ML20059B160
| ML20059B160 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 12/17/1993 |
| From: | SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | |
| Shared Package | |
| ML20059B162 | List: |
| References | |
| NUDOCS 9401030368 | |
| Download: ML20059B160 (32) | |
Text
>
i.
1.
O I to Document Control Desk Letter TSP 930011 Page 1 PROPOSED TECHNICAL SPECIFICATION CHANGE --TSP 93C911 VIRGIL C. SUMMER NUCLEAR STATION LIST OF AFFECTED PAGES Page INDEX Page VII 3/4 3-42 3/4 3-45
-3/4 3-56 3/4 3-57 3/4 3-57a New Page 3/4 3-58 3/4 3-59 Deleted 3/4 3-60 Deleted 3/4 6-21 Deleted B.3/4'3-3 B.3/4 3-3a New Page B 3/4 3-3b New Page B 3/4 3-3c New-Page B 3/4 3-3d New Page I
i l
9401030368 931217 53 i
PDR ADOCK 05000395 7 i
p PDR
.l
INDEX i
LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REOUIREMENTS SECTION PAGE
-3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Integrity................................
3/4 6-1 Containment Leakage...................................
3/4 6-2 Containment Air Locks........
3/4 6-4 Internal Pressure...........
3/4 6-6 Air Temperature.....
3/4 6-7 Containment Structural Integrity......................
3/4 6-8 Containment Ventilation System......................
3/4 6 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS Reactor Building Spray System............................
3/4 6-12 Spray Additive 5ystem.........................
3/4 6-13 Reactor Building Cooling 5ystem..........................
3/4 6-14 3/4 6.3 PARTICULATE IODINE CLEANUP SYSTEM........................
3/4 6-15 3/4.6.4 CONTAINMENT ISOLATION VALVES.............................
3/4 6-17 3/4.6.5, COMBUSTIBLE GAS CONTROL g g4 G T6 0 Q drogen Monitors..........................
3/4 6-21:
Electric Hydrogen Recombiners............................
3/4 6-22 i
J SUMMER-UNIT 1 VII
l
.g TABLE 3.3-6 RADIATION MONITORING INSTRUMENTATION
^
MINIMUM CHANNELS APPLICABLE ALARM / TRIP MEASUREMENT E
INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION
[
1.
AREA MONITORS a.
Spent fuel Pool Area (RM-G8
~ - 10 mR/hr 25 4
115 niR/hr 10 b.
Reactor Building Manipulator 5
Crane Area (RM-G17A or 1
6 1 1 R/hr 1 - 10 mr/hr 28 c.
Reac di g
/
1-
~
g6T6 i.
ligh ge RM-G7 and 2/
1, 2, 3 & '4
' 'N/A 10 - 107 30 High Range RM-G18 [
1 4 07 R/hr g
^
^
^
/-
2.
PROCESS MONITORS v&
a.
Spent. Fuel Pool Exhaust -
M Ventilation System (RM-A6)
-5 6
[
- i. Gaseous Activity 1
< 1 x 10 pCi/cc 10 - 10 cm 27 a
TKr-85) 0 N/A 10 - 10 cpm 27 ii.
Particulate Activity 1
b.
Containment i.
Gaseous Activity
- Purge & Exhaust 6
Isolation (RM-A4) 1~
6 5 2 x background *** 10 - 10 cpm 28 g
9 ii.
Particulate and Gaseous M
Activity (RM-A2) - RCS 6
9 Leakage Detection 1
-1, 2, 3 & 4 N/A 10 - 10 cpm 26 6
29 c.
Control Room Isolation 1
ALL MODES 1 2 x background 10.- 10 cpm
-+
2 (RM-A1)
- With fuel in the. storage pool or building
- With irradiated. fuel in the storage pool
- Alarm / trip setpoint will be per the Operational Dose Calculation Manual when purge exhaust operations are in progress
~
2
I
.g TABLE 4.3-3 RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS E
ANALOG CHANNEL MODES FOR WHICH CHANNEL CHANNEL OPERATIONAL SURVEILLANCE E
INSTRUMENT CHECK CALIBRATION TEST IS REQUIRED w
1.
AREA MONITORS Spent Fuel Pool Area (RM-G8)
S R
H a.
M 6
b.
Reactor Building Manipulator S
R
^
}u
.#r
- Am 7
~., ifi i Range (RM-G7)M i.
R**
M 3&4 High Range,(RM-G18)
S yM 1, 2. E 2.
PROCESS MONITORS a.
Spent Fuel Pool Exhaust Area -
Ventilation System (RM-A6)
.i.
Gaseous Activity 5
R H
ii.
Particulate Activity S
R H
{
b.
Containment 1.
Gaseous Activity T
- Purge & Exhaust Isolation (RM-A4)
S R
M 6
g i
ii.
Particulate and Gaseous Activity - RCS Leakage S
R H
1, 2, 3 & 4 Detection (RM-A2) c.
Control Room Isolation (RM-A1) S R
H All MODES d.
Noble Gas Effluent Monitors g
(Migh Range) m5 i.. Main Plant Vent (RM-A13)
S R
H 1, 2, 3 & 4 4
ii. Main Steam Lines 5
-(RM-G19A, B, C)
S R
H 1,'2, 3 &.4 iii. Reactor Building Purge
-. +
z
' Supply & Exhaust System (RM-A14)
S R
.M-1, 2, 3 & 4 "With fuel in the storage pool or building
- With irradiated fuel in the storace pool
- annel li ratio ill consi of an el ronic ca ration o ie chann
, not i uding.
e dete r,
.for nge decad above 10 r and a e point c ibration eck of the electo elow R/hr an
$f kgE.
stalled or ortable a sourt
. -... ~.. -.
- b
~
3 INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION 4
LIMITING CONDITION'FOR OPERATION
'k
/
3.3.3.6 The accident monitoring instrumentation cha is sh Tabi 3.3-10 shall be OPERABLE.
APPLICABILITY: MODES 1, 2.and 3.
ACTION:
a.
With the number of OPERABLE acci t mon n
ha 1s less than the Required Number of Channels own in e 3.3 0, restore the inoperable channel (s) to 0 RA8LE'sta with
-7 days, or be in at least HOT SHUTDOWN within next 12 he s.
b.
