Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059B160 + (ML20059B160)
- ML20059B161 + (ML20059B161)
- RC-93-0311, Informs That Licensee Decided to Reanalyze SBLOCA W/O Credit for Increase in SI Flow for Listed Reasons,W/Respect to SG Replacement Project + (ML20059B164)
- ML20059B167 + (ML20059B167)
- ML20059B170 + (ML20059B170)
- 05000245/LER-1993-012-02, :on 930917,components Supporting Safety Related Function of FWCI Sys Were Not Category 1 or Seismically Qualified.Caused by Failure to Incorporate Sep. Upgrade Mepl for Millstone Unit 1 + (ML20059B174)
- ML20059B176 + (ML20059B176)
- IR 05000269/1993028 + (ML20059B177)
- ML20059B178 + (ML20059B178)
- ML20059B182 + (ML20059B182)
- ML20059B183 + (ML20059B183)
- ML20059B185 + (ML20059B185)
- ULNRC-02925, Special Rept 93-05:on 931020,valid Diesel Generator B Failure Occurred Due to Intermittent Speed Switch Opening Field Flashing Current Limiting Resistor.Surveillance Tests Currently Performed at Least Once Per 31 Days for DG B + (ML20059B188)
- ML20059B189 + (ML20059B189)
- ML20059B190 + (ML20059B190)
- ML20059B192 + (ML20059B192)
- ML20059B193 + (ML20059B193)
- ML20059B196 + (ML20059B196)
- ML20059B197 + (ML20059B197)
- ML20059B200 + (ML20059B200)
- ET-NRC-93-3998, Forwards Proposed Initial Conditions & Forcing Function Data for Test 220.1 of Large Scale Phase 2 Containment Tests + (ML20059B202)
- ML20059B206 + (ML20059B206)
- ML20059B207 + (ML20059B207)
- ML20059B209 + (ML20059B209)
- IR 05000346/1993026 + (ML20059B211)
- ML20059B213 + (ML20059B213)
- ML20059B214 + (ML20059B214)
- B14632, Provides Response to 930807 Petition Filed by Aj Ross Requesting NRC Action Per 10CFR2.206 & Published in Fr on 930910.W/proprietary Response.Proprietary Response Withheld + (ML20059B215)
- ML20059B217 + (ML20059B217)
- IR 05000424/1993018 + (ML20059B218)
- ML20059B219 + (ML20059B219)
- IR 05000277/1993015 + (ML20059B220)
- ML20059B221 + (ML20059B221)
- ML20059B222 + (ML20059B222)
- ML20059B223 + (ML20059B223)
- ML20059B227 + (ML20059B227)
- ML20059B229 + (ML20059B229)
- ML20059B230 + (ML20059B230)
- ML20059B232 + (ML20059B232)
- IR 05000461/1993025 + (ML20059B233)
- ML20059B236 + (ML20059B236)
- ML20059B237 + (ML20059B237)
- ML20059B238 + (ML20059B238)
- ML20059B242 + (ML20059B242)
- IR 05000416/1993031 + (ML20059B243)
- ML20059B246 + (ML20059B246)
- IR 05000445/1993037 + (ML20059B251)
- ML20059B252 + (ML20059B252)
- 05000455/LER-1990-003-11, :on 900717,feedwater Isolation Occurred Due to Inability to Control Level in D-5 Steam Generators at Low Power Levels.Caused by hi-hi Narrow Range Level on Steam Generator 2A.Signal Reset & Sys Realigned + (ML20059B253)
- ML20059B255 + (ML20059B255)
- ML20059B259 + (ML20059B259)