + (ML20059B453)
- W3P90-1184, Responds to Violations Noted in Insp Rept 50-382/90-14. Corrective Actions:Local Leak Rate Test Activities Shall Be Administratively Controlled to Require Use of Test Method Other than Pressure Decay + (ML20059B456)
- ML20059B457 + (ML20059B457)
- IR 05000321/1993018 + (ML20059B460)
- 05000213/LER-1990-010, :on 900727,actuation of Reactor Protection Sys Occurred Due to Test Procedure Used at Inappropriate Time. Caused by Failure to Identify Test Procedure Incompatibility W/New Tech Spec Requirements.Procedure Revised + (ML20059B461)
- 3F1293-07, Special Rept 93-03:on 931124,ODCM Required Radiation Monitor Taken Out of Svc Due to Failure to Pass Check Source Functional Test & Unavailable for Greater than 7 Days. Subj Monitor Restored to Normal Operation on 931206 + (ML20059B462)
- IR 05000327/1993052 + (ML20059B464)