With the number of OPERABL accident nitori channels less than the Minimum Channels 0PE LE requi nts o. Table 3.3-10; either restore the inoperable annels t L ' W atus witin 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at-least HOT SH
. wit i 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The provisions of 5 cificati 4.
not applicable.
SURVEILLANCE REQU EMENTS g
4 4.3.3.6 Eac accident
.ori instrumentation channel shall be demonstrated OPERABLE by erfo ce o th HANNEL CHECK and CHANNEL CALIBRATION operations-
. i at the fre encies own in ble 4.3-7.
P-p r b' e' yUPMER UNIT 1 3/4 3-56 w
1 c
7ABLE 3.3-10 ACCIDENT MONITORING INSTRUMENTATION m
\\
t REQUIRLD NO.
MINIMUM OF CHANNELS INSTRUMENT CilANNELS OPERABLE
=
1.
Reactor Building Wide Range Pressure 2
1 2.
Reactor Coolant Outlet Temperature - Til0T (Wide Range) 2 3.
Reactor Coolant Inlet Temperature - T e Range) 2 COLD f
\\y
/
4.
Reactor Coolant Pressure - Wide Range 1
1 5.
Pressurizer Water Level 2
1 1
6.
Steam Line Pressure 2,
gen.
1/ steam generator 7.
Steam Generator Water Level - Wide Range 1/stm. ge 1/ steam generator i
r' 8.
Emergency Feedwater Flow d
1/s gen.
1/ steam generator 1{\\
9.
Refueling Water Storage Tank er le 2
1 10.
Boric Acid Tank Water L 1
2/ tank 1/ tank 11.
Reactor Building ay P'mp
.arge F1 2
'l 12.
Reactor Bui ng Tem era r 2
1
)v
r-TABLE 3.3-10 (Continued) k ACCIDENT MONITORING INSTRUMLNIATION 9
D
\\
c-5 TOIAL MIN M
/
INSTRUMENT 0F NNELS CliANNELS PERABLf/f
~
13.
Reactor Building /RilR Sump Level rqs 2
1 4/
14.
DELETED.
15.
Condensate Storage Tank Level 2
1 16.
Reactor Building Cooling Unit Service Water Flow p
1 IL Service Water Temperature-Reactor Building oling Unit 2 pair 1 pair
{
(Inlet and Discharge)
T 18.
NaOH Storage Tank Level li; Y/
1 19.
Reactor Coolant System Subcool' Margin H nit 2
1 20.
Pressurizer PORV Position idicator 2/ valve
- 1/ valve
- 21.
Pressurizer PORV Bio Valve Pos h Indi or 1/ valve 1/ valve 22.
Pressurizer Saf Valve P ition Ind' ator 2/ valve 1/ valve ocouples f v 23.
In-Cot Th 4/ core 2/ core d'
j 8
quadrant quadrant--
g 24 Re or Ves 2
1 n
s
)1iot r uiepntS associated block valve is closed per spectrication 3.4.4.
- -g N
m
=
l l
. _. ~... _,..., _.,. _ _ _ _ _.
c TABLE 4.3-7 i
'S ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUI. NTS Cf.
CHAN>
CHANNEL
[
INSTRUMENT CK CALIBRATION 1.
Reactor Building Wide Range Pressure M
R 2.
Reactor Coolant Outlet Temperature - T de Range)
M H0 3.
Reactor Coolant Inlet Temperature - COLD (Wide t e)
M R
1 4.
Reactor Coolant Pressure - WI _ Range J7 M
R 5.
Pressurizer Water Leve L
R l/
6.
Steam Line Prese M
R h
7.
Steam Gen or Water el -
ange M
R
/
8.
Emer n M
R 9.
ST Water L el M
R 10.
Boric Acid Tank lution L M
R 11.
Reactor Building Spr ump Discharge Flow M
R
_ TABLE 4. 3-7. (continued)
ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS c
h INSTRUMENT CHANNEL CH CHECK BRATION 12.
Reactor Building Temperature M
R 13.
Reactor Building /RHR Sump Level R
14 DELETED.
15.
Condensate Storage Tank Level R
16.
Reactor Building Cooling Unit Service Water Flow M
R x*
17.
Service Water Temperature - Reac
,T Cooling Unit (Inlet and Disch e)
R Building M
18.
NaOH Storage Tank Leve I
M R
19.
Reactor Coolant stem ings in r
M R
20.
Pressuri ORV Position Indic tt M*
R*
21.
Pr urizer PORV Block Valbe
.ition dicator M
R Pressurizer Safety Valve Positi Indicator M
R y
23.
In-Core Thermocouples M
R h
24.
Reactor Vessel L M
R
~
f NotrequIdwhentheassociatedblockvalveisclosedperSpecification344 5
i e
1 CONTAllMENT SYSTEMS 3/4.6.5 COMSLE GAS CONTROL HYDROGEN MONITORS
~~
Y k
LIMITING CONDITION FOR OPERATION 3.6.5.1 Two independent containment hy rogen or.shall be OPERABLE; APPLICABILITY: MODES 1 and 2.
i r;
ACTION:
.i a.
With one hydrogen monitor i perab e, s are the inoperable monitor to OPERABLE status within 30 ays or be in t least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With both hydrogen moni ors inope
, restore at least one monitor to OPERABLE status withi 72 hpurs o in at least HOT STANDBY withiri the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
1 SURVEILLANCE REQUI EMENT J
,i
.: l
/
/.
4.6.5.1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance i
of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an ANALOG CHANNEL' OPERATIONAL TEST at least once per 31 days, and at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing 19.8 0.1 volume percent hydrogen, balance nitrogen.
w-
'l I
.3, Y) $
SUMMER - UNIT 1 3/4 6-21 Amendment No.J5'.
-j 1
L^
l
I o
INSTRUMENTATION l
BASES I
I' 3/4.3.3.3 SEISMIC INSTRUMENTATION The.0PERABILITY of the seismic instrumentation ensures that sufficient I
capability is available to promptly determine the magnitude of a seismic ~ event and evaluate the response of those features important to safety.
This capability-
)
is required to permit c;mparison of the measur:td response to that used in the-
~
design basis for the facility to determine if plant shutdown is required pursuant to Appendix "A" of 10 CFR Part 100.
The instrumentation is consistent I
with the recommendations of Regulatory 4uide 1.'12 " Instrumentation for Earth-quakes," April 1974.
3/4.3.3.4 METEOR 0l0GICAL INSTRUMENTATION The OPERABILITY Of the meteorological instrumentation ensures that sufficient rneteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere.' This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
.f 3/4.3.3.5 REMOTE SHUTOOWN INSTRUMENTATION The OPERABILITY of the remote shutdown instrumentation ensures that sufficient capability is available to permit shutdown and maintenance of HOT STANDBY of the facility from locations outside of the control room. This capability is required in the event control room habitability is lost and is consistent with General Design Criteria 19 of 10 CFR 50, 3/4.3.3.6 ACCIDENT MO S The OPERAB TY of the accident mon' ing instrumenta ures that sufficient i rmation is.available elected plant p eters to monitor ar.d asses hese variables folio g an accident. T capability is c istent with t recommendations of latory Guide 1.97 Instrumentation r Light-Wat Cooled-Nuclear Powe ants to Assess P t Conditions Dur and following.
a ccident," December 75 and NUREG 0578 MI-2 Lessons Le ed Task Force tatus Report and ' rt-Term Recommenday ns."
k h
D SUMMER - UNIT 1 B 3/4 3-3 Amendment No. 79
V
=
4 INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTI,0N PAGE 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Integrity 3/4 6-1 Containment Leakage 3/4 6-2 Containment Air Locks 3/4 6-4 Internal Pressure 3/4 6-6 Air Temperature 3/4 6-7 Containment Structural Integrity 3/4 6.............
Containment Ventilation System 3/4 6-11 3/4 6.2 DEPRESSURIZATION AND COOLING SYSTEMS Reactor Building Spray System 3/4 6-12 Spray Additive System 3/4 6-13 Reactor Building Cooling System 3/4 6-14 3/4.6.3 PARTICULATE I0 DINE CLEANUP SYSTEM 3/4 6-15 3/4 6.4 CONTAINMENT ISOLATION VALVES 3/4 6-17 3/4 6.5 COMBUSTIBLE GAS CONTROL Electric Hydrogen Recombiners 3/4.6-22 SUMMER - UNIT 1 VII Amendment No.
TABLE 3.3-6 g;
RADIATION MONITORING INSTRUMENTATION A
x i
MINIMUM c-INSTRUMENT CHANNELS APPLICABLE ALARM / TRIP MEASUREMENT
+
OPERABLE MODES SETPOINT RANGE ACTION w
1.
AREA MONITORS a.
Spent Fuel Pool Area (RM-G8) 1 s; 15 mR/hr 10 104 mR/hr 25 b.
Reactor. Building Manipulator Crane Area (RM-G17A or RM-G178) 1 6
s 1 R/hr 1 - 105 mR/hr 28 I
2.
PROCESS MONITORS a.
Spent Fuel Pool Exhaust -
w
];
Ventilation System (RM-A6) w 1.
1.
Gaseous Activity 1
s 1 x 10-5 Ci/cc 10 - 106 cpm 27 p
(Kr-85)
- 11. Particulate: Activity 1
N/A 10 - 106 cpm 27 b.
Containment
- i. Gaseous Activity - Purge &
Exhaust' Isolation (RM-A4) 1 6
s 2 x. background ***
10 -.106 cpm 28 l(
- 11. Particulate and Gaseous Activity (RM-A2) -
1 1, 2, 3 & 4 N/A 10 - 106 cpm 26 z
RCS Leakage Detection z
[l
- c. Control Room Isolation (RM-A1) 1 ALL MODES s 2 x background 10 - 106 cpm
-29 P
With fuel in the storage pool or building e-With irradiated fuel in the storage pool Alarm / trip setpoint will be per the Operational Dose Calculation Manual when purge exhaust operations are.in progress.
.E TABLE 4.3-3 j
RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS
~
w ANALOG CHANNEL MODES FOR WHICH CHANNEL CHANNEL OPERATIONAL SURVEILLANCE ~
INSTRUMENT CHECK CALIBRATION TEST IS REQUIRED-1.
AREA MONITORS a.
Spent Fuel Pool Area (RM-G8)
S R
M b.-
Reactor Building Manipulator S
R M
6 Crane Area (RM-G17A or RM-G17B)
I 2.
' PROCESS MONITORS a.
Spent Fuel Pool Exhaust Area -
Ventilation System (RM-A6) w 1.
Gaseous Activity S
R M
1 11.. Particulate Activity S
R M
w b.
Containment E
1.
Gaseous Activity
- Purge & Exhaust
. Isolation (RM-A4)
S-R M
6 ii. Particulate-and Gaseous Activity - RCS Leakage
-S R
M
. 1, 2, 3 & 4 Detection (RM-A2) c.
. Control Room Isolation (RM-A1)
S R
M All MODES d.
Noble Gas Effluent Monitors
'(High Range) 1.
Main Plant Vent (RM-A13)
S-R M
1, 2, 3 & 4
- 11. Main Steam Lines
.(RM-G19A,B,C)
S R
M 1,'2, 3 & 4 111. Reactor Building Purge Supply & Exhaust
- g System (RM-A14)
S R
M 1, 2, 3 & 4 5
With fuel in the storage pool or building 4:
With irradiated fuel in the stora.ge pool.
~
y.
~
1 INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.6 The accident monitoring instrumentation channels shown in Table 3.3-10 shall be OPERABLE.
APPLICABILITY MODES 1, 2, and 3.
ACTION:
I a.
With the number of OPERABLE accident monitoring channels less than l
the Required Number of Channels shown on Table 3.3-10, either restore the inoperable channel (s) to OPERABLE status within 30 days or-submit a Special Report within the following 14 days from the time the l
action is required. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels to operable status.
b.1 With the number of OPERABLE Reactor Building radiation monitoring channels less than the Minimum Channels Operable requirement of Table 3.3-10,eitherrestoretheinoperablechannel(s)toOPERABLEstatus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:
1)
Initiate the preplanned alternate method of monitoring the appropriateparameter(s),and j
ii)
Submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability, and the plans-and schedule for restoring the system to OPERABLE status, b.2 With the number of Hydrogen monitoring channels less than the Minimum Channels Operable requirement of Table 3.3-10, restore-at least one monitor to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.3 With the number of OPERABLE accident monitoring channels less than the Minimum Channels Operable requirement of Table 3.3-10, either restore the inoperable channels to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
c.
The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.3.3.6 Each accident monitoring instrumentation channel shall be demonstrated OPERABLE by performing a monthly CHANNEL CHECK and a CHANNEL CALIBRATION every refueling outage. The Reactor Building Radiation Level Instrumentation CHANNEL CALIBRATION may consist of an electronic calibration of the-channel, not including the detector, for the range decades above 10R/hr and a single point calibration of the detector below 10R/hr with an installed or portable gamma source.
SUMMER - UNIT 1 3/4 3-56 Amendment No.
7 TABLE 3.3-10 l
E.
ACCIDENT MONITORING INSTRUMENTATION Z
REQUIRED MINIMUM INSTRUMENT NO. OF CHANNELS CHANNELS OPERABLE 1.
Reactor Building Pressure - Narrow Range 2
1 Instrument Loop / Indicator:
Channel D IPT-951/IPI-951 Channel B IPT-952/IPI-952 2.
Reactor Building Pressure - Wide Range 2
1 Instrument Loop / Indicator:
Channel D IPT-954A/IPI-954A Channel E IPT-954B/IPI-9548 g
3.
Reactor Building Radiation Level - High Range 2
1 Instrument Loop / Indicator:
w Channel A RMG-18 h
Channel B RMG-7 4.
Reactor Building Hydrogen Concentration 2
1 Instrument Loop / Indicator:
Channel A IAE-8263A/ICI-8257 Channel B IAE-8263B/ICI-8258 5.
Reactor Building /RHR Sump Level 2
1 Instrument Loop / Indicator:
~
Channel A ILT-1969/ILI-1969 Channel B ILT-1970/ILI-1970 6.
Reactor Coolant Outlet Temperature - THot-Wide Range 2
1 Instrument-Loop / Indicator:
E Channel A ITE-413/ITI-413 E
Channel A ITE-423/ITI-423 Channel E ITE-433/ITR-413 7.
Reactor Coolant Inlet Temperature - TCold - Wide Range 2
1
.g Instrument / Loop Indicator:
Channel E ITE-410/ITI-410 Channel E ITE-420/ITI-420.
Channel E ITE-430/ITR-410
E
{
~
TABLE 3.3-10 (continued)
)
i ACCIDENT-MONITORING INSTRUMENTATION a
t i'
^
REQUIRED MINIMUM INSTRUMENT NO. OF CHANNELS CHANNELS OPERABLE 8.
Reactor Coolant Pressure - Wide Range 2
1 Instrument Loop / Indicator:
Channel E IPT-402/IPI-402 Channel A IPT-403/IPI-403 9.
Pressurizer Water Level 2
1 Instrument Loop / Indicator:
Channel A ILT-459/ILI-459A Channel D ILT-460/ILI-460 w
Channel B ILT-461/ILI-461 1
10.
Reactor Coolant System Subcooling Margin 2
1 T'
Instrument Loop / Indicator:
23 Channel A ITM-499A Channel B ITM-499B 11.
Reactor Vessel Level 2
1 Instrument Loop / Indicator:
Channel A ILT-1311/ILI-1311, ILT-1312/ILI-1312 Channel B ILT-1321/ILI-1321. ILT-1322/ILI-1322 12.
Core Exit Temperature 4/ core 2/ core Instrument Loop / Indicator:
quadrant /
quadrant /
Channel A Channel B channel channel ITEs 2,
'4,
'9, 12, 13 ITEs 1, 3,
5, 6,
7, 15, 19, 21, 22, 23, 24, 8, 10, 11, 14, 16, 17, 3
25, 26, 27, 28, 29, 31, 18, 20, 30, 34, 36, 37, 8
32, 33, 35, 39, 41,'42, 38, 40, 43, 44, 48, 49, il 45, 46, 47 50, 51 8
(Primary display is the plant computer)
S (Backup-displays are ITM 499 A&B)
EF 13.
Neutron Flux 2
1
. Instrument Loop / Indicator:
Channel 1 INI-35 Channel 2 INI-36
n g
9 TABLE 3.3-10 (continued) g ACCIDENT MONITORING INSTRUMENTATION REQUIRED MINIMUM INSTRUMENT NO. OF
- CHANNELS CHANNELS OPERABLE i
14.
Steam Line Pressure 2/stm. gen.
1/stm. gen.-
l Instrument loop / Indicator:
SG A IPTs-474, 475, 476/IPIs-474, 475, 476 SG B IPTs-484, 485, 486/IPIs-484, 485, 486
_l SG C IPTs-494, 495, 496/IPIs-494, 495, 496 15.
Steam Generator Water Level - Wide Range 1/stm. gen.
1/stm. gen.
.i Instrument Loop / Indicator:
SG A ILT-477/ILI-477 SG B ILT-487/ILI-487 g
SG C ILT-497/ILI-497 I
[
16.
Steam Generator Water Level - Narrow Range' 2/stm. gen.
1/stm. gen.
Instrument Loop / Indicator:
m SG A_ ILTs 474, 475, 476/ILIs 474, 475, 476 SG B-ILTs 484, 485, 486/ILIs 484, 485, 486 SG C ILTs-494, 495, 496/ILIs 494, 495, 496 l
17.
Emergency Feedwater Flow 2/stm.-gen.
1/stm. gen.
1 Instrument Loop / Indicator:
Channel A SG A IFT-3561/IFI-3561 SG B IFT-3571/IFI-3571 SG C.IFT-3581/IFI-3581 Channel 8 SG A IFT-3561A/IFI-35618 F
SG B IFT-3571A/IFI-3571B g
SG C IFT-3581A/IFI-3581B 18.
Refueling Water Storage Tank Level 2
1 A
, Instrument Loop / Indicator:
Channel A :ILT-990/ILI-990 2
?
Channel B ILT-992/ILI-992 8
..:;h..,
i qu i
i_'
I 1
'b h
THIS PAGE LEFT BLANK INTENTIONALLY.
.ii i
1!
Pages 3/4 3-59 and 3/4 3-60 have been deleted.
i t
~
c l,:. \\
,t
- .j
'i 3
- l
. )
?
i
+
i I
I i
-l SUMMER - UNIT 1 3/4 3-59 Amendment No.
)
A.:
.?.
t
.i This page left blankLintentionally.
t I
?
E i
,i i
i
. t
-i i
- r
., ?
s -
SUMMER - UNIT 1 3/4 6-21 Amendment No. 3, 4, 25-i
.P c
1 i
IASTRUMENTATION BASES 3/4.3.3.3 SEISMIC INSTRUMENTATION The OPERABILITY of the seismic instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility to determine if plant shutdown is required pursuant to Appendix "A" of 10 CFR Part 100. The instrumentation is consistent with the recommendations of Regulatory Guide 1.12. " Instrumentation for Earth-quakes," April 1974.
3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION The OPERABILITY of the meteorological instrumentation ensures that i
sufficient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the.need for initiating protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23,.
"Onsite Meteorological Programs," February 1972.
3/4.3.3.5 REMOTE SHUTDOWN INSTRUMENTATION The OPERABILITY of the remote shutdown instrumentation ensures that I
sufficient capability is available to permit shutdown and maintenance of HOT
'm STANDBY of the facility from locations outside of the co.itrol room. This capability is required in the event control room habitability is lost and is consistent with General Design Criteria 19 of 10 CFR 50.
l 3/4.3.3.6 ACCIDENT MONITORING-INSTRUMENTATION i
The PAM Instrumentation LCO provides OPERABILITY requirements for Regulatory I
Guide 1.97 Type A monitors, which provide information required to perform a
certain manual actions specified in the Emergency Operating Procedures. These i
manual actions ensure that a system can accomplish its safety function and are j
credited in the safety analyses. Additionally, this LC0 addresses Regulatory Guide 1.97 instruments that have been designated Category I, non-Type A.
The OPERABILITY of the PAM instrumentation ensures there is sufficient information available on selected unit parameters to monitor and assess unit status following an accident.
LC0 3.3.3.6 requires two OPERABLE channels for most Functions. Two l
GPERABLE channels ensure no single failure prevents operators from getting the information necessary for them to determine the safety status of the unit, and i
to bring the unit to and maintain it in a safe condition following an accident.
)
Furthermore, OPERABILITY of two channels allows a CHANNEL CHECK during the post accident phase to confirm the validity of displayed information.
SUMMER - UNIT 1 B 3/4 3-3 Amendment No. 79
p 4-
.2 INSTRUMENTATION BASES ACCIDENTMONITORINGINSTRUMENTATION(Continued)
Type A and Category I variables are required to meet Regulatory Guide 1.97-Category I design and qualification requirements for seismic and environmental qualification, single failure criterion, utilization of emergency _ standby power, immediately accessible display, continuous readout, and recording of display.
ine fellowing are discussions of specified instrument functions listed in Table J.2-10.
- 1. & 2.
Leactor Building Pressure Reactor Building Pressure is provided for verification of RCS and contairment OPERABILITY. Reactor Building Pressure is used to verify closure of main steam isolation valves (MSIVs), and containment spray Phase B isolation. Other manual actions based on Reactor Building Pressure include: stopping the RCPs, stopping containment spray pumps, and starting RHR pumps. Reactor Building Pressure indications are also required to calculate reactor vessel vent times.
3.
Reactor Building Radiation Level Reactor Building Radiation Level is provided to monitor the potential of significant radiation releases and to provide release assessment for use by_
operators in determining the need to invoke site emergency plans. Reactor Building Radiation Level is used to determine if a high energy line break (HELB) has occurred and whether the event is inside or outside of containment.
4.
Reactor Building Hydrogen Concentration Reactor Building Hydrogen Concentration Monitors are provided to detect high hydrogen concentration conditions that represent a potential for containment breach from a hydrogen explosion. This variable is also important in verifying the adequacy of mitigating actions. Reactor Building Hydrogen concentration is used by the operator to calculate reactor vessel vent time and is monitored as a criterion for continuing vessel venting when attempting to collapse voids.
5.
Reactor Building /RHR Sump Water Level (Wide Range)
Reactor Building /RHR Sump Water Level is provided for verification and long term surveillance of RCS integrity. Reactor Building /RHR Sump Water Level is used to determine: containment sump level accident diagnosis; when to begin the recirculation procedure; and whether to terminate SI, if still in progress.
- 6. & 7.
Reactor Coolant System (RCS) Hot and Cold Leg Temperatures RCS Hot and Cold Leg Temperatures variables provide verification of core cooling and long term RCS surveillance.
In addition,-RCS cold leg temperature is used in conjunction with RCS hot leg temperature to verify the unit conditions necessary to establish natural circulation in the RCS.
SUMMER - UNIT 1 B 3/4 3-3a Amendment No.
l INSTRUMENTATION BASES ACCIDENT MONITORING INSTRUMENTATION (Continued) 8.
Reactor Coolant Pressure RCS pressure provides verification of core cooling and RCS integrity long term j
surveillance.
RCS pressure is used to verify delivery of SI' flow to RCS from at least one train when the RCS pressure is below the pump shutoff head. RCS pressure is also used to verify closure of manually closed spray line valves and pressurizer power operated relief valves (PORVs). RCS pressure can be used:
to determine whether to terminate actuated SI or to reinitiate stopped SI; to determine when to reset SI and shut off low head SI; to manually restart low head SI;asreactorcoolantpump(RCP)tripcriteria;andtomakeadeterminationon the nature of the accident in progress and where to go next in the procedure.
RCS pressure is also related to three decisions about depressurization. They are: to determine whether to proceed with primary system depressurization; to verify termination of depressurization; and to determine whether to close accumulator isolation valves during a controlled cooldown/depressurization'.
A final use of RCS pressure is to determine whether to operate the pressurizer heaters. RCS pressure is used by the operator to monitor the cooldown of the RCS following a steam generator tube rupture (SGTR) or small break LOCA.
Operator actions to maintain a controlled cooldown, such as adjusting steam' t
generator (SG) pressure or level, would use this indication. Furthermore, RCS pressure is one factor that may be used in decisions to terminate RCP operation.
9.
Pressurizer Level l
Pressurizer Level is used to determine whether to terminate SI, if still in progress, or to reinitiate SI if it has been stopped. Knowledge of pressurizer i
water level is also used to verify the unit conditions necessary to establish natural circulation in the RCS and to verify that the unit is maintained in a l
safe shutdown condition.
- 10. Reactor Coolant System Subcooling Margin RCS hot and cold leg temperatures are used to determine RCS subcooling margin.
RCS subcooling margin will allow termination of safety injection (SI), if still in progress, or reinitiation of SI if it has been stopped. RCS subcooling i
margin is also used for unit stabilization and cooldown control.
- 11. Reactor Vessel Level Reactor Vessel Level is provided for verification and long term surveillance of core cooling.
It is also used for accident diagnosis and to determine reactor coolant inventory adequacy.
Reactor Vessel Level Monitoring provides direct measurement of collapsed liquid level above the fuel alignment plate. Collapsed level represents the amount of liquid mass that is in the reactor vessel above the core. Measurement of collapsed water level is selected because it is a direct indication of the i
water inventory.
SUMMER - UNIT 1 B 3/4 3-3b Amendment No.
i L
INSTRUMENTATION BASES 1
ACCIDENT MONITORING INSTRUMENTATION (Continued)
- 12. Core Exit Temperature Core Exit Temperature is provided for verification and long term surveillance of core cooling. Core Exit Temperature is used to determine whether to terminate SI, if still in progress, or to reinitiate SI if it has been stopped. Core Exit Temperature is also used for unit stabilization and cooldown control.
Two OPERABLE channels of Core Exit Temperature, in each quadrant, provide indication of radial distribution of coolant temperature rise across representative regions of the core. Power distribution symmetry was considered in determining the specific number and locations provided for diagnosis of local core problems. Two randomly selected thermocouples are not sufficient to meet the two thermocouples per channel requirement in any quadrant. The two thermocouples in each channel must meet the additional requirement that one is located near the center of the core and the other near the core perimeter, such that the pair of Core Exit Temperatures indicate the radial temperature gradient across their core quadrant.
Two sets of two thermocouples ensure a single failure will not disable the ability to determine _the radial temperature gradient.
13.
Neutron Flux Neutron Flux indication is provided to verify reactor shutdown. Neutron flux is used for accident diagnosis, verification of subcriticality, and diagnosis of positive reactivity insertion.
- 14. Steam Line Pressure Steam Line Pressure is used to: identify and isolate a faulted steam generator; maintain an adequate reactor heat sink; verify that EFW to steam generator associated with pipe rupture is isolated; and monitor secondary side steam pressure to: verify operation of pressure control steam dump system, monitor RCS cooldown rate, and maintain plant in cold shutdown condition.
SUMMER - UNIT 1 B 3/4 3-3c Amendment No.
d I
R. ;, '
IASTRUMENTATION BASES ACCIDENTMONITORINGINSTRUMENTATION(Continued)
- 15. & 16. Steam Generator Water Level SG Water Level is provided to monitor operation of decay heat removal via the SGs.
Temperature compensation of this indication is performed manually by the operator. -
Redundant monitoring capability is provided by two trains of instrumentation. The uncompensated level signal.is input to the unit computer, a control room indicator,.
and the Emergency Feedwater Control System.
E SG Water Level is used to: identify the faulted SG following a tube rupture; verify-
~
that the intact SGs are an adequate heat sink for the reactor; determine the nature of the accident in progress-(e.g., verify an SGTR); and verify unit' conditions for termination of SI during secondary unit HELBs'outside containment. Operator action j
is based on control room indication of SG 1evel. The RCS response during a design basis small break LOCA depends on the break size.
For a certain range of break sizes,-SG-condenser mode of heat. transfer is necessary to remove decay heat.
Operator action is required to manually raise and control SG level to establish i
heat transfer. Operator action is initiated on a loss of subcooled margin.
Feedwater flow is increased until the indicated level reaches its setpoint.
L
- 17. Emergency Feedwater Flow EFW Flow is provided to monitor operation of decay heat removal via the SGs. 'EFW-Flow to each SG is determined from a differential pressure measurement calibrated.
for a range of 0 gpm to 1000 gpm. Redundant monitoring' capability is provided by-two independent trains of instrumentation for each SG..Each differential pressure transmitter provides an input to a control room indicator and the unit computer.
Since the primary indication used by the operator during,an accident is the control room indicator, the PAM specification deals specifically with this portion of the
the SGs; to determine whether to terminate SI if still in progress, in conjunction with SG water level (narrow range); and to regulate EFW flow so that the SG tubes 1
remain covered. Operator action is required to throttle EFW flow during an SLB-accident to prevent the EFW pumps from operating in runout conditions.
EFW flow is also used by the operator to verify that the EFW System is delivering the correct flow to each SG. However, the Primary indication used by the operator to ensure-an adequate inventory is SG 1evel, j
- 18. Refueling Water Storage Tank (RWST) Level RWST Level is provided to ensure water supply for ECCS. RWST low level 4
indicaticns are used by the operator as the basis for aligning'ECCS suction
{
to the containment sump and stopping all pumps taking suction from the RWST on low-low level.
1 1
SUMMER - UNIT 1
,G 3/4 3-3d Amendment No.
~ j
a o to Document Control Desk Letter TSP 930011 Page 1 PROPOSED TECHNICAL SPECIF',ATION CHANGE - TSP 930011 VIRGIL C. SUMF., NUCLEAR STATION t
DESCRIPTION AND SAFETY EVALUATION DESCRIPTION OF AMENDMENT REQUEST SCE&G proposes to modify the VCSNS TS to revise TS 3/4.3.3.6, " Accident Monitoring Instrumentation," and associated Bases 3/4.3.3.6. This change will reflect the plant variables (key variables) that provide primary information required to permit control room operators to take specified manually controlled actions (for which no automatic control is provided) after initial stages of an accident and that are required for safety systems to accomplish their safety function for design basis accident' events.
The instrumentation, to be included in Table 3.3-10, is designated type A category 1, except for the Subcooling Margin Monitor which is category 2 but meets the intent of category 1, and non-type A category 1.
This designation i
is in accordance with the guidance given in Regulatory Guide-(RG) 1.97,.
revision 3, and-SCE&G submittal of April 15, 1985, found acceptable by the NRC in its Safety Evaluation Reports dated November 13, 1987, and July 27, 1988. The proposed TS change is consistent with NUREG-1431, Standard Technical Specifications for Westinghouse Plants. The following instrumentation shall be included in Table 3.3-10:
1.
Reactor Building Pressure - Narrow Range 2.
Reactor Building Pressure - Wida Range.
3.
Reactor Building Radiation Level - High Range 4.
Reactor Building H2 Concentration 1
5.
Reactor Building /RHR Sump Level 6.
Reactor Coolant Outlet Temperature -THot - Wide Range 7.
Reactor Coolant Inlet Temperature - TCold - Wide Range 8.
Reactor Coolant Pressure - Wide Range 9.
Pressurizer Water Level
- 10. Reactor Coolant System Subcooling Margin
- 12. Core Exit Temperature
- 13. Neutron Flux.
l
- 14. Steam Line Pressure
- 15. Steam Generator Water-Level - Wide Range l
- 16. Steam Generator Water Level - Narrow Range
- 17. Emergency Feedwater Flow
- 18. Refueling Water Storage Tank Level l
1
O
. to Document Control Desk letter TSP 930011 Page 2 The following non-Category 1 instrumentation shall be deleted from Table 3.3-10:
1.
Boric Acid Tank Water Level f
2.
Reactor Building Spray Pump Discharge Flow 3.
Reactor Building Temperature 4.
Condensate Storage Tank Level 5.
Reactor Building Conling Unit Service Water Flow 6.
Service Water Temperature-Reactor Building Cooling Unit (Inlet and Discharge) 7.
Pressurizer PORV Position Indicator 8.
Pressurizer PORV Block Valve Position Indicator 9.
Pressurizer Safety Valve Position Indicator
- 10. Sodium Hydroxide Storage Tank Level Table 4.3-7 shall be deleted.
The TS for the Reactor Building Area High Range Radiation Monitors, TS 3/4.3.3.1, Table 3.3-6 and 4.3-3, Item 1.c, and the Hydrogen Monitors TS 3/4.6.5.1, have been relocated into this TS in order to have a consistent set of technical specifications.
The allowable outage time for the accident monitoring instruments has been changed from 7 to 30 days (for conditions in which the number of OPERABLE accident monitoring channels is less than the Required Number of Channels) andfrom48hoursto7 days-(forconditionsinwhichthenumberofOPERABLE accident monitoring channels is less than the Pinimum Channels Operable),
requiring a reduction to mode 3 (HOT STAND 5Y) within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and then_to mode 4 (H0T SHUTDOWN).within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
The mode APPLICABILITY for the Reactor Bui M.og >. rogen Monitors was changed to include mode 3; the Reactor Building Ar Hff Range Radiation Monitor was changed to delete mode 4.
Administrative changes were made to TS 3/4.3.3.6, Table 3.3-10.
i SAFETY EVALUATION The proposed TS change incorporates the type A' category 1 and non-type'A category 1 variables into VCSNS's " Accident Monitoring Instrumentation. Table 9
3.3-10."
VCSNS's selection of category 1 key variables is documented in its Summary Report on Regulatory Guide 1.97, originally submitted to the NRC_on April 15, 1985, amended by various letters referenced in this amendment request (Enclosure 1), and evaluated and accepted by the NRC in its letters-of November 13, 1987, and July _ 27, 1988, and attendant Safety Evaluations.
{
l i
, to Document Control Desk Letter TSP 930011~
Page 3 Technical specifications for the Hydrogen. Monitors, TS 3/4.6.5.1, and the Reactor Building Area High Range Radiation Monitors, TS 3/4.3.3.1, Tables 3.3-6 and 4.3-3, are rejecated into the Accident Monitoring TS in order to orovide a coherent presentation of specifications covering the same subject Aatter, thus, promoting better understanding and use of technical specifications by plant personnel.
The increase of the allowable outage time from 7 to 30 days in action statement a, applicable to the condition in which the number of OPERABLE accident monitoring channels is less than the Required Number of Channels, is based on: VCSNS's low failure rates for these types of components, the availability of a remaining operable channel, the passive nature of the channel, and the low probability of an event requiring accident monitoring instrumentation during this interval, The increase of the allcwable outage ttne from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days in action statement b.3, applicable to the condition in which the number of OPERABLE accident monitoring channels is less than the Minimum Channels Operable, is based on the relatively low probability of an event requiring accident monitoring instrument operation and the availability of alternate means to obtain the required information. Continuous operation with two required channels inoperable in a function is not acceptable because the alternate indications may not fully meet the requirements applied to the accident monitoring-instrumentation. Therefore, requiring restoration of one inoperable channel of the. function limits the risk that the accident monitoring function will be degraded should an accident occur.
The change of action statement b.3 requiring the plant to go to HOT STANDBY and then to HOT SHUTDOWN has no impact on the safety of the plant since'it-r merely identifies the proper stages of plant shutdown which assumes that the-plant is at 0% power.
l l
e
. to Document Control Desk Letter TSP 930011 Page 1-PROPOSED TECHNICAL SPECIFICATION CHANGE - TSP 930011 VIRGIL C. SUMMER NUCLEAR STATION DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION DESCRIPTION Of AMENDMENT REQUEST SCE&G proposes to modify the VCSNS IS to revise TS 3/4.3.3.6, " Accident Monitoring Instrumentation," and assrciated Bases 3/4.3.3.6. This change will reflect the plant variables (ke:c variables) that provide primary information required to permit contre! room operators to take specified manually controlled actions (for whic.' no automatic control is provided) after initial stages of an accident and that are required for safety systems to accomplish their safety function for design basis accident events.
The instrumentation, to be included in Table 3.3-10, is designated type A category 1, except for the Subcooling Margin Monitor which is category 2 but meets the intent of category 1, and non-type A category 1.
This designation is in accordance with the guidance given in Regulatory Guide (RG) 1.97, revision 3, and SCE&G submittal of April 15, 1985 found acceptable by the NRC in its Safety Evaluation Reports dated November 13, 1987, and July 27, 1988.
The proposed TS change is consistent with NUREG-1431, Standard Technical Specifications for Westinghouse Plants. The following instrumentation shall be included in-Table 3.3-10:
1.
Reactor Building Pressure - Narrow Range 2.
Reactor Building Pressure - Wide Range 3.
Reactor Building Radiation Level - High Range 4.
Reactor Building H2 Concentration 5.
Reactor Building /RHR Sump Level 6.
Reactor Coolant Outlet Temperature -THot - Wide Range 7.
Reactor Coolant Inlet Temperature - TCold - Wide Range 1
8.
Reactor Coolant Pressure - Wide Range
- 9. -Pressurizer Water Level 10.
Reactor Coolant System Subcooling Margin 11.
Reactor Vessel Water Level 12.
Core Exit Temperature
- 13. Neutron Flux
- 14. Steam Line Pressure j
15.-
Steam Generator Water Level - Wide Range
- 16. Steam Generator Water Level - Narrow Range 17.
Emergency Feedwater Flow
- 18. Refueling Water Storage Tank Level
, to Document Control Desk Letter TSP 930011 Page 2 The following non-Category 1 instrumentation shall be deleted from Table 3.3-10:
1.
Boric Acid Tank Water Level 2.
Reactor Building Spray Pump Discharge Flow 3.-
Reactor Building Temperature 4.
Condensate Storage' Tank Level 5.
Reactor Building Cooling Unit Service Water Flow 6.
Service Water Temperature-Reactor Building Cooling Unit (Inlet and
+
Discharge) 7.
Pressurizer PORV Position Indicator 8.
Pressurizer PORV Block Valve Position Indicator 9.
Pressurizer Safety Valve Position Indicator
- 10. Sodium Hydroxide Storage Tank Level Table 4.3-7 shall be deleted.
I The TS for the Reactor Building Area High Range Radiation Monitors, TS 3/4.3.3.1, Table 3.3-6 and 4.3-3, Item 1.c, and the Hydrogen Monitors, TS 3/4.6.5.1, have been relocated into this TS in order to have a consistent set of technical specifications.
The allowable outage time for the accident monitoring instruments has been changed from 7 to 30 days (for conditions in which the number of OPERABLE accident monitoring channels is less than the Required Number of Channels) and from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days (for conditions in which the number of OPERABLE i
accidentmonitoringchannelsislessthantheMinimumChannelsOperable)..
requiring a reduction to mode 3 (H0T STANDBY) within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and-then to mode 4 (HOT SHUTDOWN) within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
The mode APPLICABILITY for the Reactor Building Hydrogen Monitors was changed to include mode 3; the Reactor Building Area High Range Radiation Monitor was changed to delete mode 4.
Administrative changes were made to TS 3/4.3.3.6, Table 3.3-10.
BASIS FOR DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION SCE&G has_ evaluated the proposed TS change and has determined that it does-not represent a significant hazards consideration, based on the criteria establishedin10CFR50.92(c). Operation of VCSNS in accordance with the proposed action will not:
i i
i 4
=
. Enclosure 4 to Document Control Desk Letter r
TSP 930011 Page 3 (1)
Involve a significant increase in the probability or the consequences of an accident previously evaluated.
Regulatory Guide 1.97 furnishes standards acceptable to the NRC for providing instrumentation to monitor plant variables and systems during and following an accident. The purpose of the accident monitoring instrumentation is to display plant variables that provide information required by the control room operators for manual actions and long term recovery. Determination of variable types and category designations for VCSNS was accomplished from a review of the Emergency Response Guidelines (ERGS), the Final Safety Analysis Report, and the Westinghouse Owners Group (WOG) ERGS. The WOG ERGS were used at VCSNS as a basis for the Emergency Response Procedures. Operability of the instruments used for accident monitoring ensures there is sufficient information available on selected plant parameters to monitor plant status during and following an accident. The changes proposed do not affect components that can cause an accident. The increase in allowable outage times from 7 to 30 days or from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days does not significantly affect the consequences of an event previously evaluated. The channel redundancy and the relatively short outage times, coupled with the low probability of an event requiring accident monitoring instrumentation during this interval, ensure that sufficient information is available for operator manual actions. The condition of the plant in either HOT STANDBY or HOT SHUTDOWN, the first stage of the plant shutdown process, has no impact on the assumptions made in the accident analysis.
The change in mode applicability for the Reactor Building Area High Range Radiation Monitors to include modes 1, 2, and 3, but exclude mode 4, is based on the usage of these monitors which is to indicate a significant degradation of the reactor coolant pressure boundary.
These monitors do not initiate any automatic mitigation system and are solely required to be operable to provide indication which in l
conjunction with other operator actions will aid in mitigating the consequences of design basis accidents. Design basis accident sequences which may create a significant degradation of the reactor coolant pressure boundary are not postulated to occur during mode 4.
Therefore, the proposed change does not increase the probability or consequences of any accident previously evaluated.
(2)
Create the possibility of a new or different kind of accident from any previously analyzed.
The proposed change is consistent with the requirements of.RG 1.97.
The accident monitoring instrumentation will make available reliable information to plant control room operators to mitigate l
1
.. : o
, to Document Control Desk Letter TSP 930011 Page 4 the consequences of a design basis accident. The first stages of plant shutdown, HOT STANDBY and HOT SHUTDOWN, are plant modes for which VCSNS has been analyzed. Since no plant configuration changes or changes to the mode of operation of equipment, systems, and components are introduced by the proposed technical specification, no new failure modes or accident sequences are instituted. Therefore, the changes proposed do not create the possibility of a new or different kind of accident from any previously analyzed.
(3)
Involve a significant reduction in a margin of safety.
The inclusion of category 1, type A or B, instrumentation in the TS.
provides assurance that adequate information is 6vailable to the operators to maintain VCSNS in a safe condition during and following a design basis accident. Accomplishment of specific manual action by the control room operators is enhanced due to the availability and reliability of'the indications. The proposed changes-do not affect the design or operation of safety related. components relied upon to automatically mitigate the consequences of a design basis event. The proposed change from HOT SHUTDOWN to HOT. STANDBY as the first stage of plant shutdown will not affect the design or operation of any safety related system or component. Therefore, the changes proposed would not involve a reduction in any margin of safety.
l J
i j
l 4
5